Appendix A

Highway Interchange Bottlenecks

A.1 Location of Highway Interchange Bottlenecks for Trucks

Figure A.1 shows the location of highway interchange bottlenecks for trucks. The bottleneck locations are indicated by a solid dot. Most are located on urban Interstate interchanges. The size of the open circles accompanying each dot indicate the relative annual truck hours of delay associated with the bottleneck.

Figure A.1 Interchange Capacity Bottlenecks on Freeways Used as Urban Truck Corridors

Map of the continental United States showing the interstate highway system as a network. Highway interchange bottlenecks are indicated by a solid dot, with open circles sized to indicate the truck hours of delay on an annual basis. Population centers along the East coast, in the Midwest, and on the West coast states account for the majority of bottlenecks for trucks.
Source: Cambridge Systematics, Inc.

A.2 Listing of Highway Interchange Bottlenecks for Trucks

This section presents six tables. Tables A.1, A.2, and A.3 list the top 25 highway interchange bottlenecks, ranking them in descending order of annual truck hours of delay for "all trucks" (Table A.1); for "large trucks making longer-distance trips" (i.e., "FAF Trucks") (Table A.2); and for "large trucks making longer-distance trips ("FAF trucks") greater than 500 miles" (Table A.3).

Table A.4 combines the top 25 highway interchange bottlenecks from each of the preceding tables and ranks them in descending order of annual truck hours of delay for "large trucks making longer distance trips (i.e., "FAF trucks") greater than 500 miles."

Table A.5 lists all the highway interchange bottlenecks for trucks identified in the scan, ranking them in descending order of annual truck hours of delay for "all trucks."

Finally, for comparison, Table A.6 lists the top 25 most congested highway interchanges as identified in the American Highway Users Alliance study. These bottlenecks are ranked in descending order of annual hours of delay for all vehicles, including trucks.

The bottleneck ranking in Tables A.1 to A.5 are summarized below.

Table Number Bottlenecks Ranked in Descending Order of Annual
Truck Hours of Delay for …
Table A.1Top 25All Trucks
Table A.2Top 25Large Trucks Making Longer Distance Trips ("FAF Trucks")
Table A.3Top 25Large Trucks Making Longer Distance Trips ("FAF Trucks") Greater Than 500 Miles
Table A.4All top-ranked bottlenecks as identified in Tables 6.1, 6.2, and 6.3, eliminating duplicate listingsLarge Trucks Making Longer Distance Trips ("FAF Trucks") Greater Than 500 Miles
Table A.5AllAll Trucks

The data in the tables and their sources, by column heading, are as follows.

Bottleneck
All Vehicles
All Trucks
Large Trucks Making Longer Distance Trips (i.e., "FAF Trucks")
Table A.1 Top 25 Highway Interchange Bottlenecks for Trucks
Ranked By Annual Hours of Delay for All Trucks
Bottleneck All Vehicles-2004 All Trucks-2004 "Large Trucks Making Longer Distance Trips"-2004
Location Urban Area Critically Congested Route No. No. of Lanes AADT Daily Minutes of Delay per Vehicle AADTT Percent of All Vehicles Annual Hours of Delay All Trucks All Trips Trips Greater Than 500 Miles
AADTT Percent of All Trucks Annual Hours of Delay Annual Commodity Tons Annual Commodity Value Percent of Large Truck Trips Annual Hours of Delay
I-90 @ I-290 Buffalo-Niagara Falls 90 4 136,500 8.3 33,100 24% 1,661,900 7,300 22% 367,000 2,632,500 $2,968,000 58% 212,900
I-285 @ I-85 Interchange ("Spaghetti Junction") Atlanta 285 8 265,300 10.0 27,100 10% 1,641,200 7,800 29% 472,600 2,943,700 $3,262,000 52% 245,800
I-17 (Black Canyon Fwy): I-10 Interchange (the "Stack") to Cactus Phoenix 17 6 217,300 9.2 28,900 13% 1,608,500 9,000 31% 501,600 3,326,700 $3,792,000 48% 240,800
I-90/94 @ I-290 Interchange ("Circle Interchange") Chicago-Northwestern IN 90 8 305,800 9.7 26,300 9% 1,544,900 9,200 35% 540,400 3,718,000 $4,218,000 53% 286,400
San Bernardino Fwy Los Angeles 10 8 268,700 7.2 34,900 13% 1,522,800 11,200 32% 488,700 4,094,500 $4,780,000 31% 151,500
I-94 (Dan Ryan Expwy) @ I-90 Skyway Split (Southside) Chicago-Northwestern IN 94 8 271,700 7.9 31,600 12% 1,512,900 11,100 35% 531,500 4,485,900 $5,089,000 53% 281,700
I-285 @ I-75 Interchange Atlanta 285 6 226,300 9.6 25,700 11% 1,497,300 7,400 29% 431,500 2,792,800 $3,095,000 52% 224,400
SR 134 @ SR 2 Interchange Los Angeles 134 8 247,900 8.3 29,600 12% 1,489,400 9,500 32% 477,500 3,473,000 $4,054,000 31% 148,000
I-77 @ Tryon Rd Charlotte 77 6 170,500 8.3 29,600 17% 1,487,100 7,300 25% 367,000 2,700,200 $2,983,000 45% 165,200
Long Beach Fwy Los Angeles 710 8 246,100 8.3 27,500 11% 1,380,300 8,800 32% 442,400 3,217,100 $3,756,000 31% 137,100
I-20 @ I-285 Interchange Atlanta 20 6 187,200 8.3 27,000 14% 1,359,400 7,800 29% 392,100 2,943,700 $3,262,000 52% 203,900
I-80/I-94 split (Southside) Chicago-Northwestern IN 80 4 139,600 8.6 25,600 18% 1,343,600 9,000 35% 472,400 3,637,200 $4,127,000 53% 250,400
SR 60 @ I-605 Interchange Los Angeles 60 8 233,000 8.3 26,100 11% 1,314,200 8,400 32% 422,300 3,070,900 $3,585,000 31% 130,900
Pulaski Rd @ I-55 Chicago-Northwestern IN 55 6 197,200 7.5 28,700 15% 1,300,400 10,000 35% 453,700 4,041,300 $4,585,000 53% 240,500
I-75 @ I-85 Interchange Atlanta 75 10 339,600 9.1 23,400 7% 1,288,800 6,800 29% 374,900 2,566,300 $2,844,000 52% 194,900
I-93 @ I-95 Interchange Boston 93 6 188,400 8.3 25,500 14% 1,280,100 2,800 11% 140,800 1,020,000 $1,220,000 36% 50,700
I-290 @ I-355 Chicago-Northwestern IN 290 6 223,100 8.3 24,800 11% 1,246,200 8,700 35% 437,300 3,515,900 $3,989,000 53% 231,800
I-405 (San Diego Fwy) @ I-605 Interchange Los Angeles 405 10 331,700 9.8 20,900 6% 1,245,500 6,700 32% 398,600 2,449,400 $2,859,000 31% 123,600
I-80 @ Central St. San Francisco-Oakland 80 8 270,200 8.3 23,800 9% 1,196,700 7,800 33% 392,100 2,851,500 $3,329,000 29% 113,700
San Gabriel River Fwy Los Angeles 91 10 295,700 8.1 24,100 8% 1,194,300 7,700 32% 381,100 2,815,000 $3,286,000 31% 118,100
I-20 @ Fulton St. Atlanta 20 6 207,300 8.1 23,700 11% 1,172,700 6,800 29% 336,500 2,566,300 $2,844,000 52% 175,000

