This chapter summarizes key site information, pavement design factors, and the activities for monitoring data for each of the SPS-6 projects. The SPS-6 projects are presented in the following alphabetical order:

  • Alabama (State Code: 01).
  • Arizona (04).
  • Arkansas (05).
  • California (06).
  • Illinois (17).
  • Indiana (18).
  • Iowa (19).
  • Michigan (26).
  • Missouri (29 and 29A).
  • Oklahoma (40).
  • Pennsylvania (42).
  • South Dakota (46).
  • Tennessee (47).

For each site, two tables are used. The first table summarizes key site information, such as constructed thicknesses and the number of dates for collecting monitoring data. This table shows the site and monitoring information available for each SPS-6 section. The site information section of the table includes some key information about the restoration techniques used, the pavement structure that was constructed, and significant dates for each pavement section. The monitoring information section of this table shows the number of dates for collecting monitoring data, the initial AC IRI, and the average traffic ESALs for each section.

The second table assesses whether the key site criteria for the site and monitoring data meet the expectations and general guidelines established by the LTPP program for the SPS-6 experiment. The guidelines presented in earlier chapters of this report were used to create a rating system of Yes, Almost, No, N/A, or dash (-) for each cell. A rating of "Yes" indicates that the section met the criteria, "Almost" means that the data were relatively close to meeting the established criteria, and "No" indicates that the criteria were not met. A rating of "N/A" indicates that data were not available at the time of this evaluation. A dash indicates that the cell does not apply to the criteria. For example, there is no AC thickness for bare PCC pavement and, therefore, a dash is placed in those cells.

ALABAMA

All levels of data were used to complete the summaries presented in tables 51 and 52. The information presented in table 51 that is italicized highlights information that does not meet the specifications established for this particular site and/or section. As shown, for Alabama, the original construction date does not fall within the original design parameters established for the SPS-6 experiment.

Table 52 summarizes the site and monitoring requirements that were and were not met based on the IMS data requests for this project. As shown in this table, there was not enough information available at the time of this report to determine if the traffic and as-constructed design data requirements had been met. In addition, it appears that the monitoring requirements for the FWD and profile data for immediately after rehabilitation had not been met. It may be possible that these data had been collected, but had not yet been entered into the IMS database. Also, because this section is still relatively new, none of the long-term monitoring distress requirements had been met. It is very likely that not enough time had passed for all of the long-term monitoring activities to be collected and loaded into the IMS database. Therefore, it is anticipated that the long-term monitoring requirements will be met as these pavement sections continue to age.

Table 51. Alabama SPS-6 site summary.

General Site Information:
PCC type: JPCPClimatic zone: Wet, No FreezeTraffic availability: None
Initial pavement condition: FairClimatic availability: None 
Site Information:
 Restoration TechniquePavement StructureDate
IDDesignComp- lianceAC Overlay Thick. mmPCCBaseSubgrade TypeOrig. Constr.Rehab.De- assigned
DesignActualThick. mmTypeThick. mm
0601RoutineA--N/A303N/A1131/1/19645/13/1998 
0602MinimumO--N/A303N/A1131/1/19645/13/1998 
0603MinimumA102N/AN/A303N/A1131/1/19646/26/1998 
0604Minimum*A102N/AN/A303N/A1131/1/19646/23/1998 
0605MaximumA,O--N/A303N/A1131/1/19645/18/1998 
0606MaximumA,O102N/AN/A303N/A1131/1/19646/26/1998 
0607Crack & SeatA102N/AN/A303N/A1131/1/19646/26/1998 
0608Crack & SeatA203N/AN/A303N/A1131/1/19646/26/1998 
0661Rubblized-,(1)VariableN/AN/A303N/A1131/1/19646/26/1998 
0662Rubblized-VariableN/AN/A303N/A1131/1/19646/26/1998 
0663Rubblized-VariableN/AN/A303N/A1131/1/19646/26/1998 
Monitoring Information:
 Number of Monitoring Data Collection DatesProfileTraffic
  Distress  Initial AC IRI, m/kmAverage ESALs
IDIRIFWDManualPASCOFaultingFrictionRutting
06011130200-N/A
06021130200-N/A
06031130101N/AN/A
06041130101N/AN/A
06051130200-N/A
06061130101N/AN/A
06071230101N/AN/A
06081330101N/AN/A
06611130101N/AN/A
06621130101N/AN/A
06631130101N/AN/A

General Notes:
N/A: Data are not in the IMS database yet.
Dash (-): Does not apply to this cell.
Italicized letters and numbers represent section information that was not acquired within the experiment specifications.
Thick. mm: Thickness in mm.
Orig. Constr.: Date of original construction.
Rehab.: Date of rehabilitation.

Additional Notes:
*AC overlay has been sawed and sealed.
(1)= 0.61 m did not get rubblized.
A= All requirements satisfied, M= Most requirements satisfied, O= Optional treatments applied, and D= "Do not perform" treatments applied.
113= Fine-grained soils: sandy clay.
1 mm= .039 inch

Table 52. Design and monitoring requirements for Alabama SPS-6 site.

Site Information:
SectionClimateTrafficAs Constructed
MoistureTemperatureComplianceAC Thick.PCC Thick.
010601YesYesN/AYes-N/A
010602YesYesN/AYes-N/A
010603YesYesN/AYesN/AN/A
010604YesYesN/AYesN/AN/A
010605YesYesN/AYes-N/A
010606YesYesN/AYesN/AN/A
010607YesYesN/AYesN/AN/A
010608YesYesN/AYesN/AN/A
010601YesYesN/A--N/A
010602YesYesN/A--N/A
010603YesYesN/A--N/A
Monitoring Information:
SectionMonitoring Immediately Before RehabilitationMonitoring Immediately After RehabilitationLong-Term Monitoring
DistressFWDProfileDistressFWDProfileDistressFaultingFWDRuttingProfile
010601YesYesYesYesNoNoN/AN/AN/A-N/A
010602YesYesYesYesNoNoN/AN/AN/A-N/A
010603YesYesYesYesNoNoN/A-N/AN/AN/A
010604YesYesYesYesNoNoN/A-N/AN/AN/A
010605YesYesYesYesNoNoN/AN/AN/A-N/A
010606YesYesYesYesNoNoN/A-N/AN/AN/A
010607YesYesYesYesNoNoN/A-N/AN/AN/A
010608YesYesYesYesNoNoN/A-N/AN/AN/A
010601YesYesYesYesNoNoN/A-N/AN/AN/A
010602YesYesYesYesNoNoN/A-N/AN/AN/A
010603YesYesYesYesNoNoN/A-N/AN/AN/A
Yes= Design criteria met.N/A= Not available.Almost= Close to meeting design criteria.
Dash (–)= Data do not apply to this cell.No= Design criteria not met. 

