Skip to content U.S. Department of Transportation/Federal Highway AdministrationU.S. Department of Transportation/Federal Highway Administration

Office of Planning, Environment, & Realty (HEP)
Planning · Environment · Real Estate

HEP Events Guidance Publications Glossary Awards Contacts

Transportation, Community, and System Preservation Program

Transportation, Community, and System Preservation Program - FY 2009 Grants

2009 Designated Amounts

Alabama
Project Number Fiscal Year Project Description Designated Amount
09AL0012009Highway 55 Hurricane Evacuation Corridor Study, AL$570,000 
09AL0022009Medical Campus Access Road (from Highway 231 to Wolf Creek Road), Pell City, AL$475,000 
Total: (2 Projects)$1,045,000 

Back to Top

Arizona
Project Number Fiscal Year Project Description Designated Amount
09AZ0012009Interstate 10 Improvements Project (from I-8 to Picacho Peak), AZ$95,000 
09AZ0022009Obed Bridge Replacement, Navajo County, AZ$190,000 
09AZ0032009Pinetop-Lakeside Bridge Widening Project, AZ$190,000 
Total: (3 Projects)$475,000 

Back to Top

Arkansas
Project Number Fiscal Year Project Description Designated Amount
09AR0012009Garrison Avenue Streetscaping, AR$950,000 
09AR0022009Highway 64: Vilonia Bypass, AR$237,500 
09AR0032009I-555 Floodway Access Road, AR$2,375,000 
09AR0042009Interstate 430/630: Interchange Modification, AR$2,850,000 
09AR0052009Interstate 69/Great River Bridge: Highway 65, MS Highway 1, AR$2,850,000 
Total: (5 Projects)$9,262,500 

Back to Top

California
Project Number Fiscal Year Project Description Designated Amount
09CA0012009Antonio Parkway Rehabilitation, Rancho Santa Margarita, CA$95,000 
09CA0022009Aten Road and Old County Road 111 Improvements, Imperial County, CA$712,500 
09CA0032009Branham Lane/Monterey Highway Rail Grade Separation, San Jose, CA$475,000 
09CA0042009Central Expressway Auxiliary Lanes, CA$475,000 
09CA0052009City of San Fernando Downtown Revitalization Project, CA$285,000 
09CA0062009Economic Development/Revitalization of the Rosecrans Corridor, CA$190,000 
09CA0072009Encinas Creek/Pacific Coast Highway 101 Bridge Replacement, CA$237,500 
09CA0082009Golden Gate Bridge Moveable Median Barrier, San Francisco, CA$950,000 
09CA0092009Heim Bridge Replacement, Alameda Corridor Transportation Authority, CA$380,000 
09CA0102009Hwy 50/Missouri Flat - Western Placerville Interchange Improvement/Weber Creek Bridge Upgrade, CA$570,000 
09CA0112009International Drive Extension/Folsom South Canal Bridge, CA$237,500 
09CA0122009Lemon Grove Lighting Project, CA$285,000 
09CA0132009Light Rail Corridor Improvements Study, Chula Vista, CA$237,500 
09CA0142009Los Banos Bypass on State Route 152, CA$950,000 
09CA0152009Metro Gold Line Foothill Extension Transit Oriented Development Project, CA$237,500 
09CA0162009Park Street Pedestrian Safety Transportation Improvements, Alameda, CA$475,000 
09CA0172009Shoal Creek Pedestrian Bridge, CA$570,000 
09CA0182009Sidewalk Construction in Ashland and Cherryland, CA$475,000 
09CA0192009SR 23/US 101 Freeway Interchange Project, CA$427,500 
09CA0202009SR-47 Port Access Expressway, CA$237,500 
09CA0212009SR89 Mousehole Improvement Project, Truckee, CA$380,000 
09CA0222009State Route 180 East, CA$1,330,000 
09CA0232009State Route 71 expansion from SR-60 to I-10, Pomona, CA$475,000 
09CA0242009State Routes 52 and 67 Interchange Improvements, CA$380,000 
09CA0252009Sun Valley Lighting Project, CA$285,000 
09CA0262009Traffic Signal Modernization, City of Lakewood, CA$475,000 
09CA0272009Veterans Boulevard Project, Fresno County, CA$570,000 
09CA0282009West Vista Way Widening (from Melrose Drive to the east of Thunder Drive), Vista, CA$570,000 
09CA0292009I-80 Intermodal Corridor Study - Oakland, CA to Utah Stateline, UT$950,000 
09CA0302009Bluff Top Park Improvements, CA$95,000 
Total: (30 Projects)$14,012,500 

Back to Top

Colorado
Project Number Fiscal Year Project Description Designated Amount
09CO0012009Construction of a Grade Separated Interchange at SH 83 and SH 88, Arapahoe County, CO$570,000 
09CO0022009Resurfacing, Repair and Improvements to C-470/Interchange Replacement at US 85, CO$475,000 
Total: (2 Projects)$1,045,000 