Table A.2 Top 25 Highway Interchange Bottlenecks for Trucks
Ranked By Annual Hours of Delay for Large Trucks Making Longer-Distance Trips
Bottleneck All Vehicles-2004 All Trucks-2004 "Large Trucks Making Longer Distance Trips"-2004
Location Urban Area Critically Congested Route No. No. of Lanes AADT Daily Minutes of Delay per Vehicle AADTT Percent of All Vehicles Annual Hours of Delay All Trucks All Trips Trips Greater Than 500 Miles
AADTT Percent of All Trucks Annual Hours of Delay Annual Commodity Tons Annual Commodity Value Percent of Large Truck Trips Annual Hours of Delay
I-35 @ Martin Luther King Jr Austin 35 6 229,500 8.3 12,600 5% 635,000 11,200 89% 563,000 4,123,900 $4,768,000 39% 219,600
I-90/94 @ I-290 Interchange ("Circle Interchange") Chicago-Northwestern IN 90 8 305,800 9.7 26,300 9% 1,544,900 9,200 35% 540,400 3,718,000 $4,218,000 53% 286,400
I-94 (Dan Ryan Expwy) @ I-90 Skyway Split (Southside) Chicago-Northwestern IN 94 8 271,700 7.9 31,600 12% 1,512,900 11,100 35% 531,500 4,485,900 $5,089,000 53% 281,700
I-17 (Black Canyon Fwy): I-10 Interchange (the "Stack") to Cactus Phoenix 17 6 217,300 9.2 28,900 13% 1,608,500 9,000 31% 501,600 3,326,700 $3,792,000 48% 240,800
San Bernardino Fwy Los Angeles 10 8 268,700 7.2 34,900 13% 1,522,800 11,200 32% 488,700 4,094,500 $4,780,000 31% 151,500
SR 134 @ SR 2 Interchange Los Angeles 134 8 247,900 8.3 29,600 12% 1,489,400 9,500 32% 477,500 3,473,000 $4,054,000 31% 148,000
I-285 @ I-85 Interchange ("Spaghetti Junction") Atlanta 285 8 265,300 10.0 27,100 10% 1,641,200 7,800 29% 472,600 2,943,700 $3,262,000 52% 245,800
I-80/I-94 split (Southside)Chicago-Northwestern IN 80 4 139,600 8.6 25,600 18% 1,343,600 9,000 35% 472,400 3,637,200 $4,127,000 53% 250,400
I-24 @ I-440N Interchange Chattanooga (TN-GA) 24 4 118,200 8.3 18,500 16% 927,500 9,200 50% 462,500 3,330,000 $3,750,000 85% 393,100
Pulaski Rd @ I-55 Chicago-Northwestern IN 55 6 197,200 7.5 28,700 15% 1,300,400 10,000 35% 453,700 4,041,300 $4,585,000 53% 240,500
Long Beach Fwy Los Angeles 710 8 246,100 8.3 27,500 11% 1,380,300 8,800 32% 442,400 3,217,100 $3,756,000 31% 137,100
I-290 @ I-355 Chicago-Northwestern IN 290 6 223,100 8.3 24,800 11% 1,246,200 8,700 35% 437,300 3,515,900 $3,989,000 53% 231,800
I-285 @ I-75 Interchange Atlanta 285 6 226,300 9.6 25,700 11% 1,497,300 7,400 29% 431,500 2,792,800 $3,095,000 52% 224,400
SR 60 @ I-605 Interchange Los Angeles 60 8 233,000 8.3 26,100 11% 1,314,200 8,400 32% 422,300 3,070,900 $3,585,000 31% 130,900
I-75 @ I-74 Interchange Cincinnati (OH-KY) 75 6 193,100 9.7 19,200 10% 1,128,900 6,900 36% 405,300 2,735,200 $3,044,000 63% 255,300
I-405 (San Diego Fwy) @ I-605 Interchange Los Angeles 405 10 331,700 9.8 20,900 6% 1,245,500 6,700 32% 398,600 2,449,400 $2,859,000 31% 123,600
I-75 @ U.S. 35 Interchange Dayton 75 4 127,400 8.3 18,400 14% 923,100 7,900 43% 397,100 3,131,600 $3,485,000 54% 214,400
I-20 @ I-285 Interchange Atlanta 20 6 187,200 8.3 27,000 14% 1,359,400 7,800 29% 392,100 2,943,700 $3,262,000 52% 203,900
I-80 @ Central St. San Francisco-Oakland 80 8 270,200 8.3 23,800 9% 1,196,700 7,800 33% 392,100 2,851,500 $3,329,000 29% 113,700
San Gabriel River Fwy Los Angeles 91 10 295,700 8.1 24,100 8% 1,194,300 7,700 32% 381,100 2,815,000 $3,286,000 31% 118,100
I-10 @ I-110 Interchange Baton Rouge 10 6 150,400 7.2 15,200 10% 665,000 8,600 57% 375,200 3,163,900 $3,591,000 68% 255,100
I-75 @ I-85 Interchange Atlanta 75 10 339,600 9.1 23,400 7% 1,288,800 6,800 29% 374,900 2,566,300 $2,844,000 52% 194,900
I-90 @ I-290 Buffalo-Niagara Falls 90 4 136,500 8.3 33,100 24% 1,661,900 7,300 22% 367,000 2,632,500 $2,968,000 58% 212,900
I-77 @ Tryon Rd Charlotte 77 6 170,500 8.3 29,600 17% 1,487,100 7,300 25% 367,000 2,700,200 $2,983,000 45% 165,200
I-880 @ I-238 San Franciso-Oakland 880 8 282,700 8.3 22,000 8% 1,106,700 7,200 33% 361,900 2,632,200 $3,073,000 29% 105,000

Table A.3 Top 25 Highway Interchange Bottlenecks for Trucks
Ranked By Annual Hours of Delay for Large Trucks Making Longer Trips Greater Than 500 Miles
Bottleneck All Vehicles-2004 All Trucks-2004 "Large Trucks Making Longer Distance Trips"-2004
Location Urban Area Critically Congested Route No. No. of Lanes AADT Daily Minutes of Delay per Vehicle AADTT Percent of All Vehicles Annual Hours of Delay All Trucks All Trips Trips Greater Than 500 Miles
AADTT Percent of All Trucks Annual Hours of Delay Annual Commodity Tons Annual Commodity Value Percent of Large Truck Trips Annual Hours of Delay
I-24 @ I-440N Interchange Chattanooga (TN-GA) 24 4 118,200 8.3 18,500 16% 927,500 9,200 50% 462,500 3,330,000 $3,750,000 85% 393,100
U.S. 95 @ I-15 Interchange ("Spaghetti Bowl") Las Vegas 95 6 199,900 9.8 11,300 6% 670,400 5,600 50% 333,100 1,992,500 $2,286,000 90% 299,800
I-90/94 @ I-290 Interchange ("Circle Interchange") Chicago-Northwestern IN 90 8 305,800 9.7 26,300 9% 1,544,900 9,200 35% 540,400 3,718,000 $4,218,000 53% 286,400
I-94 (Dan Ryan Expwy) @ I-90 Skyway Split (Southside) Chicago-Northwestern IN 94 8 271,700 7.9 31,600 12% 1,512,900 11,100 35% 531,500 4,485,900 $5,089,000 53% 281,700
I-75 @ I-74 Interchange Cincinnati (OH-KY) 75 6 193,100 9.7 19,200 10% 1,128,900 6,900 36% 405,300 2,735,200 $3,044,000 63% 255,300
I-10 @ I-110 Interchange Baton Rouge 10 6 150,400 7.2 15,200 10% 665,000 8,600 57% 375,200 3,163,900 $3,591,000 68% 255,100
I-80/I-94 split (Southside) Chicago-Northwestern IN 80 4 139,600 8.6 25,600 18% 1,343,600 9,000 35% 472,400 3,637,200 $4,127,000 53% 250,400
I-285 @ I-85 Interchange ("Spaghetti Junction") Atlanta 285 8 265,300 10.0 27,100 10% 1,641,200 7,800 29% 472,600 2,943,700 $3,262,000 52% 245,800
I-17 (Black Canyon Fwy): I-10 Interchange (the "Stack") to Cactus Phoenix 17 6 217,300 9.2 28,900 13% 1,608,500 9,000 31% 501,600 3,326,700 $3,792,000 48% 240,800
Pulaski Rd @ I-55 Chicago-Northwestern IN 55 6 197,200 7.5 28,700 15% 1,300,400 10,000 35% 453,700 4,041,300 $4,585,000 53% 240,500
I-290 @ I-355 Chicago-Northwestern IN 290 6 223,100 8.3 24,800 11% 1,246,200 8,700 35% 437,300 3,515,900 $3,989,000 53% 231,800
I-40 @ I-24 Interchange Nashville 40 4 147,600 8.3 14,600 10% 735,200 5,800 40% 291,600 2,099,300 $2,364,000 77% 224,500
I-285 @ I-75 Interchange Atlanta 285 6 226,300 9.6 25,700 11% 1,497,300 7,400 29% 431,500 2,792,800 $3,095,000 52% 224,400
I-35 @ Martin Luther King Jr Austin 35 6 229,500 8.3 12,600 5% 635,000 11,200 89% 563,000 4,123,900 $4,768,000 39% 219,600
I-15 between Tropicana and Flamingo Las Vegas 15 6 165,900 6.4 12,400 7% 486,700 6,200 50% 242,800 2,206,000 $2,530,000 90% 218,500
I-12 @ Amite River, Baton Rouge Baton Rouge 12 4 105,000 6.4 14,400 14% 561,900 8,100 57% 317,200 2,980,000 $3,383,000 68% 215,700
I-75 @ U.S. 35 Interchange Dayton 75 4 127,400 8.3 18,400 14% 923,100 7,900 43% 397,100 3,131,600 $3,485,000 54% 214,400
I-90 @ I-290 Buffalo-Niagara Falls 90 4 136,500 8.3 33,100 24% 1,661,900 7,300 22% 367,000 2,632,500 $2,968,000 58% 212,900
I-20 @ I-285 InterchangeAtlanta 20 6 187,200 8.3 27,000 14% 1,359,400 7,800 29% 392,100 2,943,700 $3,262,000 52% 203,900
I-75 @ I-85 Interchange Atlanta 75 10 339,600 9.1 23,400 7% 1,288,800 6,800 29% 374,900 2,566,300 $2,844,000 52% 194,900
I-264 @ I-64 Interchange Louisville (KY-IN) 264 6 181,100 8.3 16,400 9% 825,500 5,400 33% 271,400 1,990,200 $2,218,000 69% 187,300
I-55 (Stevenson Expwy) @ I-294 Interchange Chicago-Northwestern IN 55 6 172,600 9.6 17,200 10% 1,001,600 6,000 35% 349,900 2,424,800 $2,751,000 53% 185,400
I-80 @ I-480 Interchange Omaha (NE-IA) 80 5 173,600 7.9 13,800 8% 658,500 4,500 32% 215,500 1,638,000 $1,856,000 86% 185,300
I-76 @ SR 77 Interchange+J179 Akron 76 4 122,600 8.3 14,000 11% 705,200 7,000 50% 351,900 2,774,800 $3,088,000 52% 183,000
I-15 @ I-215 Interchange (the "Fishbowl") Las Vegas 15 6 165,600 6.6 10,100 6% 403,200 5,000 50% 200,300 1,779,100 $2,041,000 90% 180,300

