| FHWA > Engineering > Pavements > Research > LTPP > Analysis > Expanded Strategic Plan |
Strategic Outcome 1C: Procedures for forecasting and back-casting traffic loading data.The following boxes are specific analysis projects that fall under Strategic Outcome 1C. To see the detailed analysis project statement, click on the corresponding box.
1) Problem Statements are assigned a 3 character number using the convention ‘ O_A_n’. ‘O’ is the associated Strategic Objective number (1 through 7); ‘A’ is the associated Analysis Outcome letter (A, B, C etc.) and ‘n’ is an arbitrarily assigned number used for identification purposes. The number ‘n’ does not imply a sequence in which Problem Statements should be addressed. |
More Information
EventsContactCustomer Service |
|||||||||||||||||
|
This page last modified on 11/08/07 |
||||||||||||||||||