Strategic Outcome 2B: Relationships to enable interchangeable use of laboratory and field-derived material parameters.

The following boxes are specific analysis projects that fall under Strategic Outcome 2B.

Solid Orange Box: FHWA | Funding: $231,930 | Temperature Predictions and Adjustment Factors for Asphalt Pavements. | Project Completed. |  | Project Completed: Oct. 1, 1994 | Report: FHWA-RD-98-085 June 1, 1999 | Responsible Agency: Braun | Principal Investigator/FHWA Staff: Lukanen/Richter |

Solid Orange Box: FHWA | Funding: $270,000 | Analyses Relating to Pavement Material Characterization and Their Effects on Pavement Performance. | Project Completed: April 1, 1995 | Report: FHWA-RD-97-076: Sept. 1, 1997 | Responsible Agency: Fugro-BRE | Principal Investigator/FHWA Staff: Von Quintus/Richter |

Solid Orange Box: FHWA | Funding = $125,000 | Backcalculation of Layer Parameters for LTPP Test Sections, Volume I. | Project completed: Aug. 7, 1997 | Report: FHWA-RD-00-086: July 31, 1998 | Responsible Agency: Fugro-BRE | Principal Investigator/FHWA Staff: Khazanovich/Richter FHWA-RD-00-086

Solid Orange Box: FHWA | Funding = $171,000 | Backcalculation of Layer Parameters for LTPP Test Sections, Volume II. | Project completed. |  Project Completed: May 1, 1997 | Report: FHWA-RD-01-113  Aug.31, 2001 | Responsible Agency: Fugro-BRE | Principal Investigator/FHWA Staff: Von Quintus/Richter | An on-going FHWA project that was funded using LTPP budgeted funds.

Solid Orange Box: FHWA | Funding: $228,675 | Review of LTPP Back calculation Results. | Project Completed: Jan. 23, 2003 | FHWA-RD-05-150 Aug 31, 2005 | Responsible Agency: ERES  | Principal Investigator/FHWA Staff: Stubstad/Wiser

Hashed Orange Box: 2B1 | FHWA | Funding: $200,000 | Relationships between Laboratory-Measured and Field-Derived Properties of Pavement Layers. | Start date: Planned 2003 | Responsible Agency: TBD | Principal Investigator/FHWA Staff: TBD/Wiser | A planned FHWA project that will be funded using LTPP budgeted funds.


LEGEND

NCHRP project number | $ Funds | NCHRP Project Title | Effective Date | Completion Date | Responsible Agency | Principal Investigator/NCHRP Staff

Dashed light blue boxes are on-going NCHRP projects that were initiated by the LTPP ETG. Solid light blue boxes are completed projects.

NCHRP project number | $ Funds | NCHRP Project Title | Effective Date | Completion Date | Responsible Agency | Principal Investigator/NCHRP Staff

Dashed pink boxes are on-going NCHRP projects that were initiated by other agencies or work groups, but are directly associated with LTPP Data Analysis Plan Strategic Objectives and Analysis Outcomes. Solid pink boxes are completed projects.

Problem Statement Number, O_A_n, Proposed problem title
Project Duration, Anticipated Funds

Dashed white boxes are proposed Research Problem Statements that were developed at LTPP Workshops. See Note 1) for an explanation of the Problem Statement Numbering scheme.

FHWA Technical Support Contractor | O_A_n | Project Title | Planned Start Date | Responsible Agency | Principal Investigator/FHWA Staff

Hashed orange boxes are planned FHWA projects that will be funded using LTPP budgeted funds.

FHWA Technical Support Contractor, $ Funds, Project Title, Start Date, Completion Date, Responsible Agency, Principal Investigator/FHWA Staff

Dashed orange boxes are on-going FHWA projects that were funded using LTPP budgeted funds.

sample of box with thin solid border

Thin solid boxes are completed projects with reports pending.

sample of box with thick solid border

Thick solid boxes are completed projects with reports published.
Note:

1) Problem Statements are assigned a 3 character number using the convention ‘ O_A_n’.  ‘O’ is the associated Strategic Objective number (1 through 7); ‘A’ is the associated Analysis Outcome letter (A, B, C etc.) and ‘n’ is an arbitrarily assigned number used for identification purposes.  The number ‘n’ does not imply a sequence in which Problem Statements should be addressed.

 
This page last modified on 11/08/07
 

FHWA
United States Department of Transportation - Federal Highway Administration
Abstract Key Findings Product FHWA-RD-98-085 Product Key Findings Abstract FHWA-RD-97-076 FHWA-RD-01-113