Table A.4 Highway Interchange Bottlenecks for Trucks
All High-Ranked Bottlenecks Ranked By Annual Hours of Delay for Large Trucks Making Longer Trips Greater Than 500 Miles
Bottleneck All Vehicles-2004 All Trucks-2004 "Large Trucks Making Longer Distance Trips"-2004
Location Urban Area Critically Congested Route No. No. of Lanes AADT Daily Minutes of Delay per Vehicle AADTT Percent of All Vehicles Annual Hours of Delay All Trucks All Trips Trips Greater Than 500 Miles
AADTT Percent of All Trucks Annual Hours of Delay Annual Commodity Tons Annual Commodity Value Percent of Large Truck Trips Annual Hours of Delay
I-24 @ I-440N Interchange Chattanooga (TN-GA) 24 4 118,200 8.3 18,500 16% 927,500 9,200 50% 462,500 3,330,000 $3,750,000 85% 393,100
U.S. 95 @ I-15 Interchange ("Spaghetti Bowl") Las Vegas 95 6 199,900 9.8 11,300 6% 670,400 5,600 50% 333,100 1,992,500 $2,286,000 90% 299,800
I-90/94 @ I-290 Interchange ("Circle Interchange") Chicago-Northwestern IN 90 8 305,800 9.7 26,300 9% 1,544,900 9,200 35% 540,400 3,718,000 $4,218,000 53% 286,400
I-94 (Dan Ryan Expwy) @ I-90 Skyway Split (Southside) Chicago-Northwestern IN 94 8 271,700 7.9 31,600 12% 1,512,900 11,100 35% 531,500 4,485,900 $5,089,000 53% 281,700
I-75 @ I-74 Interchange Cincinnati (OH-KY) 75 6 193,100 9.7 19,200 10% 1,128,900 6,900 36% 405,300 2,735,200 $3,044,000 63% 255,300
I-10 @ I-110 Interchange Baton Rouge 10 6 150,400 7.2 15,200 10% 665,000 8,600 57% 375,200 3,163,900 $3,591,000 68% 255,100
I-80/I-94 split (Southside) Chicago-Northwestern IN 80 4 139,600 8.6 25,600 18% 1,343,600 9,000 35% 472,400 3,637,200 $4,127,000 53% 250,400
I-285 @ I-85 Interchange ("Spaghetti Junction") Atlanta 285 8 265,300 10.0 27,100 10% 1,641,200 7,800 29% 472,600 2,943,700 $3,262,000 52% 245,800
I-17 (Black Canyon Fwy): I-10 Interchange (the "Stack") to Cactus Phoenix 17 6 217,300 9.2 28,900 13% 1,608,500 9,000 31% 501,600 3,326,700 $3,792,000 48% 240,800
Pulaski Rd @ I-55 Chicago-Northwestern IN 55 6 197,200 7.5 28,700 15% 1,300,400 10,000 35% 453,700 4,041,300 $4,585,000 53% 240,500
I-290 @ I-355 Chicago-Northwestern IN 290 6 223,100 8.3 24,800 11% 1,246,200 8,700 35% 437,300 3,515,900 $3,989,000 53% 231,800
I-40 @ I-24 Interchange Nashville 40 4 147,600 8.3 14,600 10% 735,200 5,800 40% 291,600 2,099,300 $2,364,000 77% 224,500
I-285 @ I-75 Interchange Atlanta 285 6 226,300 9.6 25,700 11% 1,497,300 7,400 29% 431,500 2,792,800 $3,095,000 52% 224,400
I-35 @ Martin Luther King Jr Austin 35 6 229,500 8.3 12,600 5% 635,000 11,200 89% 563,000 4,123,900 $4,768,000 39% 219,600
I-15 between Tropicana and Flamingo Las Vegas 15 6 165,900 6.4 12,400 7% 486,700 6,200 50% 242,800 2,206,000 $2,530,000 90% 218,500
I-12 @ Amite River, Baton Rouge Baton Rouge 12 4 105,000 6.4 14,400 14% 561,900 8,100 57% 317,200 2,980,000 $3,383,000 68% 215,700
I-75 @ U.S. 35 Interchange Dayton 75 4 127,400 8.3 18,400 14% 923,100 7,900 43% 397,100 3,131,600 $3,485,000 54% 214,400
I-90 @ I-290 Buffalo-Niagara Falls 90 4 136,500 8.3 33,100 24% 1,661,900 7,300 22% 367,000 2,632,500 $2,968,000 58% 212,900
I-20 @ I-285 InterchangeAtlanta 20 6 187,200 8.3 27,000 14% 1,359,400 7,800 29% 392,100 2,943,700 $3,262,000 52% 203,900
I-75 @ I-85 Interchange Atlanta 75 10 339,600 9.1 23,400 7% 1,288,800 6,800 29% 374,900 2,566,300 $2,844,000 52% 194,900
I-264 @ I-64 Interchange Louisville (KY-IN) 264 6 181,100 8.3 16,400 9% 825,500 5,400 33% 271,400 1,990,200 $2,218,000 69% 187,300
I-55 (Stevenson Expwy) @ I-294 Interchange Chicago-Northwestern IN 55 6 172,600 9.6 17,200 10% 1,001,600 6,000 35% 349,900 2,424,800 $2,751,000 53% 185,400
I-80 @ I-480 Interchange Omaha (NE-IA) 80 5 173,600 7.9 13,800 8% 658,500 4,500 32% 215,500 1,638,000 $1,856,000 86% 185,300
I-76 @ SR 77 Interchange+J179 Akron 76 4 122,600 8.3 14,000 11% 705,200 7,000 50% 351,900 2,774,800 $3,088,000 52% 183,000
I-15 @ I-215 Interchange (the "Fishbowl") Las Vegas 15 6 165,600 6.6 10,100 6% 403,200 5,000 50% 200,300 1,779,100 $2,041,000 90% 180,300
I-20 @ Fulton St. Atlanta 20 6 207,300 8.1 23,700 11% 1,172,700 6,800 29% 336,500 2,566,300 $2,844,000 52% 175,000
I-77 @ Tryon Rd Charlotte 77 6 170,500 8.3 29,600 17% 1,487,100 7,300 25% 367,000 2,700,200 $2,983,000 45% 165,200
San Bernardino Fwy Los Angeles 10 8 268,700 7.2 34,900 13% 1,522,800 11,200 32% 488,700 4,094,500 $4,780,000 31% 151,500
SR-134 @ SR 2 Interchange Los Angeles 134 8 247,900 8.3 29,600 12% 1,489,400 9,500 32% 477,500 3,473,000 $4,054,000 31% 148,000
Long Beach Fwy Los Angeles 710 8 246,100 8.3 27,500 11% 1,380,300 8,800 32% 442,400 3,217,100 $3,756,000 31% 137,100
SR 60 @ I-605 Interchange Los Angeles 60 8 233,000 8.3 26,100 11% 1,314,200 8,400 32% 422,300 3,070,900 $3,585,000 31% 130,900
I-405 (San Diego Fwy) @ I-605 Interchange Los Angeles 405 10 331,700 9.8 20,900 6% 1,245,500 6,700 32% 398,600 2,449,400 $2,859,000 31% 123,600
San Gabriel River Fwy Los Angeles 91 10 295,700 8.1 24,100 8% 1,194,300 7,700 32% 381,100 2,815,000 $3,286,000 31% 118,100
I-80 @ Central St. San Francisco-Oakland 80 8 270,200 8.3 23,800 9% 1,196,700 7,800 33% 392,100 2,851,500 $3,329,000 29% 113,700
I-880 @ I-238 San Francisco-Oakland 880 8 282,700 8.3 22,000 8% 1,106,700 7,200 33% 361,900 2,632,200 $3,073,000 29% 105,000
I-93 @ I-95 Interchange Boston 93 6 188,400 8.3 25,500 14% 1,280,100 2,800 11% 140,800 1,020,000 $1,220,000 36% 50,700