Back to Top

Connecticut
Project Number Fiscal Year Project Description Designated Amount
09CT0012009Canal Street/ Wooster Street Widening and Infrastructure Improvements, Shelton, CT$95,000 
09CT0022009Offside Roadway Traffic, Safety and Parking Improvements, Fairfield, CT$95,000 
09CT0032009Route 5 Bridge Reconstruction, CT$712,500 
09CT0042009West Main Street Streetscape Phase II, CT$237,500 
Total: (4 Projects)$1,140,000 

Back to Top

Delaware
Project Number Fiscal Year Project Description Designated Amount
09DE0012009Indian River Inlet Bridge, DE$1,900,000 
Total: (1 Project)$1,900,000 

Back to Top

Florida
Project Number Fiscal Year Project Description Designated Amount
09FL0012009Atlantic Greenway Corridor Network, Miami Beach, FL$570,000 
09FL0022009Belleview Bypass and Baseline Road, Marion County, FL$475,000 
09FL0032009Burnt Store Road Evacuation Route Widening Project Preliminary Design and Environmental Study, FL$380,000 
09FL0042009Design and Construction for the Widening of US 331, Walton County, FL$237,500 
09FL0052009Design, Right-of-way, and Construction for the Widening of the Choctawhatchee Bay Bridge, FL$95,000 
09FL0062009Downtown Transit Circulator Streetscapes, Fort Lauderdale, FL$712,500 
09FL0072009Hillsborough County Hillsborough Avenue Beautification Project, FL$237,500 
09FL0082009Interstate 75/Collier Boulevard/SR 84 Interchange Improvements, FL$570,000 
09FL0092009Little Venice Road Improvement Project: Phase II, Marathon, FL$95,000 
09FL0102009Manatee-Sarasota Counties Intelligent Transportation System (ITS) Project, FL$475,000 
09FL0112009Melbourne Airport Access Road and Interchange, Melbourne, FL$1,003,865 
09FL0122009Roadway Improvements to Fairchild Road and Hare Street, FL$95,000 
09FL0132009Sidewalk and Street Milling, Repair and Resurfacing, Sweetwater, FL$475,000 
09FL0142009Sistrunk Boulevard Revitalization and Enhancement Project, FL$475,000 
09FL0152009SR 426/CR 419 Improvements, Orlando, FL$285,000 
09FL0162009SR 46 Regional Evacuation Route, FL$570,000 
09FL0172009State Road (SR) 80 in Hendry County, FL$475,000 
09FL0182009State Road 87 PD and E Expansion, FL$475,000 
09FL0192009Street Rehabilitation, Hialeah, FL$570,000 
09FL0202009U.S. 17 Widening, FL$1,900,000 
09FL0212009US 17 Bridge Construction in the Hardee City Line/CR 634 Segment, Hardee Cnty, FL$332,500 
09FL0222009US Hwy 19 Storm water Mitigation Project at Southfork near Homosassa, Citrus Cnty, FL$380,000 
Total: (22 Projects)$10,883,865 

Back to Top

Georgia
Project Number Fiscal Year Project Description Designated Amount
09GA0012009Butner Road/Stonewall Tell Intersection, GA$475,000 
09GA0022009Cumberland Parkway/US 41 Expansion, GA$950,000 
09GA0032009Newton County Rails to Trails By-Pass Tunnel, GA$142,500 
09GA0042009Newton County Rails to Trails Right of Way Purchase, GA$622,250 
09GA0052009Newton County Rails to Trails Yellow River Bridges, GA$232,750 
09GA0062009Ocmulgee River Corridor, GA$95,000 
09GA0072009Relocation and Widening of SR 113 (from Old Alabama Rd to SR 61South of Cartersville), GA$190,000 
Total: (7 Projects)$2,707,500 

Back to Top

Idaho
Project Number Fiscal Year Project Description Designated Amount
09ID0012009Construction of US-95 (from Wyoming Ave. to Sagle), ID$332,500 
Total: (1 Project)$332,500 