ARIZONA

All levels of data were used to complete the summaries presented in tables 53 and 54. The information presented in table 53 that is italicized highlights information that does not meet the specifications established for this particular site and/or section. As shown, for Arizona, some of the AC and PCC thicknesses and some of the traffic ESALs do not fall within the original design parameters established for the SPS-6 experiment. The sections with negative ESAL values do not have a level E record status, and it is anticipated that these values will need to be corrected before the data can reach the level E record status.

Table 54 summarizes the site and monitoring requirements that were and were not met based on the IMS data requests for this project. As shown in this table, the climatic data almost meet the requirements established for the SPS-6 experiment. Only the sections with positive ESAL values meet the requirements of the experiment. Once the sections with negative ESAL values are corrected, it is expected that all of the Arizona sections will meet the ESAL requirement. In general, most of the as-constructed design data meet the SPS-6 requirements. In addition, most of the monitoring data from immediately before and after rehabilitation were collected, with the exception of the distress data for the supplemental sections immediately before rehabilitation occurred. In general, the long-term monitoring requirements were met with the exception of faulting.

Table 53. Arizona SPS-6 site summary.

General Site Information:
PCC type: JPCPClimatic zone: Dry, FreezeTraffic availability: 4 to 9 years
Initial pavement condition: PoorClimatic availability: 31 years 
Site Information:
 Restoration TechniquePavement StructureDate
IDDesignComp- lianceAC Overlay Thick. mmPCCBaseSub- grade TypeOrig. Constr.Rehab.De- assigned
DesignActualThick. mmTypeThick. mm
0601RoutineA--201302,3313252871/1/19677/12/19904/28/1995
0602MinimumO--203302,307, 3318532871/1/19677/12/19904/28/1995
0603MinimumO102102211302,3313072871/1/19677/25/1990 
0604Minimum*A,O102102208302,3312742871/1/196710/6/1990 
0605MaximumM,O--211302,307, 3318512151/1/19678/20/19904/28/1995
0606MaximumM,O102119216302,3312922151/1/196710/6/1990 
0607Crack & SeatM102117213302,307, 3314522871/1/196710/6/1990 
0608Crack & SeatM203224208302,307, 3314622151/1/196710/6/1990 
0659Rubblized-Variable11421374,302, 3312412151/1/196710/6/1990 
0660Crack & Seat-Variable216211302,3312842151/1/19678/6/1990 
0661Crack & Seat-Variable114213302,3312792871/1/196710/6/1990 
0662Crack & Seat-Variable114203302,307, 3317622151/1/196710/6/1990 
0663Crack & Seat-Variable203-mm-PCC over 51-mm AC254302,3312392151/1/19678/5/1990 
0664No Maint.-Variable152201302,3313152871/1/196712/4/1992 
0665Crack & Seat-Variable152201302,3313152871/1/196712/4/1992 
0666Rubblized-Variable152201302,3313152871/1/196712/4/1992 
0667Crack & Seat-Variable152201302,3313152871/1/196712/4/1992 
0668No Maint.-Variable152201302,3313152871/1/196712/4/1992 
0669Rubblized-Variable152201302,3073152871/1/196712/4/1992 
Monitoring Information:
 Number of Monitoring Data Collection DatesProfileTraffic
  Distress  Initial AC IRI, m/kmAverage ESALs
IDIRIFWDManualPASCOFaultingFrictionRutting
06013412122-1,951,989
06024512122-1,588,852
060396320240.88-44,314
060496320240.86-45,642
06054422222-1,596,797
060696320241.00-40,129
060796320240.80-41,554
060896320240.90-32,210
065995310231.06-258,921
066095310231.01-249,741
066195310230.72-258,921
066296310230.77-263,368
066394414211.44-505,622

1 mm= .039 inch

Table 54. Design and monitoring requirements for Arizona SPS-6 site.

Site Information:
SectionClimateTrafficAs Constructed
MoistureTemperatureComplianceAC Thick.PCC Thick.
040601AlmostYesYesYes-Yes
040602AlmostYesYesYes-Yes
040603AlmostYesNoYesYesYes
040604AlmostYesNoYesYesYes
040605AlmostYesYesYes-Yes
040606AlmostYesNoYesNoYes
040607AlmostYesNoYesNoYes
040608AlmostYesNoYesAlmostYes
040659AlmostYesNo--Yes
040660AlmostYesNo--Yes
040661AlmostYesNo--Yes
040662AlmostYesNo--Yes
040663AlmostYesNo--Yes
040664AlmostYesNo--Almost
040665AlmostYesNo--Almost
040666AlmostYesNo--Almost
040667AlmostYesNo--Almost
040668AlmostYesNo--Almost
040669AlmostYesNo--Almost
Monitoring Information:
SectionMonitoring Immediately Before RehabilitationMonitoring Immediately After RehabilitationLong-Term Monitoring
DistressFWDProfileDistressFWDProfileDistressFaultingFWDRuttingProfile
040601AlmostYesYesAlmostAlmostAlmostAlmostNoYes--Yes
040602AlmostYesYesAlmostAlmostAlmostAlmostNoYes-Yes
040603AlmostYesYesAlmostAlmostAlmostAlmost-AlmostAlmostYes
040604AlmostYesYesAlmostAlmostAlmostAlmost-AlmostAlmostYes
040605AlmostYesYesAlmostAlmostAlmostAlmostYesYes-Yes
040606AlmostYesYesAlmostAlmostAlmostAlmost-AlmostAlmostYes
040607AlmostYesYesAlmostAlmostAlmostAlmost-AlmostAlmostYes
040608AlmostYesYesAlmostAlmostAlmostAlmost-AlmostAlmostYes
040659NoYesYesAlmostAlmostAlmostAlmost-AlmostYesYes
040660NoYesYesAlmostAlmostAlmostAlmost-AlmostYesYes
040661NoYesYesAlmostAlmostAlmostAlmost-AlmostYesYes
040662NoYesYesAlmostAlmostAlmostAlmost-AlmostYesYes
040663NoYesYesAlmostAlmostAlmostAlmost-AlmostNoYes
040664NoNoNoAlmostAlmostAlmostAlmost-AlmostYesYes
040665NoNoNoAlmostAlmostAlmostAlmost-AlmostYesYes
040666NoNoNoAlmostAlmostAlmostAlmost-AlmostYesYes
040667NoNoNoAlmostAlmostAlmostAlmost-AlmostYesYes
040668NoNoNoAlmostAlmostAlmostAlmost-AlmostYesYes
040669NoNoNoAlmostAlmostAlmostAlmost-AlmostYesYes
Yes= Design criteria met.No= Design criteria not met.
Almost= Close to meeting design criteria.Dash (-)= Data do not apply to this cell.

