| FHWA > Engineering > Pavements > Research > LTPP > Analysis > Expanded Strategic Plan |
Strategic Outcome 6B: Guidelines for timing and selection of pavement maintenance and rehabilitation options, and expected performance impacts of each.The following boxes are specific analysis projects that fall under Strategic Outcome 6B.
1) Problem Statements are assigned a 3 character number using the convention ‘ O_A_n’. ‘O’ is the associated Strategic Objective number (1 through 7); ‘A’ is the associated Analysis Outcome letter (A, B, C etc.) and ‘n’ is an arbitrarily assigned number used for identification purposes. The number ‘n’ does not imply a sequence in which Problem Statements should be addressed. |
More Information
EventsContactCustomer Service |
|||||||||||||||||
|
This page last modified on 12/06/07 |
||||||||||||||||||