Back to Top

Illinois
Project Number Fiscal Year Project Description Designated Amount
09IL0012009Busse Woods Trail and IL Route 72 Bicycle Overpass, Elk Grove Village, IL$475,000 
09IL0022009Calhoun County Highway 1 Resurfacing, IL$475,000 
09IL0032009Design, Engineering, Land Acquisition and Planning for the Cross-town Connector Project at US 76, Godfrey, IL$237,500 
09IL0042009Design, Engineering, Land Acquisition and Planning for the Extension of Rt. 162 from Maryville towards Troy, IL 
09IL0042009Design, Engineering, Land Acquisition and Planning for the Extension of Rt. 162 from Maryville towards Troy, IL$95,000 
09IL0052009TREC Trails and Pedestrian Bridges 
09IL0052009General Dacey Trail Phase VI 
09IL0052009Riverfront Trail Phase 2 
09IL005a2009Burnham Greenway Gap$234,000 
09IL005f2009Rock Island Corridor Trail Project, Chicago land$46,800 
09IL0062009Improving the West Bank River Front, IL$475,000 
09IL0072009Intersection Safety Improvements, Olympia Fields, IL$475,000 
09IL0072009Governors Highway & 207th Street/Scott Drive Intersection Improvement$444,600 
09IL0082009Meacham Road Toll-way Access Ramps, Schaumburg, IL$475,000 
09IL0092009Miller Road Widening, McHenry, IL$475,000 
09IL0102009Milwaukee Avenue Revitalization Program, IL$475,000 
09IL0112009Mt. Erie-Golden Gate Rd Resurfacing and Expansion, Wayne County, IL$190,000 
09IL0122009Reconstruction of Roosevelt Road, Village of Broadview, IL$570,000 
09IL0132009Route 120 Corridor, Lake County, IL$950,000 
09IL0142009University of Illinois at Urbana-Champaign Campus Street Extension, IL$570,000 
09IL0152009US Highway 30 Improvements, Whiteside County, IL$475,000 
09IL0162009Widening of Rakow Road, McHenry County, IL$570,000 
Total: (18 Projects)$7,707,900 

Back to Top

Indiana
Project Number Fiscal Year Project Description Designated Amount
09IN00120097th Road Extension, Marshall County, IN$665,000 
09IN0022009B-Line Trail Phase II, IN$950,000 
09IN0032009Campus Perimeter Transit System, Vanderburgh County, IN$522,500 
09IN0042009Downtown Transportation Improvements, City of Indianapolis, IN$475,000 
09IN0052009Interchange Planning and Design at I-65/County Road and 750 North, Johnson County, IN$237,500 
09IN0062009McKinley/Riverside Avenues Safety Improvement Project, Muncie, IN$950,000 
09IN0072009Park Avenue and Markland Avenue Intersection Improvement Project, Kokomo, IN$1,235,000 
09IN0082009Ronald Reagan Parkway (Middle and Southern segments), Boone County, IN$570,000 
09IN0092009University Parkway, Vanderburgh County, IN$760,000 
Total: (9 Projects)$6,365,000 

Back to Top

Iowa
Project Number Fiscal Year Project Description Designated Amount
09IA001200919th Avenue North Extension Project, Clinton, IA$475,000 
09IA002200924thSt/23rd Ave Corridor Improvement, Council Bluffs, IA$237,500 
09IA00320094-Laning of US 20 from the Sac-Calhoun County, Iowa line to Moville, IA$570,000 
09IA0042009Delaware Avenue Bridge, IA$475,000 
09IA0052009Mississippi Drive Corridor, Muscatine, IA$475,000 
09IA0062009U.S. 61 Fort Madison Bypass Interchange at Highway J40, IA$950,000 
09IA0072009US 34 Bridge, Mills County, IA$427,500 
09IA0082009Whiterock Sustainable Trail, Guthrie County, IA$380,000 
Total: (8 Projects)$3,990,000 

Back to Top

Kansas
Project Number Fiscal Year Project Description Designated Amount
09KS0012009County Road Construction and Improvements to US-54, Liberal, KS$1,520,000 
09KS0022009US Highway 69 Corridor Study, KS$950,000 
Total: (2 Projects)$2,470,000 

Back to Top

Kentucky
Project Number Fiscal Year Project Description Designated Amount
09KY0012009Boone County Gunpowder Creek Trail System, KY$427,500 
09KY0022009Locust Creek Bridge Replacement (at Hwy 36 West), Carroll County, KY$95,000 
09KY0032009Western Kentucky University (WKU), University-Community Bikeway Project, KY$950,000 
Total: (3 Projects)$1,472,500 

Back to Top

Louisiana
Project Number Fiscal Year Project Description Designated Amount
09LA0012009Alemedia Road (LA 50) Intersection Improvements, St. Charles Parish, LA$285,000 
09LA0022009Baton Rouge Riverfront Redevelopment Transportation Improvements, LA$950,000 
09LA0032009Clearview Parkway at Earhart Expressway Transportation and Drainage Upgrades, Jefferson Parish, LA$356,250 
09LA0042009I-10 New Orleans East Upgrades, LA$190,000 
09LA0052009I-10 Pecue Lane Interchange, Baton Rouge, LA$475,000 
09LA0062009I-10 Southwest Frontage Road Design and Construction (between LA 433 and US 190B), LA$175,750 
09LA0072009I-12 Interchange at LA 1088, St. Tammany Parish, LA$237,500 
09LA0082009I-12 Interchange at LA-16, Denham Springs, LA$950,000 
09LA0092009I-49 South, LA$1,900,000 
09LA0102009I-69, Shreveport, LA$1,900,000 
09LA0112009LA-1 Goldenmeadow to Port Fourchon, LA$1,021,250 
09LA0122009Red Town Road/U.S. 171 Intersection Realignment, Leesville (Vernon Parish), LA$570,000 
09LA0132009US 190 (US 11 to LA 433) Widening, Slidell, LA$237,500 
Total: (13 Projects)$9,248,250 

