Skip to content U.S. Department of Transportation/Federal Highway AdministrationU.S. Department of Transportation/Federal Highway Administration

Office of Planning, Environment, & Realty (HEP)
Planning · Environment · Real Estate

HEP Events Guidance Publications Glossary Awards Contacts

Coordinated Border Infrastructure Program

Appendix I - FY 2001 Awards

The Fiscal Year 2001 National Corridor Planning and Development Program and Coordinated Border Infrastructure Program Grant Recipients

(*-- indicates congressional earmarks)

State

Project

Award

Alabama

*US 43, Alabama

$3,516,000

Alabama

*Anniston Evacuation corridor, Calhoun County, Alabama

$2,637,000

Alaska

*Hatcher Pass (phase 1), Alaska

$1,758,000

Arizona

Infrastructure improvements to property purchased for Commercial Vehicle Inspections at the Nogales POE.

$750,000

Arizona

ITS-CVO processing for international crossing system in Nogales POE.

$800,000

Arkansas ( w/ IN, KY, LA, MS, TN, TX)

Environmental and Location studies for future I-69 from Sarnia and Windsor, Ontario Canada to Laredo and the Lower Rio Grande Valley (US/Mexico Border)

$5,000,000

California

Project development, ROW acquisition and construction of grade separation projects in the Alameda Corridor East from E. Los Angeles to Pomona along UP/SP RR line

$2,400,000

California

Preliminary Engineering and design for realignment of I-5 and I-805 from San Ysidro POE to Virginia Ave in San Diego metropolitan area

$2,000,000

California

Environmental study, design, and ROW acquisition along SR 905 Freeway to the Otay Mesa Port of Entry

$4,100,000

California

*Avalon Boulevard/405 Freeway Interchange, Carson, California

$769,125

Colorado

*I-25 Corridor from Alameda to Logan, Colorado

$3,516,000

Connecticut

Final design phase for replacement of the I-95 Pearl Harbor Memorial Bridge in New Haven

$1,500,000

Florida

*Traffic calming, Boca Raton, Florida

$439,500

Florida

*US 19, Florida

$8,790,000

GSA

At Sault St. Marie, MI POE, construction of a corridor for the separation of commercial and non-commercial traffic at the approach

$1,990,000

GSA

At Columbia, Laredo TX POE construction of a 3rd lane for truck processing. Lane will separate full and empty trucks prior to inspection

$308,000

GSA

At bridge of the Americas, EL Paso, TX POE, construct new headhouse and 4 additional primary inspection lanes and booths.

$1,500,000

GSA

At Pharr, TX POE construction of 25 inspection bays with canopy.

$1,500,000

Idaho

*US 95 (Milepost 522 to Canadian border), Idaho

$1,670,100

Illinois

*New Boston Road improvements, Mercer County, Illinois

$2,637,000

Illinois

*I-74 bridge, Moline, Illinois

$4,922,400

Illinois

*US 51 widening, Decatur, Illinois

$1,186,650

Illinois

*Stevenson expressway, Illinois

$3,340,200

Illinois

PE for Central Ave. to Narragansett Ave. connector, a new 4-lane highway near Midway Airport and the CSX Bedford Park intermodal yards in Cook county

$3,000,000

Indiana

*South Shore industrial safety overpass, Indiana

$4,175,250

Indiana

*I-65 Upgrade, Clark County, Indiana

$1,186,650

Kentucky

*Madison County, KY 21 and I-75, Kentucky

$879,000

Kentucky

*I-66, Somerset to London, Kentucky

$4,395,000

Kentucky

*US 25 Improvements, Kentucky

$1,758,000

Louisiana

*I-69, Louisiana

$2,021,700

Massachusetts

*Downtown Fitchburg Route 12 extension, Massachusetts

$1,758,000

Michigan

Detroit - Windsor International Bridge Study: Feasibility Study & Environmental Clearance

$3,000,000

Missouri

*US 61 (Avenue of the Saints), Missouri

$3,516,000

New Hampshire (w/ ME & VT)

*US Route 2, New Hampshire

$1,318,500

New York

Design and ROW acquisition for new freeway (future I-99) from PA border north for 12 miles.

$3,000,000

New York

Installation of canopy, inspection booths, signal and WIM at Ogdensburg-Prescott Intl Crossing

$300,000

North Carolina

* US 321 and US 74, Gasden and Mecklenburg County, North Carolina

$439,500

Ohio

*City of North Ridgeville, Lorain County, Ohio, grade crossing

$527,400

Oregon

*I-5 South Medford interchange and Delta Park, Oregon

$879,000

South Dakota

*I-29 Port of Entry, Union County, South Dakota

$1,758,000

South Dakota

Construction of Phase I of the Southeast Connector route in Rapid City, SD including a new interchange at Elk Vale Rd and SD-44 and four-lane reconstruction of Elk Vale Rd from South of SD-44 north to near I-90

$3,000,000

Texas

Acquire ROW for Border safety inspection facilities and related work (Laredo, Eagle Pass, El Paso, Brownsville, Pharr-Reynosa, Los Indios-Lucia Blanco)

$1,400,000

Texas

*Radio Road overpass, City of Sulpher Springs, Texas

$1,186,650

Texas

*I-69 corridor, Texas

$2,637,000

Texas

Reconstruction of Mile 2 W in Hidalgo County

$1,200,000

Texas

Improvement Plan and related work for six POEs in El Paso area (including part of New Mexico)

$450,000

Texas

* I-35 corridor expansion, Waco, Texas

$1,164,675

Utah

Corridor planning for I-15 in Utah County

$400,000

Virginia

*Coalfields expressway, VA

$3,516,000

Virginia

*Route 104, Virginia

$879,000

Washington State

* US 395 North Spokane corridor, Washington

$879,000

West Virginia

* Coalfields expressway, West Virginia

$8,790,000

Wisconsin

*WI 29 (Chippewa Falls bypass, Wisconsin)

$2,637,000

Wisconsin

ROW acquisition, construction of roadway and structures, widening and realignment of US 10 between Fremont and US 45 including US 10/45 improvements

$4,000,000

TOTAL AWARDS

  $123,081,300

Updated: 12/03/2012
HEP Home Planning Environment Real Estate
Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000