Strategic Outcome 3A: Impact of temperature and moisture variations (independent of frost penetration) on pavement performance.

The following boxes are specific analysis projects that fall under Strategic Outcome 3A.

Dashed Pink Box: NCHRP 9-23 | Funding = $487,234 | Environmental Effects in Pavement Mix and Structural Design Systems. | Effective Date: Feb. 27, 2001 | Completion Date: Dec. 31, 2007 | Responsible Agency: Arizona State U. | Principal Investigator/NCHRP Staff: Houston/Harrigan

Solid Light Blue Box: NCHRP 20-50(7/12) | Funding = $349,969 | Daily and Seasonal Variations in In-Situ Material Properties. | Project completed: Feb. 7, 2000 | Web document 60  Aug. 31, 2003 | Responsible Agency: U. of Tennessee | Principal Investigator/NCHRP Staff: Drumm/Hanna

Solid Orange Box: FHWA | Funding = $94,000 | Study of LTPP Pavement Temperatures. | Project completed. Aug. 1997 | FHWA-RD-02-071 Nov. 1999 | Responsible Agency: Braun/Consulpav | Principal Investigator/FHWA Staff: Lukanen/Symons | An on-going FHWA project that was funded using LTPP budgeted funds. |

Solid Orange Box: FHWA | Funding = $103,056 | Analysis of Time Domain Reflectometry Data. | Project completed Aug. 1997. | Report: FHWA-RD-99-115 : July 1998 | Responsible Agency: ERES | Principal Investigator/FHWA Staff: Jiang/Richter

Solid Orange Box: FHWA | Seasonal Variations in Unbound Pavement Materials. | Project Completed May 1, 1997 | FHWA-HRT-04-079: Mar. 31, 2000 | Responsible Agency: FHWA Staff | Principal Investigator/FHWA Staff: Richter

Hashed Orange Box: FHWA | Funding = $100,000 | Evaluation of LTPP Site Specific Climatic Data. | Data Study | Responsible Agency: TBD | Principal Investigator/FHWA Staff: TBD/Wiser

Dashed White Box: Problem Statement Number 3A1 | Assessment of the effects of loading and environment on pavement life using SPS data. | After NCHRP 1-40 | Project Duration: 24 months | Anticipated project funds = $500,000


LEGEND

NCHRP project number | $ Funds | NCHRP Project Title | Effective Date | Completion Date | Responsible Agency | Principal Investigator/NCHRP Staff

Dashed light blue boxes are on-going NCHRP projects that were initiated by the LTPP ETG. Solid light blue boxes are completed projects.

NCHRP project number | $ Funds | NCHRP Project Title | Effective Date | Completion Date | Responsible Agency | Principal Investigator/NCHRP Staff

Dashed pink boxes are on-going NCHRP projects that were initiated by other agencies or work groups, but are directly associated with LTPP Data Analysis Plan Strategic Objectives and Analysis Outcomes. Solid pink boxes are completed projects.

Problem Statement Number, O_A_n, Proposed problem title
Project Duration, Anticipated Funds

Dashed white boxes are proposed Research Problem Statements that were developed at LTPP Workshops. See Note 1) for an explanation of the Problem Statement Numbering scheme.

FHWA Technical Support Contractor | O_A_n | Project Title | Planned Start Date | Responsible Agency | Principal Investigator/FHWA Staff

Hashed orange boxes are planned FHWA projects that will be funded using LTPP budgeted funds.

FHWA Technical Support Contractor, $ Funds, Project Title, Start Date, Completion Date, Responsible Agency, Principal Investigator/FHWA Staff

Dashed orange boxes are on-going FHWA projects that were funded using LTPP budgeted funds.

sample of box with thin solid border

Thin solid boxes are completed projects with reports pending.

sample of box with thick solid border

Thick solid boxes are completed projects with reports published.
Note:

1) Problem Statements are assigned a 3 character number using the convention ‘ O_A_n’.  ‘O’ is the associated Strategic Objective number (1 through 7); ‘A’ is the associated Analysis Outcome letter (A, B, C etc.) and ‘n’ is an arbitrarily assigned number used for identification purposes.  The number ‘n’ does not imply a sequence in which Problem Statements should be addressed.

 