ARKANSAS

All levels of data were used to complete the summaries presented in tables 55 and 56. The information presented in table 55 that is italicized highlights information that does not meet the specifications established for this particular site and/or section. It should be noted that the as-constructed design data were not available in the IMS at this time. Excluding the as-constructed design data, only a few sections did not meet the design criteria for the SPS-6 experiment because of variations in rehabilitation techniques. All other design features for this section met the original design expectations for the SPS-6 experiment.

Table 56 summarizes the site and monitoring requirements that were and were not met based on the IMS data requests for this project. As shown in this table, the climatic data almost meet the requirements established for the SPS-6 experiment. Only the sections with positive ESAL values meet the requirements of the experiment. Once the sections with negative ESAL values are corrected, it is expected that all of the Arizona sections will meet the ESAL requirement. In general, most of the as-constructed design data meet the SPS-6 requirements. In addition, most of the monitoring data from immediately before and after rehabilitation were collected, with the exception of the distress data for the supplemental sections immediately before rehabilitation occurred. In general, the long-term monitoring requirements were met with the exception of faulting.

Table 55. Arkansas SPS-6 site summary.

General Site Information:
PCC type: JPCPClimatic zone: Wet, No FreezeTraffic availability: None
Initial pavement condition: PoorClimatic availability: 18 years 

1 mm= .039 inch

Site Information:
 Restoration TechniquePavement StructureDate
IDDesignComplianceAC Overlay Thick. mmPCCBaseSubgrade TypeOrig. Constr.Rehab.Deassigned
DesignActualThick. mmTypeThick. mm
0601RoutineO,D-N/AN/A339N/AN/A1/1/197912/1/1996 
0602MinimumO-N/AN/A339N/AN/A1/1/197912/1/1996 
0603MinimumO,D102N/AN/A339N/AN/A1/1/197912/17/1996 
0604Minimum*A,O,D102N/AN/A339N/AN/A1/1/197910/15/1996 
0605MaximumA,O-N/AN/A339N/AN/A1/1/197912/26/1996 
0606MaximumA,O,D102N/AN/A339N/AN/A1/1/197912/11/1996 
0607Crack & SeatA,(1),(2)102N/AN/A339N/AN/A1/1/197911/11/1996 
0608Crack & SeatA,(1)203N/AN/A339N/AN/A1/1/197911/11/1996 
Monitoring Information:
 Number of Monitoring Data Collection DatesProfileTraffic
  Distress  Initial AC IRI, m/kmAverage ESALs
IDIRIFWDManualPASCOFaultingFrictionRutting
06012320200-N/A
06025320200-N/A
060342201000.91N/A
060452201010.99N/A
06053320200-N/A
060643201010.98N/A
060752201001.05N/A
060842201000.87N/A

General Notes:
N/A: Data are not in the IMS database yet.
Dash (-): Does not apply to this cell.
Italicized letters and numbers represent section information that was not acquired within the experiment specifications.

Abbreviations:
Thick. mm
= Thickness in mm;
Orig. Constr.= Date of original construction;
Rehab.= Rehabilitation.

Additional Notes:
*AC overlay has been sawed and sealed.
A= All requirements satisfied, M= Most requirements satisfied, O= Optional treatments applied, and D= "Do not perform" treatments applied.
(1)= Did not receive a full-depth hairline cracking pattern.
(2)= Traffic permitted on AC leveling coarse prior to placement of the AC surface coarse and cold paving joint within the section.

Table 56. Design and monitoring requirements for Arkansas SPS-6 site.

Site Information:
SectionClimateTrafficAs Constructed
MoistureTemperatureComplianceAC Thick.PCC Thick.
05A601YesYesN/ANo-N/A
05A602YesYesN/AYes-N/A
05A603YesYesN/ANoN/AN/A
05A604YesYesN/ANoN/AN/A
05A605YesYesN/AYes-N/A
05A606YesYesN/ANoN/AN/A
05A607YesYesN/AYesN/AN/A
05A608YesYesN/AYesN/AN/A
Monitoring Information:
SectionMonitoring Immediately Before RehabilitationMonitoring Immediately After RehabilitationLong-Term Monitoring
DistressFWDProfileDistressFWDProfileDistressFaultingFWDRuttingProfile
05A601YesYesYesAlmostYesAlmostN/AN/AN/A-N/A
05A602YesYesYesAlmostYesAlmostN/AN/AN/A-N/A
05A603YesYesYesAlmostYesYesN/A-N/AN/AYes
05A604YesYesYesAlmostYesYesN/A-N/AN/AYes
05A605YesYesYesAlmostYesAlmostN/AN/AN/A-N/A
05A606YesYesYesAlmostYesYesN/A-N/AN/AYes
05A607YesYesYesAlmostYesYesN/A-N/AN/AYes
05A608YesYesYesAlmostYesYesN/A-N/AN/AYes
Yes= Design criteria met.N/A= Not available.Almost= Close to meeting design criteria.
Dash (-)= Data do not apply to this cell.No= Design criteria not met. 