Back to Top

Maine
Project Number Fiscal Year Project Description Designated Amount
09ME0012009Advanced Bridge Safety Initiative, ME$475,000 
09ME0022009Bicycle and Pedestrian Trails of Statewide Significance, ME$475,000 
09ME0032009Improvements to US Route 1 for access to York County Community College, ME$475,000 
09ME0042009Park Avenue Multi-Use Trail, ME$760,000 
09ME0052009York County Central Corridor Improvements, ME$475,000 
Total: (5 Projects)$2,660,000 

Back to Top

Maryland
Project Number Fiscal Year Project Description Designated Amount
09MD0012009Construction of a Full-Grade Separated Urban Diamond Interchange at US 15 and Christopher's Crossing/Monocacy Blvd, MD$285,000 
09MD0022009Eastern Boulevard Widening and Grade Separation (from MD Rt. 64 to Antietam Drive), MD$380,000 
09MD0032009Hagerstown Area Northeast By-Pass Project, MD$95,000 
09MD0042009Maryland Scenic Byways, MD$118,750 
09MD0052009Midtown Cultural District Streetscape, Baltimore, MD$475,000 
09MD0062009US 113 Safety and Traffic Improvements, Worcester County, MD$237,500 
Total: (6 Projects)$1,591,250 

Back to Top

Massachusetts
Project Number Fiscal Year Project Description Designated Amount
09MA0012009Children's Wharf Landing Intermodal Improvements, Boston, MA$950,000 
09MA0022009City of Haverhill Downtown Streetscape Improvements, MA$285,000 
09MA0032009Longfellow Bridge Approach Gateway, Cambridge, MA$950,000 
Total: (3 Projects)$2,185,000 

Back to Top

Michigan
Project Number Fiscal Year Project Description Designated Amount
09MI00120094-Laning of Baldwin Road to the I-75 Interchange, Oakland County, MI$237,500 
09MI0022009Access Ramps and Widening of Latson Road, Livingston County, MI$570,000 
09MI0032009Buena Vista Township, Michigan-Town Center Infrastructure and Streetscape, MI$237,500 
09MI0042009Construction of a Bicycle Path Between Lexington and Port Sanilac, Sanilac County, MI$475,000 
09MI0052009Croix Street, City of Negaunee, MI$570,000 
09MI0062009Expansion of Southfield Road, Southfield, MI$522,500 
Total: (6 Projects)$2,612,500 

Back to Top

Minnesota
Project Number Fiscal Year Project Description Designated Amount
09MN001200955th Street Extension, Rochester MN$475,000 
09MN0022009Clay County Hwy 52 Reconstruction, MN$285,000 
09MN0032009Hastings Bridge, MN$1,900,000 
09MN0042009Highway 169/I-494 Interchange Improvements, MN$475,000 
09MN0052009Lowry Avenue Bridge Replacement, Minneapolis, MN$475,000 
09MN0062009Trunk Highway 65 Pedestrian Bridge Replacement at 49th Avenue, Columbia Heights, MN$475,000 
09MN0072009U.S. Highway 59 Safety Improvements, MN$950,000 
Total: (7 Projects)$5,035,000 

Back to Top

Mississippi
Project Number Fiscal Year Project Description Designated Amount
09MS0012009Barnes Crossing Road/Natchez Trace Parkway Bridge, MS$475,000 
09MS0022009Capitol Street Renaissance Project, MS$2,850,000 
09MS0032009Dentville - Jack Road Project, Copiah County, MS$475,000 
09MS0042009East Metropolitan Corridor, Rankin County, MS$237,500 
09MS0052009Hattiesburg 4th Street Improvements, MS$1,900,000 
09MS0062009I-20/59 Interchange, Lauderdale County, MS$570,000 
09MS0072009Town of Sherman Roadway and Traffic Improvements, MS$950,000 
09MS0082009Urban Collector Project, MS$475,000 
09MS0092009Urban Collector Road along I-10 North, MS$1,900,000 
09MS0102009US Hwy 49/82 Mississippi Hwy 7 Connector Road Project, Greenwood, MS$380,000 
Total: (10 Projects)$10,212,500 

