Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback

Pavements

Need 3: Pavement Management System Tools Techniques

The following boxes are specific product projects that fall under Need 3. To see the detailed product statement, click on the corresponding box.

FWD Calibration Procedures
Introduced: 1991
ETG: Materials
Current Product Phase: Supported
Expected Phase Completion: N/A
Funding Required: $3,500

Guidelines for Conducting Distress Surveys
Responsible Agency: FHWA
Funding Required: $0
ETG: Distress Profile
 Current Product Phase: Identify
Introduced: 2000
Expected Phase Completion: N/A

Guidelines for Determining (Characterizing) As-Built Material Properties
Introduced: 2000
ETG: Materials
Current Product Phase: Identify
Expected Phase Completion: N/A
Funding Required: $0

Guidelines for Temperature Adjustment of FWD Results for AC Pavements
 Responsible Agency: FHWA
Funding Required: $0
ETG: Materials
Current Product Phase: Supported
Introduced: 2001
Expected Phase Completion: N/A

Verification of Dynamic Test System - Emphasis on Resilient Modulus
Introduced: 2001
ETG: Materials
Current Product Phase: Delivery
Expected Phase Completion: 12/31/2001
Funding Required: $0

Guide for Improving the Quality of Profile Measurements
Responsible Agency: FHWA
Funding Required: $40,000
ETG: Distress Profile
Current Product Phase: Proposed
Introduced: 2002
Expected Phase Completion: N/A

ProVal version 1.0
Responsible Agency: FHWA
Funding Required: $20,000
ETG: Distress Profile
Current Product Phase: Supported
Introduced: 2001
Expected Phase Completion: 12/15/02

Software for Verifying FWD Sensor Spacing
Introduced: 1999
ETG: Materials
Current Product Phase: Development
Expected Phase Completion: N/A
Funding Required: $0

Profile Smoothness Index Relationships
Responsible Agency: FHWA
Funding Required: $0
ETG: Distress Profile
 Current Product Phase: Supported
Introduced: 2002
Expected Phase Completion: 1/1/03

2003 Distress Identification Manual
Responsible Agency: FHWA
Funding Required: $25,000
ETG: Distress Profile
Current Product Phase: Supported
Introduced: 2002
Expected Phase Completion: 10/31/03

Integrating Conditions Measurement Variability in Network Pavement Management Systems
Responsible Agency: FHWA
Funding Required: $299,982
ETG: N/A
Current Product Phase: Proposed
Introduced: 2002
Expected Phase Completion: 12/31/04

ProVal version 2.0
Responsible Agency: FHWA
Funding Required: $100,000
ETG: Distress Profile
Current Product Phase: Development
Introduced: 2003
Expected Phase Completion: 8/1/04

 
This page last modified on 07/14/06
 

FHWA
United States Department of Transportation - Federal Highway Administration