Pavements

Strategic Outcome 7A: Impact of design features on measured pavement responses (deflections, load-transfer, strains, etc.)

The following boxes are specific analysis projects that fall under Strategic Outcome 7A.

Solid Light Blue Box: NCHRP 20-50(2) | Funding = $74,963 | Relative Performance of Jointed Plain Concrete Pavements with Sealed and Unsealed Joints. | Project completed. July 29, 1999 | Web document 32  Jan. 31, 2001 | Responsible Agency: Kathleen Hall | Principal Investigiator/NCHRP Staff: Hall/Hanna

Solid Orange Box: FHWA | Funding = $360,000 | Review of SPS-1, -2, -5, and -6 Experiments. | Projects completed. July 12, 1999| FHWA-RD-01-166 to 169- Dec. 31, 2000 | Responsible Agency: ERES/Fugro-BRE | Principal Investigator/FHWA Staff: Darter and Von Quintus/ Richter

Solid Orange Box: FHWA FUNDING = $191,000. Evaluation and Analysis of LTPP Pavement Layer Thickness Data. Project completed. Sept. 1, 1999. FHWA-RD-03-041. Dec. 31, 2000. Responsible Agency: ERES Principal Investigator/FHWA Staff: Jiang/Richter FHWA-RD-03-041

Solid Orange Box: FHWA | $75,000 | Study of Environmental Effects in the Absence of Heavy Loads-SPS-8 , Initial Evaluation and Analysis. Project completed | Mar. 2001 | FHWA-RD-02-087 | Jan. 2002 | ERES | Mladenovic/Richter

Solid Orange Box: FHWA	| $75,000 | Evaluation of Joint and Crack Load Transfer. | Project completed  | Mar. 2001 | FHWA-RD-02-088  | Jan. 2002 | ERES	| Khazanovich/Richter

Solid Pink Box: NCHRP 20-50(10/16)| $299,301 | Influence of Design and Construction Features on the Response and Performance of New Flexible and Rigid Pavements. | June 27, 2002 | Web document 74 | Mar. 22,  2005 | Michigan State U. | Chatti/Hanna

Hashed Orange Box: FHWA | 7A1 | Impact of Design Features on Pavement Response and Performance in Rehabilitated Flexible and Rigid Pavements. | TBD	| Data Study


LEGEND

NCHRP project number | $ Funds | NCHRP Project Title | Effective Date | Completion Date | Responsible Agency | Principal Investigator/NCHRP Staff

Dashed light blue boxes are on-going NCHRP projects that were initiated by the LTPP ETG. Solid light blue boxes are completed projects.

NCHRP project number | $ Funds | NCHRP Project Title | Effective Date | Completion Date | Responsible Agency | Principal Investigator/NCHRP Staff

Dashed pink boxes are on-going NCHRP projects that were initiated by other agencies or work groups, but are directly associated with LTPP Data Analysis Plan Strategic Objectives and Analysis Outcomes. Solid pink boxes are completed projects.

Problem Statement Number, O_A_n, Proposed problem title
Project Duration, Anticipated Funds

Dashed white boxes are proposed Research Problem Statements that were developed at LTPP Workshops. See Note 1) for an explanation of the Problem Statement Numbering scheme.

FHWA Technical Support Contractor | O_A_n | Project Title | Planned Start Date | Responsible Agency | Principal Investigator/FHWA Staff

Hashed orange boxes are planned FHWA projects that will be funded using LTPP budgeted funds.

FHWA Technical Support Contractor, $ Funds, Project Title, Start Date, Completion Date, Responsible Agency, Principal Investigator/FHWA Staff

Dashed orange boxes are on-going FHWA projects that were funded using LTPP budgeted funds.

sample of box with thin solid border

Thin solid boxes are completed projects with reports pending.

sample of box with thick solid border

Thick solid boxes are completed projects with reports published.
Note:

1) Problem Statements are assigned a 3 character number using the convention ‘ O_A_n’.  ‘O’ is the associated Strategic Objective number (1 through 7); ‘A’ is the associated Analysis Outcome letter (A, B, C etc.) and ‘n’ is an arbitrarily assigned number used for identification purposes.  The number ‘n’ does not imply a sequence in which Problem Statements should be addressed.

 
This page last modified on 12/06/07
 

FHWA
United States Department of Transportation - Federal Highway Administration
publication Link to FHWA-RD-02-088