Back to Top

Missouri
Project Number Fiscal Year Project Description Designated Amount
09MO0012009Brush Creek at Troost Improvements, MO$475,000 
09MO0022009City of Ashland Main Street Redevelopment Project, MO$475,000 
09MO0032009COLT Railroad Overpass at U.S. 63, Columbia, MO$475,000 
09MO0042009Construction of Lafayette Interchange, MO$950,000 
09MO0052009Extension of MO-740 to the I-70/Lake of the Woods Interchange, Columbia, MO$237,500 
09MO0062009Maintenance of the Washington Bridge (Rt. 47 Bridge) over the Missouri River, Washington, MO$285,000 
09MO0072009Mexico Technology Park, MO$950,000 
09MO0082009Preliminary Design and Environmental Study for US 63 Improvements (Osage, Maries, and Phelps Counties), MO$332,500 
09MO0092009River Des Peres Boulevard Improvements, St. Louis, MO$237,500 
09MO0102009Route 32 Safety Improvements in Cedar County, MO$475,000 
09MO0112009Route 61 Corridor Study and Engineering, Lincoln and St. Charles Counties, MO$190,000 
09MO0122009State Route 13 from Route 24 to County Road 113, Lafayette County, MO$475,000 
09MO0132009Tucker Boulevard Bridge, MO$332,500 
09MO0142009U.S. 61 Bypass, Hannibal, MO$237,500 
09MO0152009Upgrade and Partly Relocate MO Rt 141, St Louis County, MO$237,500 
Total: (15 Projects)$6,365,000 

Back to Top

Montana
Project Number Fiscal Year Project Description Designated Amount
09MT0012009I-93 Kalispell Bypass, MT$2,850,000 
Total: (1 Project)$2,850,000 

Back to Top

Nebraska
Project Number Fiscal Year Project Description Designated Amount
09NE0012009Antelope Valley Transportation Improvements, Lincoln, NE$570,000 
09NE0022009Heartland Expressway Corridor Development and Management Study, NE$475,000 
09NE0032009Interchange and Bypass Construction, Kearney, NE$570,000 
09NE0042009Nebraska Highway 35 (from Norfolk to South Sioux City), NE$380,000 
09NE0052009Replacement of US-159 Bridge at Rulo, NE$1,140,000 
09NE0062009Rulo Bridge Replacement Project, NE$95,000 
Total: (6 Projects)$3,230,000 

Back to Top

Nevada
Project Number Fiscal Year Project Description Designated Amount
09NV0012009Reno Rail Access Corridor Enhancements, Reno, NV$285,000 
09NV0022009I-80 Intermodal Corridor Study - Oakland, CA to Utah Stateline, UT 
Total: (1 Project)$285,000 

Back to Top

New Hampshire
Project Number Fiscal Year Project Description Designated Amount
09NH0012009Little Bay Bridges/Spaulding Turnpike, NH$1,900,000 
09NH0022009New Hampshire Department of Transportation, U.S. Route 4 Red List Bridge Repair, West Lebanon, NH$617,500 
Total: (2 Projects)$2,517,500 

Back to Top

New Jersey
Project Number Fiscal Year Project Description Designated Amount
09NJ0012009Bellmawr Borough/Route 42 Culvert Replacement Project, NJ$285,000 
09NJ0022009College Avenue Bus Shelter Redesign 
09NJ0022009College Avenue Redesign, New Brunswick, NJ$950,000 
09NJ0032009Egg Harbor City Transit Hub, NJ$237,500 
09NJ0042009Extension of the Lawrence-Hopewell Trail, Pennington, NJ$285,000 
09NJ0052009Finnegans Lane, North Brunswick Township, NJ$332,500 
09NJ0062009Hudson River Waterfront Walkway, NJ$475,000 
09NJ0072009I-295/76/42 Direct Connection, NJ$2,850,000 
09NJ0082009Kapkowski Road Transportation Planning Area/North Avenue Corridor, NJ$380,000 
09NJ0092009Signalization Improvements, Elizabeth, NJ$475,000 
Total: (9 Projects)$6,270,000 

Back to Top

New Mexico
Project Number Fiscal Year Project Description Designated Amount
09NM0012009City of Hobbs, East Bypass, NM$95,000 
09NM0022009East Aztec Arterial Route, NM$308,750 
09NM0032009Main Street Improvements and Downtown Revitalization, Las Cruces, NM$522,500 
09NM0042009Northwest Loop Access Road, Sandoval County, NM$617,500 
09NM0052009Pinon Hills Boulevard East and Animas River Bridge, NM$895,375 
09NM0062009Sunport Extension to Broadway Blvd, Albuquerque, NM$95,000 
Total: (6 Projects)$2,534,125 