Table A.5 All Highway Interchange Bottlenecks for Trucks
Ranked By Annual Hours of Delay for All Trucks
Bottleneck All Vehicles-2004 All Trucks-2004 "Large Trucks Making Longer Distance Trips"-2004
Location Urban Area Critically Congested Route No. No. of Lanes AADT Daily Minutes of Delay per Vehicle AADTT Percent of All Vehicles Annual Hours of Delay All Trucks All Trips Trips Greater Than 500 Miles
AADTT Percent of All Trucks Annual Hours of Delay Annual Commodity Tons Annual Commodity Value Percent of Large Truck Trips Annual Hours of Delay
I-90 @ I-290 Buffalo-Niagara Falls 90 4 136,500 8.3 33,100 24% 1,661,900 7,300 22% 367,000 2,632,500 $2,968,000 58% 212,900
I-285 @ I-85 Interchange ("Spaghetti Junction") Atlanta 285 8 265,300 10.0 27,100 10% 1,641,200 7,800 29% 472,600 2,943,700 $3,262,000 52% 245,800
I-17 (Black Canyon Fwy): I-10 Interchange (the "Stack") to Cactus Phoenix 17 6 217,300 9.2 28,900 13% 1,608,500 9,000 31% 501,600 3,326,700 $3,792,000 48% 240,800
I-90/94 @ I-290 Interchange ("Circle Interchange") Chicago-Northwestern IN 90 8 305,800 9.7 26,300 9% 1,544,900 9,200 35% 540,400 3,718,000 $4,218,000 53% 286,400
San Bernardino Fwy Los Angeles 10 8 268,700 7.2 34,900 13% 1,522,800 11,200 32% 488,700 4,094,500 $4,780,000 31% 151,500
I-94 (Dan Ryan Expwy) @ I-90 Skyway Split (Southside) Chicago-Northwestern IN 94 8 271,700 7.9 31,600 12% 1,512,900 11,100 35% 531,500 4,485,900 $5,089,000 53% 281,700
I-285 @ I-75 Interchange Atlanta 285 6 226,300 9.6 25,700 11% 1,497,300 7,400 29% 431,500 2,792,800 $3,095,000 52% 224,400
SR 134 @ SR 2 Interchange Los Angeles 134 8 247,900 8.3 29,600 12% 1,489,400 9,500 32% 477,500 3,473,000 $4,054,000 31% 148,000
I-77 @ Tryon Rd Charlotte 77 6 170,500 8.3 29,600 17% 1,487,100 7,300 25% 367,000 2,700,200 $2,983,000 45% 165,200
Long Beach Fwy Los Angeles 710 8 246,100 8.3 27,500 11% 1,380,300 8,800 32% 442,400 3,217,100 $3,756,000 31% 137,100
I-20 @ I-285 Interchange Atlanta 20 6 187,200 8.3 27,000 14% 1,359,400 7,800 29% 392,100 2,943,700 $3,262,000 52% 203,900
I-80/I-94 split (Southside) Chicago-Northwestern IN 80 4 139,600 8.6 25,600 18% 1,343,600 9,000 35% 472,400 3,637,200 $4,127,000 53% 250,400
SR 60 @ I-605 Interchange Los Angeles 60 8 233,000 8.3 26,100 11% 1,314,200 8,400 32% 422,300 3,070,900 $3,585,000 31% 130,900
Pulaski Rd @ I-55 Chicago-Northwestern IN 55 6 197,200 7.5 28,700 15% 1,300,400 10,000 35% 453,700 4,041,300 $4,585,000 53% 240,500
I-75 @ I-85 Interchange Atlanta 75 10 339,600 9.1 23,400 7% 1,288,800 6,800 29% 374,900 2,566,300 $2,844,000 52% 194,900
I-93 @ I-95 Interchange Boston 93 6 188,400 8.3 25,500 14% 1,280,100 2,800 11% 140,800 1,020,000 $1,220,000 36% 50,700
I-290 @ I-355 Chicago-Northwestern IN 290 6 223,100 8.3 24,800 11% 1,246,200 8,700 35% 437,300 3,515,900 $3,989,000 53% 231,800
I-405 (San Diego Fwy) @ I-605 Interchange Los Angeles 405 10 331,700 9.8 20,900 6% 1,245,500 6,700 32% 398,600 2,449,400 $2,859,000 31% 123,600
I-80 @ Central St. San Francisco-Oakland 80 8 270,200 8.3 23,800 9% 1,196,700 7,800 33% 392,100 2,851,500 $3,329,000 29% 113,700
San Gabriel River Fwy Los Angeles 91 10 295,700 8.1 24,100 8% 1,194,300 7,700 32% 381,100 2,815,000 $3,286,000 31% 118,100
I-20 @ Fulton St. Atlanta 20 6 207,300 8.1 23,700 11% 1,172,700 6,800 29% 336,500 2,566,300 $2,844,000 52% 175,000
I-75 @ I-74 Interchange Cincinnati (OH-KY) 75 6 193,100 9.7 19,200 10% 1,128,900 6,900 36% 405,300 2,735,200 $3,044,000 63% 255,300
I-880 @ I-238 San Francisco-Oakland 880 8 282,700 8.3 22,000 8% 1,106,700 7,200 33% 361,900 2,632,200 $3,073,000 29% 105,000
SR 315 @ I-70 Interchange Columbus 315 2 64,000 8.3 21,800 34% 1,097,600 5,500 25% 276,500 2,180,200 $2,426,000 14% 38,700
Columbia Rd @ I-93 Boston 93 6 189,300 6.4 27,600 15% 1,081,800 3,000 11% 117,500 1,092,900 $1,307,000 36% 42,300
I-270 @ I-70 Interchange (West) Columbus 270 4 122,600 9.5 18,600 15% 1,077,800 4,700 25% 271,900 1,863,100 $2,073,000 14% 38,100
SR 91 @ I-215 Interchange Riverside-San Bernardino 91 10 276,500 6.7 26,100 9% 1,067,600 8,000 31% 327,700 2,924,600 $3,414,000 34% 111,400
I-710 @ Whittier Blvd Los Angeles 60 8 257,500 5.5 31,500 12% 1,059,700 10,100 32% 340,200 3,692,300 $4,310,000 31% 105,500
Loop-202: Dobson to I-10 Phoenix 202 8 228,000 7.5 23,300 10% 1,055,700 7,200 31% 326,700 2,661,300 $3,033,000 48% 156,800
Worcester Rd @ I-95 Boston 95 6 173,600 8.1 21,000 12% 1,041,800 2,300 11% 113,800 837,900 $1,002,000 36% 41,000
I-10 @ SR 51/SR 202 Interchange ("Mini-Stack") Phoenix 10 8 293,000 7.9 21,700 7% 1,038,000 6,700 31% 320,800 2,476,500 $2,823,000 48% 154,000
Orange Fwy Los Angeles 91 7 244,200 8.0 21,100 9% 1,029,700 6,800 32% 331,100 2,485,900 $2,902,000 31% 102,600
I-495 @ I-95 Interchange (MD) Washington (DC-MD-VA) 95 5 193,100 9.7 17,300 9% 1,020,100 2,400 14% 141,900 880,600 $978,000 53% 75,200
I-95 @ I-595 Interchange Miami-Hialeah 95 9 308,500 8.3 20,100 7% 1,011,400 3,900 20% 196,000 1,467,900 $1,657,000 50% 98,000
I-55 (Stevenson Expwy) @ I-294 Interchange Chicago-Northwestern IN 55 6 172,600 9.6 17,200 10% 1,001,600 6,000 35% 349,900 2,424,800 $2,751,000 53% 185,400
I-10 @ I-17 Interchange West (the "Stack") Phoenix 10 8 238,800 8.4 19,300 8% 982,600 6,000 31% 306,200 2,217,800 $2,528,000 48% 147,000
I-76 @ Girard Ave Philadelphia (PA-NJ) 76 6 200,400 7.3 22,100 11% 982,200 5,600 26% 249,200 2,133,600 $2,397,000 26% 64,800
I-71 @ I-70 Interchange Columbus 71 3 112,500 8.3 19,300 17% 968,800 4,900 25% 246,300 1,942,400 $2,162,000 14% 34,500
SR 91 @ I-215 Interchange Riverside-San Bernardino 91 10 275,500 6.7 23,600 9% 966,900 7,300 31% 299,000 2,668,700 $3,115,000 34% 101,700
Darby Paoli Rd @ U.S. 202 Philadelphia (PA-NJ) 202 4 114,200 8.3 18,900 17% 950,600 4,800 26% 241,300 1,828,800 $2,055,000 26% 62,700
U.S. 57 @ U.S. 91 Los Angeles 57 10 291,000 7.9 19,800 7% 946,900 6,300 32% 301,700 2,303,100 $2,689,000 31% 93,500
I-24 @ I-440N Interchange Chattanooga (TN-GA) 24 4 118,200 8.3 18,500 16% 927,500 9,200 50% 462,500 3,330,000 $3,750,000 85% 393,100
I-75 @ U.S. 35 Interchange Dayton 75 4 127,400 8.3 18,400 14% 923,100 7,900 43% 397,100 3,131,600 $3,485,000 54% 214,400
I-110 @ Saulson Ave Los Angeles 110 10 333,500 8.3 18,100 5% 910,000 5,800 32% 291,600 2,120,400 $2,475,000 31% 90,400
I-5 (San Diego Fwy) @ I-405 Interchange ("El Toro") Los Angeles 5 11 371,500 7.0 20,800 6% 887,600 6,700 32% 286,400 2,449,400 $2,859,000 31% 88,800
I-495 @ I-270 Interchange Washington (DC-MD-VA) 495 7 253,700 8.6 16,800 7% 884,100 2,400 14% 126,000 880,600 $978,000 53% 66,800
I-70 @ I-25 Interchange ("Mousetrap") Denver 70 4 157,300 8.3 17,100 11% 859,200 2,900 17% 145,800 1,099,000 $1,243,000 67% 97,700
U.S. 101 (Ventura Fwy) @ I-405 Interchange Los Angeles 101 10 331,300 9.8 14,400 4% 855,600 4,600 32% 273,700 1,681,700 $1,963,000 31% 84,800
I-70 @ U.S. 23 Interchange Columbus 70 5 163,900 8.3 16,700 10% 839,100 4,200 25% 211,100 1,664,900 $1,853,000 14% 29,600
I-264 @ I-64 Interchange Louisville (KY-IN) 264 6 181,100 8.3 16,400 9% 825,500 5,400 33% 271,400 1,990,200 $2,218,000 69% 187,300
I-35W @ SR 62 Interchange Minneapolis-St. Paul 35 6 183,300 10.0 13,500 7% 815,600 4,400 33% 266,600 1,634,500 $1,866,000 58% 154,600
I-610 @ I-10 Interchange (West) Houston 610 8 307,700 9.3 14,200 5% 808,500 5,600 40% 318,400 2,062,000 $2,384,000 44% 140,100
