| FHWA > Engineering > Pavements > Research > LTPP > Analysis > Expanded Strategic Plan |
Strategic Outcome 4B: Improve measures of pavement structural condition for use in network-level pavement management.The following boxes are specific analysis projects that fall under Strategic Outcome 4B.
1) Problem Statements are assigned a 3 character number using the convention ‘ O_A_n’. ‘O’ is the associated Strategic Objective number (1 through 7); ‘A’ is the associated Analysis Outcome letter (A, B, C etc.) and ‘n’ is an arbitrarily assigned number used for identification purposes. The number ‘n’ does not imply a sequence in which Problem Statements should be addressed. |
More Information
EventsContactCustomer Service |
|||||||||||||||||
|
This page last modified on 11/08/07 |
||||||||||||||||||