| Highway Statistics 2002 | OHPI> Highway Statistics >2002 >Highway Finance >Chart |
| Equipment, Overhead & Profit 1/ | 33.9 |
| Wages 6/ | 19.7 |
| Other | 17.5 |
| Steel 5/ | 3.7 |
| Bitumens 4/ | 7.8 |
| Portland Cement 3/ | 0.6 |
| Aggregates 2/ | 16.7 |
| 99.9 |

Source:
Office of Program Administration
Office of Infrastructure, FHWA
(202) 366-4636
1/ Equipment includes fuel and lubricants 2.9%, but excludes operators' and mechanics' wages. Overhead includes contractors' on-site expenses such as mobilization, office, rental, licenses, insurance, etc.
2/ Aggregates consists of sand, gravel, slag, crushed stone, ect., for use in bases, portland cement, concrete and bituminous surfaces, and portland cement concrete structures.
3/ For both roadway and structures.
4/ For various types of bituminous surfaces and bases.
5/ Includes structural, reinforcing, culvert and miscellaneous steel.
6/ Gross earnings of contractors' employees in the following classifications: Administrative and Supervisory, Skilled, Intermediate, and Unskilled labor.
This table is also availible for download in the following formats:
To view PDF files, you need the Acrobat® Reader®.
OHPI Home | Highway Statistics 2002 | Data Feedback