I-405 (San Diego Fwy) @ I-10 Interchange Los Angeles 405 10 308,500 10.0 12,900 4% 784,300 4,100 32% 248,400 1,498,900 $1,750,000 31% 77,000
I-40 @ I-24 Interchange Nashville 40 4 147,600 8.3 14,600 10% 735,200 5,800 40% 291,600 2,099,300 $2,364,000 77% 224,500
I-57 @ 12th St. Chicago-Northwestern IN 57 6 174,200 3.8 31,600 18% 733,800 11,100 35% 257,600 4,485,900 $5,089,000 53% 136,500
I-5 (Santa Ana Fwy) @ SR 22/SR 57 Interchange ("Orange Crush") Los Angeles 5 10 321,300 6.0 19,900 6% 726,400 6,400 32% 233,100 2,339,700 $2,731,000 31% 72,300
I-70 @ U.S. 67 Interchange St. Louis (MO-IL) 70 6 177,100 8.3 14,400 8% 721,500 3,100 21% 155,800 1,148,000 $1,303,000 75% 116,900
I-76 @ SR 77 Interchange+J179 Akron 76 4 122,600 8.3 14,000 11% 705,200 7,000 50% 351,900 2,774,800 $3,088,000 52% 183,000
I-105 @ U.S. 107 Interchange Los Angeles 105 8 240,200 8.1 14,200 6% 702,100 4,500 32% 222,700 1,645,100 $1,920,000 31% 69,000
Southern State Parkway @ Exit 25A New York-Northeastern NJ 908 6 204,500 5.4 21,400 10% 699,800 6,200 29% 203,200 2,235,800 $2,521,000 27% 54,900
U.S. 101 @ I-280 Interchange San Francisco-Oakland 101 8 261,600 8.3 13,400 5% 673,400 4,400 33% 221,200 1,608,500 $1,878,000 29% 64,100
U.S. 95 @ I-15 Interchange ("Spaghetti Bowl") Las Vegas 95 6 199,900 9.8 11,300 6% 670,400 5,600 50% 333,100 1,992,500 $2,286,000 90% 299,800
U.S. 101 @ I-880 Interchange San Jose 101 8 254,500 9.3 11,900 5% 669,000 2,700 23% 152,000 987,100 $1,152,000 16% 24,300
I-10 @ I-110 Interchange Baton Rouge 10 6 150,400 7.2 15,200 10% 665,000 8,600 57% 375,200 3,163,900 $3,591,000 68% 255,100
U.S. 101 @ SR 92 Interchange San Francisco-Oakland 101 8 263,600 8.3 13,200 5% 663,800 4,300 33% 216,200 1,572,000 $1,835,000 29% 62,700
I-75 @ I-275 Interchange Cincinnati (OH-KY) 75 6 174,800 4.7 23,400 13% 662,900 8,400 36% 237,800 3,095,900 $3,451,000 63% 149,800
Between I-25 and Paseo Del Norte Albuquerque 40 4 157,100 8.3 13,200 8% 662,600 2,500 19% 125,700 974,500 $1,100,000 91% 114,400
I-80 @ I-480 Interchange Omaha (NE-IA) 80 5 173,600 7.9 13,800 8% 658,500 4,500 32% 215,500 1,638,000 $1,856,000 86% 185,300
I-278 @ Exit 36 New York-Northeastern NJ 278 6 210,000 7.7 13,900 7% 654,600 4,000 29% 188,200 1,442,500 $1,626,000 27% 50,800
Pomona Fwy: SR 91 Interchange Riverside-San Bernardino 215 6 175,300 7.7 13,900 8% 653,800 4,300 31% 202,400 1,572,000 $1,835,000 34% 68,800
I-5: Interstate Bridge and bridge influence area Portland-Vancouver (OR-WA) 5 4 109,900 8.7 12,100 11% 644,200 4,100 34% 218,100 1,484,600 $1,716,000 33% 72,000
U.S. 1 @ I-95 Interchange Philadelphia (PA-NJ) 95 8 207,800 5.7 18,600 9% 643,900 4,700 26% 162,600 1,742,100 $1,938,000 26% 42,300
I-94 @ I-75 Interchange Detroit 94 6 167,200 6.9 15,400 9% 643,700 4,400 29% 184,200 1,597,400 $1,795,000 32% 58,900
SR 167 SB @ 15th St. in Auburn Seattle 167 5 121,800 9.4 11,100 9% 638,900 2,700 24% 154,900 990,000 $1,119,000 15% 23,200
I-5 @ SR 56 Interchange San Diego 5 8 234,200 7.7 13,500 6% 635,100 3,600 27% 169,400 1,316,100 $1,536,000 16% 27,100
I-35 @ Martin Luther King Jr Austin 35 6 229,500 8.3 12,600 5% 635,000 11,200 89% 563,000 4,123,900 $4,768,000 39% 219,600
I-695: Between I-70 and I-95 Baltimore 695 6 180,800 8.4 12,100 7% 616,800 2,700 22% 137,800 990,600 $1,101,000 49% 67,500
U.S. 87 @ U.S. 36 Denver 25 7 247,700 8.0 12,600 5% 614,100 2,100 17% 102,300 795,800 $900,000 67% 68,500
I-90 @ I-94 Interchange ("Edens Interchange") Chicago-Northwestern IN 90 6 189,700 8.3 11,900 6% 596,300 4,200 35% 211,100 1,697,300 $1,926,000 53% 111,900
I-10 @ U.S. 17A Interchange Jacksonville 10 4 141,500 8.3 11,800 8% 595,200 1,800 15% 90,500 677,500 $765,000 29% 26,200
I-278 (Staten Island Expwy) before Verrazano Br New York-Northeastern NJ 278 6 204,400 7.3 13,300 7% 593,400 3,900 29% 173,600 1,406,400 $1,586,000 27% 46,900
I-66 @ I-495 (Capitol Beltway) Interchange Washington (DC-MD-VA) 66 6 188,500 8.3 11,700 6% 588,500 1,600 14% 80,400 580,700 $645,000 53% 42,600
I-15 @ SR 78 Interchange (Escondido) San Diego 15 8 211,900 6.0 15,500 7% 566,200 4,100 27% 149,300 1,498,900 $1,750,000 16% 23,900
I-64 @ I-264 Interchange Norfolk (036)-Virginia Beach-Newport 64 5 150,000 8.4 11,000 7% 563,700 2,400 22% 122,500 871,100 $967,000 22% 27,000
Centreville Rd @ I-66 Washington (DC-MD-VA) 66 6 196,000 8.3 11,200 6% 563,500 1,600 14% 80,400 580,700 $645,000 53% 42,600
I-12 @ Amite River, Baton Rouge Baton Rouge 12 4 105,000 6.4 14,400 14% 561,900 8,100 57% 317,200 2,980,000 $3,383,000 68% 215,700
I-95 @ Chestnut St. Philadelphia (PA-NJ) 95 6 177,000 4.7 19,600 11% 553,900 5,000 26% 141,500 1,905,000 $2,141,000 26% 36,800
I-91 @ U.S. 1 Interchange New Haven (064)-Meriden (212) 91 3 97,400 7.0 12,900 13% 550,100 4,200 33% 179,600 1,550,900 $1,741,000 35% 62,900
I-275 @ I-4 Interchange ("Malfunction Junction") Tampa (059)-St. Petersburg(057)-Clearwater 275 6 210,100 7.7 11,500 5% 540,500 2,500 22% 117,600 941,000 $1,062,000 38% 44,700
I-15 @ I-215 Interchange Salt Lake City 15 6 187,400 8.3 10,600 6% 535,100 4,800 45% 241,300 1,744,700 $1,985,000 59% 142,400
I-96 @ Jct I-275 Detroit 96 8 202,000 9.9 8,700 4% 527,200 2,500 29% 150,900 907,600 $1,020,000 32% 48,300
I-678 @ SR 27 Interchange (JFK) New York-Northeastern NJ 678 4 140,900 8.3 10,500 7% 526,300 3,100 29% 155,800 1,117,900 $1,260,000 27% 42,100
I-95 Between I-895 and SR 43 Baltimore 95 8 194,200 4.4 19,800 10% 525,100 4,400 22% 116,900 1,614,400 $1,794,000 49% 57,300
I-355 @ I-55 Chicago-Northwestern IN 355 3 91,100 4.5 19,100 21% 523,100 6,700 35% 183,800 2,707,700 $3,072,000 53% 97,400
SR 400 @ I-285 Interchange Atlanta 400 6 223,600 3.3 25,700 11% 514,800 7,400 29% 148,300 2,792,800 $3,095,000 52% 77,100
U.S. 75 @ Lemmon Ave. Dallas-Fort Worth 75 6 194,400 8.3 10,200 5% 511,600 2,700 26% 135,700 994,200 $1,149,000 54% 73,300
Garden State Parkway @ I-78 New York-Northeastern NJ GSPW 6 201,500 7.9 10,600 5% 509,800 3,100 29% 148,400 1,132,300 $1,266,000 27% 40,100
I-494 @ I-35W Interchange Minneapolis-St. Paul 494 6 160,800 6.0 14,000 9% 508,800 4,600 33% 167,500 1,708,800 $1,951,000 58% 97,200
I-95 @ Golden Glades Interchange Miami-Hialeah 95 6 187,100 3.6 23,600 13% 508,800 4,600 20% 99,400 1,731,400 $1,954,000 50% 49,700
I-10 @ I-610 Interchange New Orleans 10 5 159,500 6.1 13,600 9% 508,700 2,800 21% 104,500 1,030,100 $1,169,000 39% 40,800
I-95 @ U.S. 7 Interchange Bridgeport-Milford 95 6 151,900 5.2 15,900 10% 506,000 5,100 32% 162,500 1,883,200 $2,114,000 30% 48,800
I-275 Between I-74 and SR 126 Cincinnati (OH-KY) 275 4 117,700 8.0 10,400 9% 504,700 3,700 36% 180,200 1,466,700 $1,632,000 63% 113,500
I-84 @ U.S. 30 Interchange Portland-Vancouver (OR-WA) 84 6 184,300 8.3 10,000 5% 503,500 3,400 34% 170,900 1,231,200 $1,423,000 33% 56,400
I-83 @ I-695 Interchange Baltimore SL1 5 159,300 5.7 14,300 9% 496,400 3,100 22% 107,200 1,137,400 $1,264,000 49% 52,500
I-205 @ Powell Blvd Portland-Vancouver (OR-WA) 205 6 175,700 7.7 10,500 6% 496,200 3,500 34% 164,700 1,267,400 $1,465,000 33% 54,400
I-495 (Long Island Expwy) @ Exit 33 New York-Northeastern NJ 495 6 211,500 7.7 10,400 5% 491,600 3,000 29% 141,200 1,081,800 $1,220,000 27% 38,100
Mission Valley Fwy San Diego 8 9 258,600 8.3 9,700 4% 489,800 2,600 27% 130,700 950,500 $1,110,000 16% 20,900
I-15 between Tropicana and Flamingo Las Vegas 15 6 165,900 6.4 12,400 7% 486,700 6,200 50% 242,800 2,206,000 $2,530,000 90% 218,500
I-695 @ I-70 Interchange Baltimore 695 7 228,700 6.3 12,400 5% 473,100 2,700 22% 103,300 990,600 $1,101,000 49% 50,600