CALIFORNIA

All levels of data were used to complete the summaries presented in tables 57 and 58. The information presented in table 57 that is italicized highlights information that does not meet the specifications established for this particular site and/or section. As shown, for California, some of the layer properties and traffic levels do not fall within the original design parameters established for the SPS-6 experiment. The sections with negative ESAL values do not have a level E record status, and it is anticipated that these values will need to be corrected before the data can reach the level E record status.

Table 58 summarizes the site and monitoring requirements that were and were not met based on the IMS data requests for this project. As shown in this table, the climatic requirements were not met for this site. Only the sections with positive ESAL values meet the requirements of the experiment. Once the sections with negative ESAL values are corrected, it is expected that all of the California sections will meet the ESAL requirement. In general, most of the as-constructed design data meet the SPS-6 requirements. In addition, most of the monitoring data from immediately before and after rehabilitation were collected. In general, the long-term monitoring requirements were met.

Table 57. California SPS-6 site summary.

General Site Information:
PCC type: JPCPClimatic zone: Dry, FreezeTraffic availability: 3 to 6 years
Initial pavement condition: PoorClimatic availability: None; 
Site Information:
 Restoration TechniquePavement StructureDate
IDDesignComplianceAC Overlay Thick. mmPCCBaseSubgrade TypeOrig. Constr.Rehab.De- assigned
DesignActualThick. mmTypeThick. mm
0601RoutineA--N/A---8/1/19745/20/1992 
0602MinimumO--2183311042538/1/19745/20/1992 
0603MinimumO102972033311022538/1/19749/1/1992 
0604Minimum*A,O1021142113311302538/1/19749/1/1992 
0605MaximumM,O--2263311142538/1/19745/19/1992 
0606MaximumA,M102792083311142538/1/19749/1/1992 
0607Crack & SeatA102942083311172538/1/19749/1/1992 
0608Crack & SeatA2032062163311122038/1/19749/1/1992 
0659Crack & No Seat-Variable1072163311242538/1/19748/31/1992 
0660Crack & Seat-Variable10711474,3312112538/1/19748/30/1992 
0661Crack & Seat-Variable10721674,3311302538/1/19748/30/1992 
0662Crack & Seat-Variable-2083311302038/1/19745/26/1992 
0663Crack & Seat-VariableAC?253311372038/1/19749/1/1992 
0664Crack & Seat-Variable10721185,3311352538/1/19749/1/1992 
Monitoring Information:
 Number of Monitoring Data Collection DatesProfileTraffic
  Distress  Initial AC IRI, m/kmAverage ESALs
IDIRIFWDManualPASCOFaultingFrictionRutting
06010000000-N/A
06025652403-856,852
060366620070.85-437,854
060455520070.81-435,129
06055532303-860,924
060656620070.95-437,715
060756620071.01-436,849
060866720060.89-429,810
065954410040.70-776,938
066056520040.81-781,258
066156420040.83-776,938
06625542004--781,923
06635542401-?-783,419
066475720050.91-777,602

General Notes:
N/A: Data are not in the IMS database yet.
Dash (-): Does not apply to this cell.
Italicized letters and numbers represent section information that was not acquired within the experiment specifications.

Abbreviations:
Thick. mm
= Thickness in mm;
Orig. Constr.= Date of original construction;
Rehab.= Rehabilitation.

Additional Notes:
*AC overlay has been sawed and sealed.
A= All requirements satisfied, M= Most requirements satisfied, O= Optional treatments applied, and D= "Do not perform" treatments applied.
203= Coarse-grained soils: poorly graded sand with gravel.
253= Coarse-grained soils: poorly graded gravel with sand.
1 mm= .039 inch

Table 58. Design and monitoring requirements for California SPS-6 site.

Site Information:
SectionClimateTrafficAs Constructed
MoistureTemperatureComplianceAC Thick.PCC Thick.
060601NoNoN/AYes-Yes
060602NoNoYesYes-Yes
060603NoNoNoYesYesYes
060604NoNoNoYesAlmostYes
060605NoNoYesYes-Yes
060606NoNoNoYesNoYes
060607NoNoNoYesAlmostYes
060608NoNoNoYesYesYes
060659NoNoNo--Yes
060660NoNoNo--No
060661NoNoNo--Yes
060662NoNoNo--Yes
060663NoNoNo--No
060664NoNoNo--Yes
Monitoring Information:
SectionMonitoring Immediately Before RehabilitationMonitoring Immediately After RehabilitationLong-Term Monitoring
DistressFWDProfileDistressFWDProfileDistressFaultingFWDRuttingProfile
040601N/AN/AN/AN/AN/AN/AN/AN/AN/A-N/A
040602YesYesYesYesYesAlmostAlmostAlmostAlmost-Almost
040603YesYesYesYesYesAlmostAlmost-AlmostYesAlmost
040604YesYesYesYesYesAlmostAlmost-AlmostYesAlmost
040605YesYesYesYesYesAlmostAlmostAlmostAlmost-Almost
040606YesYesYesYesYesAlmostAlmost-AlmostYesAlmost
040607YesYesYesYesYesAlmostAlmost-AlmostYesAlmost
040608YesYesYesYesYesAlmostAlmost-AlmostYesAlmost
040659YesYesYesYesYesAlmostAlmost-AlmostYesAlmost
040660YesYesYesYesYesAlmostAlmost-AlmostYesAlmost
040661YesYesYesYesYesAlmostAlmost-AlmostYesAlmost
040662YesYesYesYesYesAlmostAlmost-AlmostYesAlmost
040663YesYesYesYesYesAlmostAlmost-AlmostNoAlmost
040664YesYesYesYesYesAlmostAlmost-AlmostYesYes
Yes= Design criteria met.No= Design criteria not met.
Almost= Close to meeting design criteria.Dash (-)= Data do not apply to this cell.
No= Design criteria not met.
 

