The page you requested has moved and you've automatically been taken to its new location.

Please update your link or bookmark after closing this notice.

Continue
Skip to content U.S. Department of Transportation/Federal Highway AdministrationU.S. Department of Transportation/Federal Highway Administration

Office of Planning, Environment, & Realty (HEP)
Planning · Environment · Real Estate

HEP Events Guidance Publications Glossary Awards Contacts

Coordinated Border Infrastructure Program

Appendix I - FY 2001 Awards

The Fiscal Year 2001 National Corridor Planning and Development Program and Coordinated Border Infrastructure Program Grant Recipients

(*-- indicates congressional earmarks)

State

Project

Award

Alabama

*US 43, Alabama

$3,516,000

Alabama

*Anniston Evacuation corridor, Calhoun County, Alabama

$2,637,000

Alaska

*Hatcher Pass (phase 1), Alaska

$1,758,000

Arizona

Infrastructure improvements to property purchased for Commercial Vehicle Inspections at the Nogales POE.

$750,000

Arizona

ITS-CVO processing for international crossing system in Nogales POE.

$800,000

Arkansas ( w/ IN, KY, LA, MS, TN, TX)

Environmental and Location studies for future I-69 from Sarnia and Windsor, Ontario Canada to Laredo and the Lower Rio Grande Valley (US/Mexico Border)

$5,000,000

California

Project development, ROW acquisition and construction of grade separation projects in the Alameda Corridor East from E. Los Angeles to Pomona along UP/SP RR line

$2,400,000

California

Preliminary Engineering and design for realignment of I-5 and I-805 from San Ysidro POE to Virginia Ave in San Diego metropolitan area

$2,000,000

California

Environmental study, design, and ROW acquisition along SR 905 Freeway to the Otay Mesa Port of Entry

$4,100,000

California

*Avalon Boulevard/405 Freeway Interchange, Carson, California

$769,125

Colorado

*I-25 Corridor from Alameda to Logan, Colorado

$3,516,000

Connecticut

Final design phase for replacement of the I-95 Pearl Harbor Memorial Bridge in New Haven

$1,500,000

Florida

*Traffic calming, Boca Raton, Florida

$439,500

Florida

*US 19, Florida

$8,790,000

GSA

At Sault St. Marie, MI POE, construction of a corridor for the separation of commercial and non-commercial traffic at the approach

$1,990,000

GSA

At Columbia, Laredo TX POE construction of a 3rd lane for truck processing. Lane will separate full and empty trucks prior to inspection

$308,000

GSA

At bridge of the Americas, EL Paso, TX POE, construct new headhouse and 4 additional primary inspection lanes and booths.

$1,500,000

GSA

At Pharr, TX POE construction of 25 inspection bays with canopy.

$1,500,000

Idaho

*US 95 (Milepost 522 to Canadian border), Idaho

$1,670,100

Illinois

*New Boston Road improvements, Mercer County, Illinois

$2,637,000

Illinois

*I-74 bridge, Moline, Illinois

$4,922,400

Illinois

*US 51 widening, Decatur, Illinois

$1,186,650

Illinois

*Stevenson expressway, Illinois

$3,340,200

Illinois

PE for Central Ave. to Narragansett Ave. connector, a new 4-lane highway near Midway Airport and the CSX Bedford Park intermodal yards in Cook county

$3,000,000

Indiana

*South Shore industrial safety overpass, Indiana

$4,175,250

Indiana

*I-65 Upgrade, Clark County, Indiana

$1,186,650

Kentucky

*Madison County, KY 21 and I-75, Kentucky

$879,000

Kentucky

*I-66, Somerset to London, Kentucky

$4,395,000

Kentucky

*US 25 Improvements, Kentucky

$1,758,000

Louisiana

*I-69, Louisiana

$2,021,700

Massachusetts

*Downtown Fitchburg Route 12 extension, Massachusetts

$1,758,000

Michigan

Detroit - Windsor International Bridge Study: Feasibility Study & Environmental Clearance

$3,000,000

Missouri

*US 61 (Avenue of the Saints), Missouri

$3,516,000

New Hampshire (w/ ME & VT)

*US Route 2, New Hampshire

$1,318,500

New York

Design and ROW acquisition for new freeway (future I-99) from PA border north for 12 miles.

$3,000,000

New York

Installation of canopy, inspection booths, signal and WIM at Ogdensburg-Prescott Intl Crossing

$300,000

North Carolina

* US 321 and US 74, Gasden and Mecklenburg County, North Carolina

$439,500

Ohio

*City of North Ridgeville, Lorain County, Ohio, grade crossing

$527,400

Oregon

*I-5 South Medford interchange and Delta Park, Oregon

$879,000

South Dakota

*I-29 Port of Entry, Union County, South Dakota

$1,758,000

South Dakota

Construction of Phase I of the Southeast Connector route in Rapid City, SD including a new interchange at Elk Vale Rd and SD-44 and four-lane reconstruction of Elk Vale Rd from South of SD-44 north to near I-90

$3,000,000

Texas

Acquire ROW for Border safety inspection facilities and related work (Laredo, Eagle Pass, El Paso, Brownsville, Pharr-Reynosa, Los Indios-Lucia Blanco)

$1,400,000

Texas

*Radio Road overpass, City of Sulpher Springs, Texas

$1,186,650

Texas

*I-69 corridor, Texas

$2,637,000

Texas

Reconstruction of Mile 2 W in Hidalgo County

$1,200,000

Texas

Improvement Plan and related work for six POEs in El Paso area (including part of New Mexico)

$450,000

Texas

* I-35 corridor expansion, Waco, Texas

$1,164,675

Utah

Corridor planning for I-15 in Utah County

$400,000

Virginia

*Coalfields expressway, VA

$3,516,000

Virginia

*Route 104, Virginia

$879,000

Washington State

* US 395 North Spokane corridor, Washington

$879,000

West Virginia

* Coalfields expressway, West Virginia

$8,790,000

Wisconsin

*WI 29 (Chippewa Falls bypass, Wisconsin)

$2,637,000

Wisconsin

ROW acquisition, construction of roadway and structures, widening and realignment of US 10 between Fremont and US 45 including US 10/45 improvements

$4,000,000

TOTAL AWARDS

  $123,081,300

Updated: 10/20/2015
HEP Home Planning Environment Real Estate
Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000