| FHWA > Engineering > Pavements > Research > LTPP > Analysis > Expanded Strategic Plan |
Strategic Outcome 1B: Guidelines for applying traffic loading and classification data in pavement design.The following boxes are specific analysis projects that fall under Strategic Outcome 1B. To see the detailed analysis project statement, click on the corresponding box.
1) Problem Statements are assigned a 3 character number using the convention ‘ O_A_n’. ‘O’ is the associated Strategic Objective number (1 through 7); ‘A’ is the associated Analysis Outcome letter (A, B, C etc.) and ‘n’ is an arbitrarily assigned number used for identification purposes. The number ‘n’ does not imply a sequence in which Problem Statements should be addressed. |
More Information
EventsContactCustomer Service |
|||||||||||||||||
|
This page last modified on 11/08/07 |
||||||||||||||||||