ILLINOIS

All levels of data were used to complete the summaries presented in tables 59 and 60. The information presented in table 59 that is italicized highlights information that does not meet the specifications established for this particular site and/or section. As shown, for Illinois, the original construction date and some of the pavement layer properties do not fall within the original design parameters established for the SPS-6 experiment.

Table 60 summarizes the site and monitoring requirements that were and were not met based on the IMS data requests for this project. As shown in this table, the climate, traffic, and, in general, the as-constructed design data meet the design requirements established for the SPS-6 projects. Most of the monitoring requirements for before and after rehabilitation were met. On average, the long-term monitoring requirements were met.

Table 59. Illinois SPS-6 site summary.

General Site Information:
PCC type: JRCPClimatic zone: Wet, FreezeTraffic availability: 8 years
Initial pavement condition: PoorClimatic availability: 17 years 
Site Information:
 Restoration TechniquePavement StructureDate
IDDesignComplianceAC Overlay Thick. mmPCCBaseSubgrade TypeOrig. Constr.Rehab.Deassigned
DesignActualThick. mmTypeThick. mm
0601RoutineA--2593021781134/1/19654/16/1990 
0602MinimumO--2573021781134/1/19654/16/1990 
0603MinimumA102942543021781134/1/19656/11/1990 
0604Minimum*A,O102942593021781134/1/19656/11/1990 
0605MaximumA,O--2593021781134/1/19655/18/1990 
0606MaximumA,O102792573021781134/1/19656/18/1991 
0607Crack & SeatA102942573021781134/1/19656/18/1990 
0608Crack & SeatA2031732573021781134/1/19656/18/1991 
0659State Rehab.-Variable842593021781134/1/19656/18/1991 
0660Milling---2593021781134/1/19655/17/1990 
0661Diamond Grinding---2673021781134/1/19655/18/1990 
0662State Rehab.-Variable892593021781134/1/19656/11/1991 
0663Rubblized-Variable2032543021781134/1/19656/18/1990 
0664Rubblized-Variable1522543021781134/1/19656/18/1990 
Monitoring Information:
 Number of Monitoring Data Collection DatesProfileTraffic
  Distress  Initial AC IRI, m/kmAverage ESALs
IDIRIFWDManualPASCOFaultingFrictionRutting
06019794812-619,495
06028784812-619,495
060387740181.02619,495
060488640171.13619,495
06057674812-619,495
060687740171.07619,495
060788640161.22619,495
060897640161.16619,495
065976620161.37619,495
066076452512-619,495
06617642412-619,495
066296620141.10619,495
066396420140.92619,495
066486320131.08619,495

General Notes:
N/A: Data are not in the IMS database yet.
Dash (-): Does not apply to this cell.
Italicized letters and numbers represent section information that was not acquired within the experiment specifications.

Abbreviations:
Thick. mm
= Thickness in mm;
Orig. Constr.= Date of original construction;
Rehab.= Rehabilitation.

Additional Notes:
*AC overlay has been sawed and sealed.
A= All requirements satisfied, M= Most requirements satisfied, O= Optional treatments applied, and D= "Do not perform" treatments applied.
113= Fine-grained soils: Sandy clay.

1 mm= .039 inch

Table 60. Design and monitoring requirements for Illinois SPS-6 site.

Site Information:
SectionClimateTrafficAs Constructed
MoistureTemperatureComplianceAC Thick.PCC Thick.
170601YesYesYesYes-Almost
170602YesYesYesYes-Almost
170603YesYesYesYesAlmostYes
170604YesYesYesYesAlmostAlmost
170605YesYesYesYes-Almost
170606YesYesYesYesNoAlmost
170607YesYesYesYesAlmostAlmost
170608YesYesYesYesNoAlmost
170659YesYesYes--Almost
170660YesYesYes--Almost
170661YesYesYes--Almost
170662YesYesYes--Almost
170663YesYesYes--Yes
170664YesYesYes--Yes
Monitoring Information:
SectionMonitoring Immediately Before RehabilitationMonitoring Immediately After RehabilitationLong-Term Monitoring
DistressFWDProfileDistressFWDProfileDistressFaultingFWDRuttingProfile
170601YesYesYesYesYesAlmostAlmostAlmostAlmost-Yes
170602YesYesYesYesYesNoAlmostAlmostAlmost-Almost
170603YesYesYesYesYesAlmostAlmost-AlmostYesYes
170604YesYesYesYesYesAlmostAlmost-AlmostYesYes
170605YesYesYesYesYesNoAlmostAlmostAlmost-Almost
170606AlmostYesAlmostAlmostYesAlmostAlmost-AlmostYesYes
170607YesYesYesAlmostAlmostAlmostAlmost-AlmostYesYes
170608YesAlmostYesAlmostAlmostAlmostAlmost-AlmostYesYes
170659YesYesYesAlmostYesYesAlmost-AlmostYesYes
170660YesYesYesYesYesNoAlmostAlmostAlmost-Yes
170661YesYesYesYesYesNoAlmostAlmostAlmost-Yes
170662YesAlmostYesYesYesAlmostAlmost-AlmostYesYes
170663YesYesYesYesYesAlmostAlmost-AlmostYesYes
170664YesYesYesYesYesAlmostAlmost-AlmostAlmostYes
Yes= Design criteria met.No= Design criteria not met.
Almost= Close to meeting design criteria.Dash (-)= Data do not apply to this cell.

INDIANA

All levels of data were used to complete the summaries presented in tables 61 and 62. The information presented in table 61 that is italicized highlights information that does not meet the specifications established for this particular site and/or section. As shown, for Indiana, only section 180603 does not meet the original design parameters for the SPS-6 experiment because of deviations that occurred during application of the rehabilitation treatments. In addition, it should be noted that all of the material properties appear to be design values and are not based on field data. The field data should be reviewed and these fields in the database should be corrected.

Table 62 summarizes the site and monitoring requirements that were and were not met based on the IMS data requests for this project. As shown in this table, the climate, traffic, and most of the as-constructed design data requirements were met. It is important to note that the as-constructed design data appear to be the design values and are not currently based on field measurements. This should be addressed prior to further analysis of these pavement sections. In addition, most of the monitoring requirements for before and after rehabilitation were met. On average, the long-term monitoring requirements were also met.

