Figure 3-3. Modal Split
Modal Split - Volume
| Air | 0% |
| Highway | 72% |
| Other | 2% |
| Rail | 16% |
| Water | 10% |
| Volume (Million Tons) Within corridor |
Volume (Million Tons) Out of corridor |
Volume (Million Tons) Into corridor |
|
|---|---|---|---|
| Air | 1 | 2 | 2 |
| Highway | 3,153 | 406 | 457 |
| Other | 98 | 1 | 10 |
| Rail | 325 | 216 | 371 |
| Water | 315 | 116 | 124 |
Modal Split - Value
| Air | 10% |
| Highway | 79% |
| Other | 0% |
| Rail | 10% |
| Water | 1% |
| Value ($bil) Within corridor |
Value ($bil) Out of corridor |
Value ($bil) Into corridor |
|
|---|---|---|---|
| Air | 99 | 126 | 143 |
| Highway | 1,773 | 611 | 669 |
| Other | 13 | 0 | 1 |
| Rail | 127 | 144 | 111 |
| Water | 27 | 13 | 16 |