7 Mile Rd @ I-75 Detroit 75 6 179,400 4.9 15,500 9% 467,200 4,400 29% 132,300 1,597,400 $1,795,000 32% 42,300
I-440S @ U.S. 431 Nashville 440 4 115,800 7.7 9,900 9% 465,500 3,900 40% 183,500 1,411,600 $1,590,000 77% 141,300
I-805 @ I-15 Interchange San Diego 805 8 248,200 8.6 8,900 4% 464,500 2,400 27% 126,000 877,400 $1,024,000 16% 20,200
I-95 @ I--87 Interchange New York-Northeastern NJ 95 6 181,600 8.3 9,200 5% 461,800 2,700 29% 135,700 973,700 $1,098,000 27% 36,600
I-280 @ U.S. 1 Interchange San Francisco-Oakland 280 8 230,800 3.6 21,300 9% 460,500 7,000 33% 151,200 2,559,000 $2,987,000 29% 43,800
I-5 NB @ SR 526 in Everett Seattle 5 6 153,500 6.0 12,600 8% 457,200 3,000 24% 109,300 1,100,000 $1,243,000 15% 16,400
I-95 @ I-195 Interchange Providence-Pawtucket (RI-MA) 95 8 267,200 6.7 11,100 4% 455,300 600 5% 24,600 224,300 $255,000 28% 6,900
I-45 @ I-610 Interchange Houston 45 8 277,700 7.5 10,000 4% 452,300 4,000 40% 181,500 1,472,800 $1,703,000 44% 79,900
I-10 @ I-17 Interchange West (the "Stack") Phoenix 10 8 239,000 4.7 15,800 7% 448,000 4,900 31% 138,700 1,811,200 $2,064,000 48% 66,600
I-10 (Santa Monica Fwy) @ I-5 Interchange Los Angeles 10 10 323,000 5.8 12,500 4% 445,500 4,000 32% 142,000 1,462,300 $1,707,000 31% 44,000
I-95 @ SR 9A (Westside Hwy) New York-Northeastern NJ 95 9 310,300 7.2 10,200 3% 445,200 3,000 29% 130,900 1,081,800 $1,220,000 27% 35,300
U.S. 60 (Superstition Fwy): Loop-101 to I-10 Phoenix 60 6 174,100 2.9 24,600 14% 439,000 7,700 31% 137,200 2,846,200 $3,244,000 48% 65,900
I-77 @ SR 8 Interchange Akron 77 4 130,900 8.3 8,700 7% 438,000 4,400 50% 221,200 1,744,200 $1,941,000 52% 115,000
I-95 @ I-476 Interchange Philadelphia (PA-NJ) 95 5 153,400 5.1 14,100 9% 437,200 3,600 26% 111,500 1,371,600 $1,541,000 26% 29,000
I-70 @ I-435 Interchange Kansas City (MO-KS) 70 4 116,700 8.3 8,600 7% 433,300 4,600 54% 231,200 1,703,500 $1,933,000 64% 148,000
I-84 @ SR 2 Interchange ("Mixmaster East") Hartford-Middletown 84 5 123,800 6.7 10,600 9% 433,000 2,500 24% 102,400 923,200 $1,036,000 66% 67,600
Harding Pl @ I-24 Nashville 24 4 138,300 7.6 9,300 7% 431,200 3,700 40% 171,000 1,339,200 $1,508,000 77% 131,700
Florida Turnpike @ I-595 Miami-Hialeah 595 6 187,400 8.3 8,500 5% 426,100 1,700 20% 85,500 639,900 $722,000 50% 42,800
I-278 (BQE) @ I-495 Interchange New York-Northeastern NJ 278 6 209,800 7.6 9,100 4% 422,500 2,600 29% 120,200 937,600 $1,057,000 27% 32,500
I-696 @ Jct I-75 Detroit 696 8 222,800 6.6 10,500 5% 418,900 3,000 29% 120,200 1,089,100 $1,224,000 32% 38,500
I-10 @ I-410 Loop North Interchange San Antonio 10 5 166,400 6.7 10,200 6% 418,300 1,800 18% 73,700 662,800 $766,000 41% 30,200
I-55 from Naperville to Weber Chicago-Northwestern IN 55 4 108,600 7.0 9,500 9% 405,900 3,300 35% 141,100 1,333,600 $1,513,000 53% 74,800
I-15 @I-215 Interchange (the "Fishbowl") Las Vegas 15 6 165,600 6.6 10,100 6% 403,200 5,000 50% 200,300 1,779,100 $2,041,000 90% 180,300
I-580 MP 17-19 San Francisco-Oakland 580 8 197,300 4.4 15,000 8% 398,300 4,900 33% 130,200 1,791,300 $2,091,000 29% 37,800
I-495 (Long Island Expwy) @ Grand Ave. New York-Northeastern NJ 495 7 232,600 6.3 10,200 4% 390,600 3,000 29% 114,700 1,081,800 $1,220,000 27% 31,000
I-5 @ I-90 Interchange Seattle 5 10 313,800 5.2 12,200 4% 387,300 2,900 24% 92,400 1,063,300 $1,201,000 15% 13,900
I-45 (Gulf Fwy) @ U.S. 59 Interchange Houston 45 8 260,800 6.0 10,600 4% 386,900 4,200 40% 153,000 1,546,500 $1,788,000 44% 67,300
I-75 @ I-280 Interchange Toledo (OH-MI) 75 3 90,700 4.0 16,000 18% 384,200 6,000 38% 144,200 2,378,400 $2,647,000 40% 57,700
I-80 @ I-294 Interchange Chicago-Northwestern IN 80 6 137,600 3.8 16,400 12% 380,700 5,700 35% 132,300 2,303,500 $2,614,000 53% 70,100
I-64 @ I-65/I-71 Interchange ("Spaghetti Junction") Louisville (KY-IN) 64 4 123,500 8.3 7,500 6% 375,900 2,500 33% 125,700 921,400 $1,027,000 69% 86,700
I-475 - 9.63-14.66 Toledo (OH-MI) 475 4 102,900 5.5 11,000 11% 371,800 4,100 38% 138,100 1,625,300 $1,809,000 40% 55,200
I-287 @ SR 24 New York-Northeastern NJ 287 3 102,800 7.2 8,500 8% 370,100 2,500 29% 109,100 913,100 $1,021,000 27% 29,500
I-95 - Woodrow Wilson Bridge Washington (DC-MD-VA) 95 7 205,400 4.8 12,500 6% 364,100 1,800 14% 52,500 653,300 $725,000 53% 27,800
I-238 @ I-550 San Francisco-Oakland 238 4 121,000 5.1 11,700 10% 363,600 3,800 33% 117,700 1,389,200 $1,622,000 29% 34,100
I-75 @ Jct M-8 Detroit 75 8 193,500 3.8 15,500 8% 360,500 4,400 29% 102,100 1,597,400 $1,795,000 32% 32,700
I-590 @ I-490/SR 590 Interchange "Can of Worms") Rochester 590 4 114,300 8.3 7,000 6% 352,800 1,700 24% 85,500 613,000 $691,000 20% 17,100
U.S. 45 @ I-94/I-894 Interchange (the "Zoo") Milwaukee 45 4 149,000 4.5 12,700 9% 347,300 4,900 39% 134,400 1,792,200 $2,007,000 33% 44,400
I-85 @ SR 7 Gastonia 85 4 115,700 7.7 7,400 6% 346,500 3,700 51% 174,100 1,368,600 $1,512,000 43% 74,900
I-35 @ Loop 410 Interchange San Antonio 35 6 170,200 3.8 14,600 9% 338,600 2,600 18% 60,300 957,300 $1,107,000 41% 24,700
SR 99 @ Stockton Blvd Sacramento 99 6 179,600 2.8 19,500 11% 333,900 8,600 44% 147,100 3,144,000 $3,670,000 63% 92,700
I-494 @ I-394 Interchange Minneapolis-St. Paul 494 4 100,500 6.6 8,200 8% 329,500 2,700 33% 108,200 1,003,000 $1,145,000 58% 62,800
Loop-101 Agua Fria: 67th Ave to I-17 Phoenix 101 4 113,400 4.1 13,200 12% 329,000 4,100 31% 102,000 1,515,500 $1,727,000 48% 49,000
Loop-101 Agua Fria: 67th Ave to I-17 Phoenix 101 4 113,400 4.1 13,200 12% 329,000 4,100 31% 102,000 1,515,500 $1,727,000 48% 49,000
U.S. 59 @ SR 6 Interchange Houston 59 4 154,000 4.7 11,600 8% 328,600 4,600 40% 130,200 1,693,800 $1,958,000 44% 57,300
I-405 in Downtown Bellevue Seattle 405 8 209,200 8.9 6,000 3% 324,700 1,400 24% 75,400 513,300 $580,000 15% 11,300
SR 288 @ U.S. 59 Houston 288 5 163,800 6.3 8,100 5% 309,200 3,200 40% 122,400 1,178,300 $1,362,000 44% 53,900
FDR Drive south of Triborough Bridge New York-Northeastern NJ 907 6 170,000 3.7 13,700 8% 307,400 4,000 29% 89,600 1,442,500 $1,626,000 27% 24,200
U.S. 202 @ U.S. 422 Philadelphia (PA-NJ) 202 4 123,400 5.2 9,500 8% 301,300 2,400 26% 76,500 914,400 $1,027,000 26% 19,900
I-75 @ I-696 Interchange Detroit 75 6 184,500 3.2 15,600 8% 300,600 4,500 29% 86,800 1,633,700 $1,836,000 32% 27,800
I-80 @ Garden State Pkwy New York-Northeastern NJ 80 4 125,700 5.5 8,700 7% 293,600 2,500 29% 84,200 913,100 $1,021,000 27% 22,700
I-95 @ Route 4 Interchange Providence-Pawtucket RI-MA) 95 8 181,100 2.9 16,400 9% 292,300 900 5% 16,000 336,500 $383,000 28% 4,500
Northern State Parkway @ Exit 36A New York-Northeastern NJ 908 4 116,500 4.4 10,900 9% 288,900 3,200 29% 85,000 1,154,000 $1,301,000 27% 23,000
I-271 @ I-480 Interchange Cleveland 271 5 144,600 7.5 6,300 4% 286,900 3,100 49% 140,600 1,228,900 $1,368,000 49% 68,900
I-15 @ I-80 Interchange Salt Lake City 15 6 203,400 7.7 6,000 3% 283,100 2,700 45% 127,100 981,400 $1,116,000 59% 75,000
I-480 Between SR 10 and SR 17 Cleveland 480 4 105,700 5.5 8,300 8% 279,800 4,100 49% 138,100 1,625,300 $1,809,000 49% 67,700
I-76 @ Walnut La Philadelphia (PA-NJ) 76 4 129,800 2.7 17,000 13% 278,500 4,300 26% 70,500 1,638,300 $1,841,000 26% 18,300
I-64 @ I-264 Interchange Washington (DC-MD-VA) 64 5 145,200 4.1 11,000 8% 274,700 1,500 14% 37,300 544,400 $604,000 53% 19,800
I-90 @ I-87 Interchange Albany-Schenectady-Troy 90 4 118,200 7.9 5,600 5% 269,300 3,000 53% 143,700 1,081,800 $1,220,000 23% 33,100