Table 61. Indiana SPS-6 site summary.

General Site Information:
PCC type: JPCPClimatic zone: Wet, FreezeTraffic availability: 3 years
Initial pavement condition: PoorClimatic availability: 25 years 
Site Information:
 Restoration TechniquePavement StructureDate
IDDesignComplianceAC Overlay Thick. mmPCCBaseSubgrade TypeOrig. Constr.Rehab.Deassigned
DesignActualThick. mmTypeThick. mm
0601RoutineA--25432676-1/1/19746/11/19907/27/1993
0602MinimumO--254326761131/1/19746/11/1990 
0603MinimumO,D102102254326761131/1/19748/30/1990 
0604Minimum*A,O102102254326761131/1/19748/30/1990 
0605MaximumM,O--254326761131/1/19746/27/1990 
0606MaximumA,O102102254326761131/1/19748/30/1990 
0607Crack & SeatA102102254326761131/1/19748/30/1990 
0608Crack & SeatA203203254326761131/1/19748/30/1990 
0659Minimum-Variable140254326761131/1/19748/30/1990 
0660Minimum-Variable140254326761131/1/19748/30/1990 
0661Minimum-Variable102254326761131/1/19748/30/1990 
0662Crack & Seat-Variable254254326761131/1/19748/30/1990 
0663Crack & Seat-Variable140254326761131/1/19748/30/1990 
0664Crack & Seat-Variable140254326761131/1/19748/30/1990 
0665Crack & Seat-Variable140254326761131/1/19748/30/1990 
0666Crack & Seat-Variable140254326761131/1/19748/30/1990 
0667Crack & Seat-Variable140254326761131/1/19748/30/1990 
0668Crack & Seat-Variable140254326761131/1/19748/30/1990 
0669Crack & Seat-Variable102254326761131/1/19748/30/1990 
0670Crack & Seat-Variable102254326761131/1/19748/30/1990 
0671Crack & Seat-Variable102254326761131/1/19748/30/1990 
0672Minimum-Variable140254326761131/1/19748/30/1990 
Monitoring Information:
 Number of Monitoring Data Collection DatesProfileTraffic
  Distress  Initial AC IRI, m/kmAverage ESALs
IDIRIFWDManualPASCOFaultingFrictionRutting
06012322061-443,417
060213753472-443,417
060385530640.88443,417
060496740770.92443,417
060513644472-443,417
0606125540750.94443,417
060796640750.99443,417
0608106540750.93443,417
065984320741.10443,417
066083320751.10443,417
0661103521750.95443,417
0662115420750.85443,417
066385320751.17443,417
066484320751.15443,417
066575420750.93443,417
066675320750.88443,417
066793320750.95443,417
066873320751.07443,417
066984420751.04443,417
067084420751.00443,417
067173320751.08443,417
067283320751.10443,417

General Notes:
N/A: Data are not in the IMS database yet.
Dash (-): Does not apply to this cell.
Italicized letters and numbers represent section information that was not acquired within the experiment specifications.

Abbreviations:
Thick. mm
= Thickness in mm; Orig. Constr.= Date of original construction; Rehab.= Rehabilitation.

Additional Notes:
*AC overlay has been sawed and sealed.
A= All requirements satisfied, M= Most requirements satisfied, O= Optional treatments applied, and D= "Do not perform" treatments applied.
113= Fine-grained soils: Sandy clay.

1 mm= .039 inch

Table 62. Design and monitoring requirements for Indiana SPS-6 site.

Site Information:
SectionClimateTrafficAs Constructed
MoistureTemperatureComplianceAC Thick.PCC Thick.
180601YesYesYesYes-Yes*
180602YesYesYesYes-Yes*
180603YesYesYesNoYes*Yes*
180604YesYesYesYesYes*Yes*
180605YesYesYesYes-Yes*
180606YesYesYesYesYes*Yes*
180607YesYesYesYesYes*Yes*
180608YesYesYesYesYes*Yes*
180659YesYesYes--Yes*
180660YesYesYes--Yes*
180661YesYesYes--Yes*
180662YesYesYes--Yes*
180663YesYesYes--Yes*
180664YesYesYes--Yes*
180665YesYesYes--Yes*
180666YesYesYes--Yes*
180667YesYesYes--Yes*
180668YesYesYes--Yes*
180669YesYesYes--Yes*
180670YesYesYes--Yes*
180671YesYesYes--Yes*
180672YesYesYes--Yes*
Monitoring Information:
SectionMonitoring Immediately Before RehabilitationMonitoring Immediately After RehabilitationLong-Term Monitoring
DistressFWDProfileDistressFWDProfileDistressFaultingFWDRuttingProfile
180601YesYesYesNoYesNoYesNoYes-Yes
180602YesYesYesNoYesYesAlmostAlmostAlmost-Yes
180603YesNoYesAlmostNoYesAlmost-AlmostYesYes
180604YesYesYesAlmostYesYesAlmost-AlmostYesYes
180605YesYesYesAlmostYesYesAlmostAlmostAlmost-Yes
180606YesNoYesAlmostNoYesAlmost-AlmostYesYes
180607YesYesYesAlmostYesYesAlmost-AlmostYesYes
180608YesYesYesAlmostYesYesAlmost-AlmostYesYes
180659YesYesYesNoNoYesYes-AlmostYesYes
180660YesNoYesNoNoYesAlmost-NoYesYes
180661YesNoYesNoNoYesAlmost-NoYesYes
180662YesNoYesNoYesYesAlmost-AlmostYesYes
180663YesYesYesNoYesYesAlmost-AlmostYesYes
180664YesYesYesNoYesYesAlmost-NoYesYes
180665YesYesYesNoYesYesAlmost-AlmostYesYes
180666YesYesYesNoYesYesAlmost-AlmostYesYes
180667YesNoYesNoNoYesAlmost-NoAlmostYes
180668YesNoYesNoNoYesAlmost-NoYesYes
180669YesNoYesNoNoYesAlmost-AlmostYesYes
180670YesNoYesNoNoYesAlmost-AlmostYesYes
180671YesNoYesNoNoYesAlmost-NoAlmostYes
180672YesNoYesNoNoYesAlmost-NoAlmostYes
Yes= Design criteria met.No= Design criteria not met.
Almost= Close to meeting design criteriaDash (-)= Data do not apply to this cell.

