Office of Planning, Environment, & Realty (HEP)
Planning · Environment · Real Estate
The Fiscal Year 2001 National Corridor Planning and Development Program and Coordinated Border Infrastructure Program grant recipients are the following:
*-- indicates congressional earmarks
| STATE | PROJECT | AWARD |
| Alabama | *US 43, Alabama | $3,516,000 |
| Alabama | *Anniston Evacuation corridor, Calhoun County, Alabama | $2,637,000 |
| Alaska | *Hatcher Pass (phase 1), Alaska | $1,758,000 |
| Arizona | Infrastructure improvements to property purchased for Commercial Vehicle Inspections at the Nogales POE. | $750,000 |
| Arizona | ITS-CVO processing for international crossing system in Nogales POE. | $800,000 |
| Arkansas ( w/ IN, KY, LA, MS, TN, TX) | Environmental and Location studies for future I-69 from Sarnia and Windsor, Ontario Canada to Laredo and the Lower Rio Grande Valley (US/Mexico Border) |
$5,000,000 |
| California | Project development, ROW acquisition and construction of grade separation projects in the Alameda Corridor East from E. Los Angeles to Pomona along UP/SP RR line | $2,400,000 |
| California | Preliminary Engineering and design for realignment of I-5 and I-805 from San Ysidro POE to Virginia Ave in San Diego metropolitan area | $2,000,000 |
| California | Environmental study, design, and ROW acquisition along SR 905 Freeway to the Otay Mesa Port of Entry | $4,100,000 |
| California | *Avalon Boulevard/405 Freeway Interchange, Carson, California | $769,125 |
| Colorado | *I-25 Corridor from Alameda to Logan, Colorado | $3,516,000 |
| Connecticut | Final design phase for replacement of the I-95 Pearl Harbor Memorial Bridge in New Haven | $1,500,000 |
| Florida | *Traffic calming, Boca Raton, Florida | $439,500 |
| Florida | *US 19, Florida | $8,790,000 |
| GSA | At Sault St. Marie, MI POE, construction of a corridor for the separation of commercial and non-commercial traffic at the approach | $1,990,000 |
| GSA | At Columbia, Laredo TX POE construction of a 3rd lane for truck processing. Lane will separate full and empty trucks prior to inspection | $308,000 |
| GSA | At bridge of the Americas, EL Paso, TX POE, construct new headhouse and 4 additional primary inspection lanes and booths. | $1,500,000 |
| GSA | At Pharr, TX POE construction of 25 inspection bays with canopy. | $1,500,000 |
| Idaho | *US 95 (Milepost 522 to Canadian border), Idaho | $1,670,100 |
| Illinois | *New Boston Road improvements, Mercer County, Illinois | $2,637,000 |
| Illinois | *I-74 bridge, Moline, Illinois | $4,922,400 |
| Illinois | *US 51 widening, Decatur, Illinois | $1,186,650 |
| Illinois | *Stevenson expressway, Illinois | $3,340,200 |
| Illinois | PE for Central Ave. to Narragansett Ave. connector, a new 4-lane highway near Midway Airport and the CSX Bedford Park intermodal yards in Cook county | $3,000,000 |
| Indiana | *South Shore industrial safety overpass, Indiana | $4,175,250 |
| Indiana | *I-65 Upgrade, Clark County, Indiana | $1,186,650 |
| Kentucky | *Madison County, KY 21 and I-75, Kentucky | $879,000 |
| Kentucky | *I-66, Somerset to London, Kentucky | $4,395,000 |
| Kentucky | *US 25 improvements, Kentucky | $1,758,000 |
| Louisiana | *I-69, Louisiana | $2,021,700 |
| Massachusetts | *Downtown Fitchburg Route 12 extension, Massachusetts | $1,758,000 |
| Michigan | Detroit - Windsor International Bridge Study: Feasibility Study & Environmental Clearance | $3,000,000 |
| Missouri | *US 61 (Avenue of the Saints), Missouri | $3,516,000 |
| New Hampshire (w/ ME & VT) | *US Route 2, New Hampshire | $1,318,500 |
| New York | Design and ROW acquisition for new freeway (future I-99) from PA border north for 12 miles. | $3,000,000 |
| New York | Installation of canopy, inspection booths, signal and WIM at Ogdensburg-Prescott Intl Crossing | $300,000 |
| North Carolina | * US 321 and US 74, Gasden and Mecklenburg County, North Carolina | $439,500 |
| Ohio | *City of North Ridgeville, Lorain County, Ohio, grade crossing | $527,400 |
| Oregon | *I-5 South Medford interchange and Delta Park, Oregon | $879,000 |
| South Dakota | *I-29 Port of Entry, Union County, South Dakota | $1,758,000 |
| South Dakota | Construction of Phase I of the Southeast Connector route in Rapid City, SD including a new interchange at Elk Vale Rd and SD-44 and four-lane reconstruction of Elk Vale Rd from South of SD-44 north to near I-90 | $3,000,000 |
| Texas | Acquire ROW for Border safety inspection facilities and related work (Laredo, Eagle Pass, El Paso, Brownsville, Pharr-Reynosa, Los Indios-Lucia Blanco) | $1,400,000 |
| Texas | *Radio Road overpass, City of Sulpher Springs, Texas | $1,186,650 |
| Texas | *I-69 corridor, Texas | $2,637,000 |
| Texas | Reconstruction of Mile 2 W in Hidalgo County | $1,200,000 |
| Texas | Improvement Plan and related work for six POEs in El Paso area (including part of New Mexico) |
$450,000 |
| Texas | * I-35 corridor expansion, Waco, Texas | $1,164,675 |
| Utah | Corridor planning for I-15 in Utah County | $400,000 |
| Virginia | *Coalfields expressway, VA | $3,516,000 |
| Virginia | *Route 104, Virginia | $879,000 |
| Washington State | * US 395 North Spokane corridor, Washington | $879,000 |
| West Virginia | * Coalfields expressway, West Virginia | $8,790,000 |
| Wisconsin | *WI 29 (Chippewa Falls bypass, Wisconsin) | $2,637,000 |
| Wisconsin | ROW acquisition, construction of roadway and structures, widening and realignment of US 10 between Fremont and US 45 including US 10/45 improvements | $4,000,000 |
|
TOTAL AWARDS |
$123,081,300 |