SR 183 @ SR 360 Dallas-Fort Worth 360 4 151,000 8.3 5,300 4% 268,900 1,400 26% 70,400 515,500 $596,000 54% 38,000
I-35W @ SH 121 Interchange Dallas-Fort Worth 35 4 106,300 5.8 7,500 7% 267,100 2,000 26% 71,000 736,400 $851,000 54% 38,300
M 39 @ M 5 Interchange Detroit 39 6 184,500 8.3 5,300 3% 264,800 1,500 29% 75,400 544,600 $612,000 32% 24,100
I-4 @ SR 408 Interchange (East/West toll)Orlando 4 6 190,600 9.0 4,900 3% 264,500 1,700 34% 92,700 639,900 $722,000 20% 18,500
I-880 @ SR 237 Interchange San Jose 880 6 192,000 3.7 11,700 6% 262,700 2,600 23% 58,200 950,500 $1,110,000 16% 9,300
I-64 @ I-95 Interchange Richmond 64 3 101,500 7.0 5,900 6% 254,000 2,900 48% 124,000 1,052,600 $1,168,000 40% 49,600
SR 562 @ I-75 Interchange Cincinnati (OH-KY) 562 2 71,900 8.3 4,900 7% 244,900 1,800 36% 90,500 713,500 $794,000 63% 57,000
I-10 @ I-110/U.S. 54 Interchange El Paso (TX-NM) 10 7 209,600 4.4 9,100 4% 241,800 2,100 23% 55,800 773,200 $894,000 97% 54,100
SR 4 @ Willow Pass Rd Antioch-Pittsburgh 4 4 129,400 6.3 6,300 5% 241,200 2,200 35% 84,100 804,300 $939,000 39% 32,800
I-95 @ SR 3 New York-Northeastern NJ 95 10 305,400 2.3 17,100 6% 235,800 5,000 29% 68,900 1,826,200 $2,042,000 27% 18,600
I-35 @ Loop 410 Interchange San Antonio 35 6 167,800 3.0 12,700 8% 235,300 2,200 18% 40,800 810,100 $937,000 41% 16,700
M 39 @ Jct M-5 Detroit 39 6 184,300 8.4 4,500 2% 230,900 1,300 29% 66,300 472,000 $530,000 32% 21,200
I-94 @ I-35E Interchange ("Spaghetti Bowl") Minneapolis-St. Paul 94 6 166,300 3.3 11,500 7% 230,300 3,700 33% 74,200 1,374,500 $1,569,000 58% 43,000
I-71 @ I-75 Interchange Cincinnati (OH-KY) 71 4 139,000 3.6 10,600 8% 229,900 3,800 36% 82,100 1,506,300 $1,676,000 63% 51,700
Sunset Highway @ Murray Blvd Portland-Vancouver (OR-WA) 26 4 125,400 3.4 11,000 9% 229,600 3,700 34% 77,000 1,339,800 $1,549,000 33% 25,400
Roosevelt Rd @ I-355 Chicago-Northwestern IN 355 4 130,500 8.3 4,600 4% 229,100 1,600 35% 80,400 646,600 $734,000 53% 42,600
SR 80 @ U.S. 101 Interchange San Francisco-Oakland 80 8 227,400 2.7 13,900 6% 228,800 4,600 33% 75,500 1,681,700 $1,963,000 29% 21,900
SR 1 @ SR 17 Interchange Santa Cruz 1 4 114,700 7.2 5,100 4% 221,000 1,100 23% 48,000 402,100 $469,000 16% 7,700
I-94 @ I-35W Interchange Minneapolis-St. Paul 94 6 165,400 3.2 11,300 7% 217,700 3,700 33% 71,400 1,374,500 $1,569,000 58% 41,400
I-35E @ I-30 Interchange ("Mixmaster") Dallas-Fort Worth 35 6 190,000 5.4 6,600 3% 217,100 1,700 26% 55,700 626,000 $724,000 54% 30,100
Balt/Wash Pkwy: I-495/I-95 to Powder Mill Rd Washington (DC-MD-VA) 295 4 110,400 8.3 4,200 4% 211,000 600 14% 30,200 220,100 $245,000 53% 16,000
I-664 @ U.S. 13 Interchange Norfolk Virginia Beach-Newport News 664 4 130,800 6.0 5,400 4% 196,900 1,200 22% 43,700 435,600 $483,000 22% 9,600
I-225 @ U.S. 87 Interchange Denver 225 4 117,000 3.3 9,700 8% 193,700 1,600 17% 32,100 606,300 $686,000 67% 21,500
I-376 @ Centreville Rd Pittsburgh 376 4 116,100 3.3 9,500 8% 189,800 3,300 35% 66,100 1,257,300 $1,413,000 39% 25,800
I-55 @ I-294 Interchange Chicago-Northwestern IN 55 6 173,400 8.3 3,600 2% 180,100 1,300 35% 65,300 525,400 $596,000 53% 34,600
Balt/Wash Pkwy @ I-495/I-95 Interchange Washington (DC-MD-VA) 295 4 111,700 7.2 4,100 4% 178,900 600 14% 26,200 220,100 $245,000 53% 13,900
U.S. 50 @ I-75 Interchange Cincinnati (OH-KY) 50 3 93,800 3.7 7,900 8% 177,300 2,800 36% 62,700 1,109,900 $1,235,000 63% 39,500
U.S. 169 @ I-394 Interchange Minneapolis-St. Paul 169 4 106,200 5.5 5,300 5% 177,100 1,700 33% 57,300 631,500 $721,000 58% 33,200
SR 121 @ I-820 Dallas-Fort Worth 820 5 160,300 5.5 5,200 3% 174,500 1,400 26% 47,200 515,500 $596,000 54% 25,500
I-680 @ U.S. 13 San Francisco-Oakland 680 6 177,300 2.5 10,600 6% 159,500 3,500 33% 52,700 1,279,500 $1,494,000 29% 15,300
I-264 @ Downtown Tunnel Norfolk (036)-Virginia Beach-Newport 264 4 118,800 7.9 3,200 3% 152,100 700 22% 33,500 254,100 $282,000 22% 7,400
I-35E @ TH 36 Interchange Minneapolis-St. Paul 35 6 144,000 3.6 6,800 5% 146,500 2,200 33% 47,500 817,200 $933,000 58% 27,600
I-95 @ U.S. 90 Interchange Jacksonville 10 5 173,300 7.2 3,300 2% 144,600 500 15% 21,800 188,200 $212,000 29% 6,300
SR 176 between Snow Rd and Broadview Rd Cleveland 176 2 65,400 6.3 3,500 5% 133,700 1,700 49% 65,000 673,900 $750,000 49% 31,900
MOPAC Expy-Capital of Texas Austin SL1 4 129,900 8.3 2,300 2% 115,800 2,000 89% 100,500 736,400 $851,000 39% 39,200
SR 16 @ Sprague Ave Seattle 16 4 121,600 4.5 3,500 3% 95,500 800 24% 21,900 293,300 $331,000 15% 3,300
I-94 W of Marquette Interchange Milwaukee 94 6 161,900 5.5 2,700 2% 92,200 1,100 39% 37,100 402,300 $451,000 33% 12,200
I-80 @I-294 Interchange Chicago-Northwestern IN 80 6 136,900 1.2 12,100 9% 91,700 4,200 35% 31,700 1,697,300 $1,926,000 53% 16,800
SR 400 @ I-285 Interchange Atlanta 400 4 112,400 2.6 5,800 5% 91,700 1,700 29% 26,700 641,600 $711,000 52% 13,900
U.S. 192 @ I-4 Orlando 192 4 114,200 1.4 10,300 9% 86,800 3,500 34% 29,500 1,317,400 $1,487,000 20% 5,900
I-277 @ I-77 Interchange Akron 277 2 60,200 4.5 3,000 5% 82,300 1,500 50% 41,100 594,600 $662,000 52% 21,400
I-475 @ Monroe St. Toledo (OH-MI) 475 3 116,600 1.2 10,200 9% 76,900 3,800 38% 28,700 1,506,300 $1,676,000 40% 11,500
SR 520 Floating Bridge Seattle 520 4 104,500 6.9 1,800 2% 76,200 400 24% 16,700 146,700 $166,000 15% 2,500
I-195 @ SR 76 Interchange Richmond 195 3 92,400 3.0 3,900 4% 72,400 1,900 48% 35,200 689,600 $765,000 40% 14,100
I-75, from Ohio River Bridge to I-71 Interchange Cincinnati (OH-KY) 75 4 141,600 0.8 14,900 11% 70,900 5,300 36% 25,300 2,100,900 $2,338,000 63% 15,900
U.S. 1 @ Chippenham Pkwy Richmond 150 2 56,000 3.3 3,500 6% 69,700 1,700 48% 34,100 617,000 $685,000 40% 13,600
I-394 @ TH 100 Interchange Minneapolis-St. Paul 394 6 152,900 2.0 5,300 3% 64,000 1,700 33% 20,400 631,500 $721,000 58% 11,800
Loop 410 @U.S. 281 Interchange San Antonio 410 6 174,700 3.7 2,800 2% 62,400 500 18% 11,200 184,100 $213,000 41% 4,600
I-290 (Eisenhower Expwy) Between Exits 17b and 23a Chicago-Northwestern IN 290 6 202,500 6.4 1,500 0.7% 59,400 500 35% 19,600 202,100 $229,000 53% 10,400
SR 100 @ I-394 Interchange Minneapolis-St. Paul 100 4 104,500 1.2 6,800 7% 48,900 2,200 33% 15,700 817,200 $933,000 58% 9,100
I-43 N. of Marquette Interchange Milwaukee 43 6 146,100 1.5 4,800 3% 42,400 1,900 39% 16,900 694,900 $778,000 33% 5,600
I-96 @ I-275 Interchange Detroit 96 8 201,600 8.3 700 0.3% 35,100 200 29% 10,100 72,600 $82,000 32% 3,200
I-66 @ U.S. 29 Interchange (E. Falls Church) Washington (DC-MD-VA) 66 4 118,400 7.5 800 0.7% 34,500 100 14% 4,500 36,300 $40,000 53% 2,400
U.S. 10 @ U.S. 441 Interchange Appleton-Neenah 10 2 62,100 4.8 900 1.4% 26,000 200 23% 5,800 73,200 $82,000 66% 3,800
I-64 (Hampton Roads Tunnel ) Norfolk (036)-Virginia Beach-Newport 64 4 98,500 0.5 7,500 8% 22,200 1,600 22% 4,700 580,700 $645,000 22% 1,000
U.S. 75 to SR 190 F Dallas-Fort Worth 75 8 249,100 4.8 700 0% 21,100 200 26% 5,800 73,600 $85,000 54% 3,100
SR 16 @ SR 3 Bremerton 16 2 65,900 1.0 3,500 5% 21,000 800 24% 4,800 293,300 $331,000 15% 700
SR 146 @ La Porte Fwy Houston 146 2 68,400 6.7 500 0.7% 19,400 200 40% 8,200 73,600 $85,000 44% 3,600
Woodland Ave @ I-77 Cleveland 77 2 75,100 0.2 13,500 18% 17,500 6,600 49% 8,600 2,616,300 $2,911,000 49% 4,200
I-635 @ N. Dallas Tollway Dallas-Fort Worth 635 8 272,400 6.6 100 0.04% 4,300 30 26% 1,200 11,000 $13,000 54% 600