Thickness information appears to be design information, not field measured as expected.

IOWA

All levels of data were used to complete the summaries presented in tables 63 and 64. The information presented in table 63 that is italicized highlights information that does not meet the specifications established for this particular site and/or section. As shown, for Iowa, only a few of the design properties do not meet the original design parameters established for the SPS-6 experiment.

Table 64 summarizes the site and monitoring requirements that were and were not met based on the IMS data requirements for this project. As shown in this table, currently the climate, traffic, and most of the as-constructed design data meet the design requirements. In addition, most of the monitoring requirements for immediately before and after rehabilitation were met, with the exception of the profile immediately before rehabilitation. In general, the long-term monitoring requirements were met, with the exception of faulting.

Table 63. Iowa SPS-6 site summary.

General Site Information:
PCC type: JRCPClimatic zone: Wet, FreezeTraffic availability: 4 years
Initial pavement condition: FairClimatic availability: 32 years 
Site Information:
 Restoration TechniquePavement StructureDate
IDDesignComplianceAC Overlay Thick. mmPCCBaseSubgrade TypeOrig. Constr.Rehab.Deassigned
DesignActualThick. mmTypeThick. mm
0601RoutineA--25430310211311/1/19658/17/1989 
0602MinimumO--25730310211311/1/19658/17/1989 
0603MinimumO,D10210225430310211311/1/19658/17/1989 
0604Minimum*A10211724630310211311/1/19658/17/1989 
0605MaximumA,O--25430310211311/1/19658/17/1989 
0606MaximumA,O10210425430310211311/1/19658/17/1989 
0607Crack & SeatA10210425430310211311/1/19658/30/1989 
0608Crack & SeatA20320325430310211311/1/19658/22/1989 
0659State Rehab.-Variable10224430310211311/1/19657/20/1989 
Monitoring Information:
 Number of Monitoring Data Collection DatesProfileTraffic
  Distress  Initial AC IRI, m/kmAverage ESALs
IDIRIFWDManualPASCOFaultingFrictionRutting
06017644819-369,844
06025634818-371,523
0603107440080.90368,591
0604107440081.06368,591
06055834828-368,591
060686440080.92368,591
060798540081.02368,591
0608108540081.21368,591
065987420081.00368,591

General Notes:
N/A: Data are not in the IMS database yet.
Dash (-): Does not apply to this cell.
Italicized letters and numbers represent section information that was not acquired within the experiment specifications.

Abbreviations:
Thick. mm
= Thickness in mm;
Orig. Constr.= Date of original construction;
Rehab.= Rehabilitation.

Additional Notes:
*AC overlay has been sawed and sealed.
A= All requirements satisfied, M= Most requirements satisfied, O= Optional treatments applied, and D= "Do not perform" treatments applied.
113= Fine-grained soils: Sandy clay.

1 mm= .039 inch

Table 64. Design and monitoring requirements for Iowa SPS-6 site.

Site Information:
SectionClimateTrafficAs Constructed
MoistureTemperatureComplianceAC Thick.PCC Thick.
190601YesYesYesYes-Yes
190602YesYesYesYes-Almost
190603YesYesYesNoYesYes
190604YesYesYesYesNoYes
190605YesYesYesYes-Yes
190606YesYesYesYesYesYes
190607YesYesYesYesYesYes
190608YesYesYesYesYesYes
190659YesYesYes--Yes
Monitoring Information:
SectionMonitoring Immediately Before RehabilitationMonitoring Immediately After RehabilitationLong-Term Monitoring
DistressFWDProfileDistressFWDProfileDistressFaultingFWDRuttingProfile
190601YesYesNoYesYesAlmostAlmostNoYes-Almost
190602YesYesYesYesYesAlmostAlmostNoYes-Almost
190603YesYesNoYesYesAlmostAlmost-YesYesAlmost
190604YesYesNoYesYesAlmostAlmost-YesYesAlmost
190605YesYesNoYesYesAlmostAlmostYesYes-Almost
190606YesYesNoYesNoAlmostAlmost-YesYesAlmost
190607YesYesNoYesYesAlmostAlmost-YesYesAlmost
190608YesYesNoYesYesAlmostAlmost-YesYesAlmost
190659NoNoNoNoYesAlmostAlmost-YesYesAlmost
Yes= Design criteria met.No= Design criteria not met.
Almost= Close to meeting design criteria.Dash (-)= Data do not apply to this cell.

MICHIGAN

All levels of data were used to complete the summaries presented in tables 65 and 66. The information presented in table 65 that is italicized highlights information that does not meet the specifications established for this particular site and/or section. As shown, for Michigan, the original construction date and most of the actual AC overlay thicknesses do not fall within the original design parameters established for the SPS-6 experiment.

Table 66 summarizes the site and monitoring requirements that were and were not met based on the IMS data requests for this project. As shown in this table, currently the climate, traffic, and most of the as-constructed design data, with the exception of the AC thickness, meet the design requirements for the SPS-6 experiment. In addition, most of the monitoring requirements for immediately before rehabilitation were met, while the monitoring requirements for immediately after rehabilitation were not met. On average, the long-term monitoring requirements were met.

Note that the full-depth repairs consisted of AC material rather than the PCC used at all other sites. This may have a significant impact on the performance of the rehabilitated pavement.

Table 65. Michigan SPS-6 site summary.