Back to Top

New York
Project Number Fiscal Year Project Description Designated Amount
09NY0012009BNMC Infrastructure Improvements Program, Buffalo, NY$237,500 
09NY0022009Conversion of Outboard Detour Roadway to a Bikeway, Esplanade, NY$475,000 
09NY0032009Design, Engineering, and Construction of the Glen Cove Connector Road, Glen Cove, NY$570,000 
09NY0042009Downtown Revitalization, Village of Melverne, NY$380,000 
09NY0052009Green County Route 9W/81 Intersection Rehabilitation and Traffic Reduction Project, NY$712,500 
09NY0062009High Line Project, New York, NY$237,500 
09NY0072009I-278 Environmental Shield, NY$475,000 
09NY0082009Main Street Multimodal Access and Revitalization Project, NY$950,000 
09NY0092009Murray Athletic Center at Elmira College Access Road Improvements, Chemung County, NY$570,000 
09NY0102009Nellie Hill Bridge Replacement, Dover, NY$237,500 
09NY0112009Revitalization and Development of the General Business District, Inc. Village of Cedarhurst, NY$142,500 
09NY0122009Route 6 Improvements, Peekskill, NY$665,000 
09NY0132009Safe Routes for Seniors and Kids Programs, NY$712,500 
09NY0142009Traffic Signal Modernization, Utica, NY$475,000 
Total: (14 Projects)$6,840,000 

Back to Top

North Carolina
Project Number Fiscal Year Project Description Designated Amount
09NC0012009Garden Parkway, Gaston County, NC$380,000 
09NC0022009High Point Greenways Project, High Point, NC$95,000 
09NC0032009Universal Street Railroad Overpass Project, NC$950,000 
09NC0042009US 74 Monroe Bypass, Mecklenburg and Union Counties, NC$237,500 
09NC0052009US-401 Widening in Cumberland, Harnett, and Wake Counties, NC$237,500 
09NC0062009Widen SR 1306 and SR 1363 (Mebane Street) from SR 1158 to NC 54, Burlington, NC$427,500 
Total: (6 Projects)$2,327,500 

Back to Top

North Dakota
Project Number Fiscal Year Project Description Designated Amount
09ND0012009Lewis and Clark Legacy Trail, ND$326,563 
Total: (1 Project)$326,563 

Back to Top

Ohio
Project Number Fiscal Year Project Description Designated Amount
09OH001200911th Street Revitalization Project, Canton, OH$380,000 
09OH0022009Central Riverfront Street Grid: Mehring Way Relocation, Cincinnati, OH$475,000 
09OH0032009Chesapeake By-Pass, OH$475,000 
09OH0042009Detroit Avenue Public Right-of-Way Improvements, OH$332,500 
09OH0052009Eastgate Area Improvements, Clermont County, OH$570,000 
09OH0062009Martha Ave/I-76 Connector, Akron, OH$1,187,500 
09OH0072009Massillon Road Bridge Improvement, Summit County, OH$475,000 
09OH0082009Pedestrian/Bicycle Recreation Trail Over the Tuscarwaras River Along the Ohio and Erie Canalway Recreation Trails, Stark Cnty, OH$475,000 
09OH0092009Street Widening, Grandview Heights, OH$237,500 
09OH0102009Upgrade of Alum Creek Drive at I-270 and at Groveport Road, Franklin County, OH$570,000 
09OH0112009Warren, OH Greenway Bike Trail, OH$332,500 
09OH0122009Widening of Route 50 , Ross County, OH$475,000 
09OH0132009Zanesville State Street Bridge Renovation and Repair Project, OH$475,000 
Total: (13 Projects)$6,460,000 

Back to Top

Oklahoma
Project Number Fiscal Year Project Description Designated Amount
09OK0012009Extend Falcon Road from Park Lane to Veterans Drive, Altus, OK$427,500 
09OK0022009Reconstruction and Replacement of the I-244 Bridge over the Arkansas River, Tulsa, OK$380,000 
09OK0032009Reconstruction of the I-44 Bridge Over 163rd Street (Including the Interchange), Tulsa, OK$570,000 
09OK0042009Salt Fork of the Red River Bridge Martha Crossing, OK$1,425,000 
09OK0052009SW 9th Avenue Widening--Main St. to US69/75, Durant, OK$380,000 
09OK0062009Traffic Light - Piedmont Road and Edmond Road, OK$95,000 
Total: (6 Projects)$3,277,500 

Back to Top

Oregon
Project Number Fiscal Year Project Description Designated Amount
09OR001200919th Street Extension -- Redmond to Deschutes Junction (between Redmond and Bend), OR$570,000 
09OR0022009Highway 140 Improvements, Jackson County, OR$95,000 
09OR0032009Highway 217 Improvements, Beaverton, OR$475,000 
09OR0042009I-5 to Hwy. 99W Connector, OR$1,852,500 
09OR0052009Newberg-Dundee Transportation Improvement Project, Yamhill County, OR$237,500 
Total: (5 Projects)$3,230,000 