Table A.6 The Worst Physical Bottlenecks in the United States, 2002
American Highway Users Alliance Study
Rank City Freeway Location Annual Hours
of Delay
(Hours in Thousands)
1Los AngelesU.S. 101U.S. 101 (Ventura Freeway) at I-405 Interchange 27,144
2HoustonI-610I-610 at I-10 Interchange (West)25,181
3ChicagoI-90I-90/94 at I-290 Interchange ("Circle Interchange")25,068
4PhoenixI-10I-10 at SR 51/SR 202 Interchange ("Mini-Stack")22,805
5Los Angeles I-405I-405 (San Diego Freeway) at I-10 Interchange22,792
6Atlanta I-75I-75 south of the I-85 Interchange 21,045
7Washington (DC-Maryland-Virginia)I-495I-495 at I-270 Interchange 19,429
8Los Angeles I-10I-10 (Santa Monica Freeway) at I-5 Interchange18,606
9Los Angeles I-405I-405 (San Diego Freeway) at I-605 Interchange18,606
10Atlanta I-285I-285 at I-85 Interchange ("Spaghetti Junction") 17,072
11ChicagoI-94I-94 (Dan Ryan Expressway) at I-90 Skyway Split (Southside) 16,713
12PhoenixI-17I-17 (Black Canyon Freeway) at I-10 Interchange (the "Stack") to Cactus Road16,310
13Los AngelesI-5I-5 (Santa Ana Freeway) at SR 22/SR 57 Interchange ("Orange Crush")16,304
14ProvidenceI-95I-95 at I-195 Interchange15,340
15Washington (DC-Maryland-Virginia)I-495I-495 at I-95 Interchange15,035
16TampaI-275I-275 at I-4 Interchange ("Malfunction Junction")14,371
17AtlantaI-285I-285 at I-75 Interchange 14,333
18SeattleI-5I-5 at I-90 Interchange14,306
19ChicagoI-290I-290 (Eisenhower Expressway) Between Exits 17b and 23a 14,009
20HoustonI-45I-45 (Gulf Freeway) at U.S. 59 Interchange13,944
21San JoseU.S. 101U.S. 101 at I-880 Interchange12,249
22Las VegasU.S. 95U.S. 95 west of the I-15 Interchange ("Spaghetti Bowl")11,152
23San DiegoI-805I-805 at I-15 Interchange10,992
24CincinnatiI-75I-75, from Ohio River Bridge to I-71 Interchange10,088
Source: Unclogging America's Arteries: Effective Relief for Highway Bottlenecks, American Highway Users Alliance, February 2004. Delay is the extra time it would take to travel through the bottlenecks compared to completely uncongested conditions. The report did not consider many severe bottlenecks from the New York City area. As most travelers know, congestion in and around the boroughs of New York can be significant. However, a very large amount of delay in the New York area is related to bridge and tunnel crossings into Manhattan, most of which are toll facilities. Also, while the New York metropolitan area is laced with Interstates, parkways, and expressways, they seldom reach the proportions seen in other major areas, except where multiple highways converge on bridge of tunnel crossings. (A typical lane configuration for a New York area freeway is six lanes, three in each direction. But there are many of these.) Toll facilities were excluded from the study because toll facilities are fundamentally different from other physical bottlenecks (such as freeway-to-freeway interchanges) that are prevalent around the country. Delay comparisons between toll facilities and other types of bottlenecks might not be consistent since different modeling techniques would be used. If objective field measurements of delay could be made at all locations around the country, several river crossings into Manhattan would no doubt be included in a list of the nation's worst bottlenecks.