General Site Information:
PCC type: JRCPClimatic zone: Wet, FreezeTraffic availability: 8 years
Initial pavement condition: FairClimatic availability: 39 years 
Site Information:
 Restoration TechniquePavement StructureDate
IDDesignComp- lianceAC Overlay Thick. mmPCCBaseSubgrade TypeOrig. Constr.Rehab.De- assigned
DesignActualThick. mmTypeThick. mm
0601RoutineA--229201,30213211136/1/19585/30/1990 
0602MinimumO,(1)--229201,30213211136/1/19585/30/1990 
0603MinimumO,(1)102103229201,30210161136/1/19585/30/1990 
0604Minimum*A,O,(1)102137234201,30210161136/1/19585/30/1990 
0605MaximumM,O,(2)--229201,30213211136/1/19585/30/1990 
0606MaximumA,O,(1)102127241201,30210161136/1/19585/30/1990 
0607Crack & SeatM102117229202,30217781046/1/19585/30/1990 
0608Crack & SeatM203173236202,30213211046/1/19585/30/1990 
0659Rubblized-Variable102241202,3028641046/1/19585/30/1990 
Monitoring Information:
 Number of Monitoring Data Collection DatesProfileTraffic
  Distress  Initial AC IRI, m/kmAverage ESALs
IDIRIFWDManualPASCOFaultingFrictionRutting
060111533332-345,230
060211532432-345,230
0603126520371.29345,230
0604126530381.15345,230
06054433332-345,230
0606116430360.90345,230
0607116430371.07345,230
0608116430370.87345,230
0659115420261.14345,230

General Notes:
N/A: Data are not in the IMS database yet.
Dash (-): Does not apply to this cell.
Italicized letters and numbers represent section information that was not acquired within the experiment specifications.

Abbreviations:
Thick. mm
= Thickness in mm;
Orig. Constr.= Date of original construction;
Rehab.= Rehabilitation.

Additional Notes:
*AC overlay has been sawed and sealed.
A= All requirements satisfied, M= Most requirements satisfied, O= Optional treatments applied, and D= "Do not perform" treatments applied.
(1)= Partial- and full-depth repairs are AC.
(2)= Partial-depth AC repairs and PCC full-depth repairs.
104= Fine-grained soils: Clay with gravel.
131= Fine-grained soils: Silty clay.

1 mm= .039 inch

Table 66. Design and monitoring requirements for Michigan SPS-6 site.

Site Information:
SectionClimateTrafficAs Constructed
MoistureTemperatureComplianceAC Thick.PCC Thick.
260601YesYesYesYes-Yes
260602YesYesYesYes-Yes
260603YesYesYesYesNoYes
260604YesYesYesYesNoYes
260605YesYesYesYes-Yes
260606YesYesYesYesNoYes
260607YesYesYesYesNoYes
260608YesYesYesYesNoYes
260659YesYesYes--Yes
Monitoring Information:
SectionMonitoring Immediately Before RehabilitationMonitoring Immediately After RehabilitationLong-Term Monitoring
DistressFWDProfileDistressFWDProfileDistressFaultingFWDRuttingProfile
260601YesYesYesNoNoAlmostYesYesAlmost-Yes
260602NoYesYesNoNoAlmostYesYesAlmost-Yes
260603NoYesYesNoNoAlmostAlmost-AlmostYesYes
260604YesYesYesNoNoAlmostAlmost-AlmostYesYes
260605YesYesYesNoNoNoYesYesAlmost-Almost
260606YesYesYesNoNoAlmostAlmost-AlmostYesYes
260607YesYesYesNoNoAlmostAlmost-AlmostYesYes
260608YesYesYesNoNoAlmostAlmost-AlmostYesYes
260659NoYesYesNoNoAlmostAlmost-NoYesYes
Yes= Design criteria met.No= Design criteria not met.
Almost= Close to meeting design criteria.Dash (-)= Data do not apply to this cell.

MISSOURI

All levels of data were used to complete the summaries presented in tables 67 and 68. The information presented in table 67 that is italicized highlights information that does not meet the specifications established for this particular site and/or section. As shown, for Missouri, only a few design and traffic data do not meet the original design parameters established for the SPS-6 experiment.

Table 68 summarizes the site and monitoring requirements that were and were not met based on the IMS data requests for this project. As shown in this table, currently all of the climate, traffic, and as-constructed design data, with the exception of AC overlay thickness, meet the SPS-6 design parameters. In addition, most of the monitoring requirements for immediately before and after rehabilitation were met. On average, the long-term monitoring requirements were met.

Table 67. Missouri SPS-6 site summary.

General Site Information:
PCC type: JRCPClimatic zone: Wet, FreezeTraffic availability: 1 year
Initial pavement condition: PoorClimatic availability: 17 years 
Site Information:
 Restoration TechniquePavement StructureDate
IDDesignComplianceAC Overlay Thick. mmPCCBaseSubgrade TypeOrig. Constr.Rehab.Deassigned
DesignActualThick. mmTypeThick. mm
0601RoutineA--23130310711310/1/19758/21/1992 
0602MinimumO--2343038611310/1/19758/21/1992 
0603MinimumA1029723130312211310/1/19758/10/1992 
0604Minimum*A,O1029723130311411310/1/19758/10/1992 
0605MaximumA,O--2313039711310/1/19758/21/1992 
0606MaximumA,O102912263038911310/1/19758/10/1992 
0607Crack & SeatA10210923630310711310/1/19758/8/1992 9/2/1995
0608Crack & SeatA203201239303135111310/1/19758/8/1992 
0659Crack & Seat-Variable10923630315211310/1/19758/8/1992 9/2/1995
0660Crack & Seat-Variable19824630310711310/1/19758/8/1992 
0661Rubblized-Variable29023930310711310/1/19758/10/1992 
0662Rubblized-Variable18523930314011310/1/19756/8/1992 
0663Rubblized-Variable27224130311411310/1/19758/8/1992 
0664Rubblized-Variable17524630313011310/1/19757/9/1992 
0665State-Variable11722930311711310/1/19758/10/1992 
0666Minimum---23130311711310/1/19756/9/1992 
Monitoring Information:
 Number of Monitoring Data Collection DatesProfileTraffic
  Distress  Initial AC IRI, m/kmAverage ESALs
IDIRIFWDManualPASCOFaultingFrictionRutting
06017753422-498,612
06025762532-498,612
060367622361.09498,612
060466632361.08498,612
06055863532-498,612
060676632361.10497,870
060756532361.31498,612
0608710632361.28499,354
065958422361.26498,612
066074622361.18500,096
0661