Back to Top

Pennsylvania
Project Number Fiscal Year Project Description Designated Amount
09PA0012009Avenue of the Arts Revitalization and Streetscaping Project, PA$475,000 
09PA0022009Bethlehem Pike Roadway and Streetscape Improvements, Springfield Township, PA$475,000 
09PA0032009Bridge over Brandywine Creek, PA$712,500 
09PA0042009Construction of Bridge Over Valley Creek for Loop Trail at Valley Forge Park, King of Prussia, PA$142,500 
09PA0052009Grove Road Bridge Replacement, Castle Shannon, PA$570,000 
09PA0062009Main Street Streetscape Improvements Project, Boyertown, PA$475,000 
09PA0072009Old Allentown Streetscape Improvements, PA$475,000 
09PA0082009PA 924 and Interstate 81 Interchange Improvements, PA$950,000 
09PA0092009Parking and Street Enhancements at Historic Yellow Springs, Chester Springs, PA$142,500 
09PA0102009Pedestrian and School Children Safety Project, PA$190,000 
09PA0112009Pennsylvania High-Speed Maglev Development Program, PA$950,000 
09PA0122009Perry Square Streetscaping, Erie, PA$380,000 
09PA0132009Prophecy Creek Park Entrance Project, PA$237,500 
09PA0142009Route 8, Duncan Avenue to Wildwood Road, PA$950,000 
09PA0152009Thorn Run Road Interchange Upgrade, Moon Township, PA$95,000 
09PA0162009US 422 River Crossing Complex Project, King of Prussia, PA$237,500 
09PA0172009Veteran's Memorial Bridge, Fallston Bridge, PA$475,000 
Total: (17 Projects)$7,932,500 

Back to Top

Puerto Rico
Project Number Fiscal Year Project Description Designated Amount
09PR0012009Barranquitas South Bypass (from PR 156 to PR719), Municipality of Barranquitas, PR$95,000 
09PR0022009Cidra - Cayey Connector, Municipality of Cidra, PR$380,000 
Total: (2 Projects)$475,000 

Back to Top

South Carolina
Project Number Fiscal Year Project Description Designated Amount
09SC0012009Environmental Impact Statement for Southern Evacuation Lifeline (SELL)/US 701 Project, Georgetown and Horry Counties, SC$237,500 
09SC0022009I-95/U.S. Highway 301 Interchange Project, Orangeburg County, SC$95,000 
09SC0032009Roadway Improvements for the Clemson University Advanced Materials Center, Anderson County, SC$285,000 
09SC0042009Salters Road Expansion Along I-85, Greenville, SC$95,000 
09SC0052009SC 9 Interchange Improvements, Spartanburg, SC$285,000 
09SC0062009SC Hwy 98 and SC Hwy 160 Connector, SC$712,500 
09SC0072009Widen US 17 in Charleston County from the Isle of Palms Connector to a point at or near Darrell Creek Trail, Mt. Pleasant, SC$380,000 
09SC0082009Widening of US Hwy 221 Between Hunter/Fleming-Smith Industrial City of the City of Laurens, Laurens, SC$285,000 
Total: (8 Projects)$2,375,000 

Back to Top

South Dakota
Project Number Fiscal Year Project Description Designated Amount
09SD0012009Intersection Improvements on US 212 and US 81 and Improvements to US 81, SD$950,000 
Total: (1 Project)$950,000 

Back to Top

Tennessee
Project Number Fiscal Year Project Description Designated Amount
09TN0012009I-69, TN$475,000 
09TN0022009Pedestrian Bridge Connecting South Knoxville Waterfront and the University of Tennessee at Knoxville, TN$570,000 
09TN0032009U.S. Highway 51/Elvis Presley Boulevard Presley Blvd Improvements, TN$475,000 
09TN0042009US Route 64, TN$1,425,000 
Total: (4 Projects)$2,945,000 

Back to Top

Texas
Project Number Fiscal Year Project Description Designated Amount
09TX00120094-Laning of Texas SH 24 (from I-30 to the Oklahoma State Line), Paris, TX$95,000 
09TX0022009Big Creek Mitigation Plan for Highway 36, TX$475,000 
09TX0032009Feasibility Study, Sullivan City, TX$95,000 
09TX0042009Galveston Seawall, TX$95,000 
09TX0052009IH 30 at SH 34 and Monty Stratton Parkway Initiative, TX$570,000 
09TX0062009Mile 1 from Bus 83 to Mile 8, Hidalgo County, TX$665,000 
09TX0072009NETEX Rail Rehabilitation Initiative, TX$95,000 
09TX0082009Reconstruction and Widening of SH-349, Martin and Dawson Counties, TX$475,000 
09TX0092009Relocation of Intersection FM 359 and Mason Road, TX$475,000 
09TX0102009Road Construction, Hidalgo County, TX$522,500 
09TX0112009Robstown Trade Processing and Inland Center, Robstown, TX$237,500 
09TX0122009SH 171 and FM 2231 Traffic Signal, TX$118,750 
09TX0132009NETEX Rail Rehabilitation Initiative, TX$95,000 
Total: (13 Projects)$4,013,750 

Back to Top

Utah
Project Number Fiscal Year Project Description Designated Amount
09UT0012009Bicycle/Pedestrian Pathways Along the West Side of 189 (from 3700 North to 4200 North), Provo, UT$427,500 
09UT0022009Bluff Street Interchange at Red Hills Parkway, UT$475,000 
09UT0032009US-191, Moab to Crescent Junction, UT$1,900,000 
09UT0042009Reconstruction and Upgrade of 2300 West between 1900 South and 2100 North, Lehi, UT$1,235,000 
Total: (4 Projects)$4,037,500 

Back to Top

Vermont
Project Number Fiscal Year Project Description Designated Amount
09VT0012009Sidewalk Improvements, Williamstown, VT$190,000 
09VT0022009St. Albans Streetscape, VT$380,000 
Total: (2 Projects)$570,000 

Back to Top

Virgin Islands
Project Number Fiscal Year Project Description Designated Amount
09VI0012009Construction of Christiansted Bypass Project and Long Bay Project, VI$380,000 
Total: (1 Project)$380,000 

Back to Top

Virginia
Project Number Fiscal Year Project Description Designated Amount
09VA0022009Extension of the Riverwalk Trail, City of Danville, VA$95,000 
09VA0032009Gilmerton Bridge Replacement, VA$237,500 
09VA0042009Hwy 29 at Elizabeth Street Interchange Construction, Danville, VA$95,000 
09VA0052009I-295/Meadowville Road Interchange, VA$475,000 
09VA0062009Multi-use Recreational Trail at High Bridge State Park in Prince Edward County, VA$237,500 
09VA0072009Preliminary Engineering for the Interstate 95/ US Route 17 Interchange Project, Spotsylvania County, VA$95,000 
09VA0082009US 17/Dominion Blvd Widening (Cedar Rd to Great Bridge Blvd) and Drawbridge Replacement (over Atlantic Intercoastal Waterway), Chesapeake, VA$237,500 
09VA0092009Vienna Sidewalk Construction, Vienna, VA$237,500 
Total: (8 Projects)$1,710,000 

Back to Top

Washington
Project Number Fiscal Year Project Description Designated Amount
09WA0012009A-B Street Corridor Connector Project, WA$1,900,000 
09WA0022009Aurora Corridor Improvements - Phase 2, WA$475,000 
09WA0032009Downtown Waterfront Redevelopment Access Project in Vancouver, WA$237,500 
09WA0042009North Parkway Safety Improvement Project, WA$475,000 
09WA0052009Puyallup Shaw Road Extension Project, Puyallup, WA$237,500 
09WA0062009U.S. 101 Safety Improvements at Deer Park, WA$931,000 
09WA0072009U.S. 12 Safety Improvements, WA$2,850,000 
09WA0082009University Place Pedestrian Overpass, WA$475,000 
09WA0092009Woodland Trail Project, WA$475,000 
Total: (9 Projects)$8,056,000 

Back to Top

West Virginia
Project Number Fiscal Year Project Description Designated Amount
09WV0012009Elkins Railyard Project, WV$950,000 
09WV0022009Kanawha Trestle Rail-Trail Project, WV$1,900,000 
09WV0032009Potomac Street Improvement, WV$1,425,000 
09WV0042009Raleigh County Airport, WV$1,045,000 
09WV0052009Slide Repair Work along US 60 in Eastern Kanawha County, WV$4,750,000 
09WV0062009Tabler Station Business Park: Utilities, Transportation and Technology Infrastructure, WV$332,500 
09WV0072009West Virginia Route 10, WV$4,750,000 
09WV0082009West Virginia Route 9, WV$6,650,000 
Total: (8 Projects)$21,802,500 

Back to Top

Wisconsin
Project Number Fiscal Year Project Description Designated Amount
09WI0012009Improvements to US Highway 41 in Outagamie County, WI$380,000 
09WI0022009Mineral Point and Junction Road Intersection, Madison, WI$332,500 
09WI0032009Starkweather Creek Parkway Bike Path, WI$950,000 
09WI0042009US Highway 51 Improvement Project, DeForest, WI$380,000 
Total: (4 Projects)$2,042,500 

Back to Top

Wyoming
Project Number Fiscal Year Project Description Designated Amount
09WY0012009Wyoming 59 Improvements (from Gillette to Wright), Campbell County, WY$95,000 
Total: (1 Project)$95,000 

Back to Top

Grant Totals

Updated: 08/01/2013
HEP Home Planning Environment Real Estate
Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000