Figure 2 - Williamsburg Bridge
Return to report

Construction commenced - November 7, 1896 Construction of cables began - August 11, 1901 Opened to traffic - December 19, 1903 Total length - 7308 feet Length of main span - 1600 feet Length of each of the four cables - 2985 feet
Diameter of each cable 18-6/10 inches Total number of wires in each cable - 7696 Total length of wire in the four cables - 17,404 miles The clear height over river channel is 135 ft above mean high water Height of steel towers 332 ft 9 in. above mean high water Total weight of steel and iron in bridge & approaches - 47,800 tons
Cost of construction - $15,091,497.08 Cost of land - $9,096,583.67 Total cost - $24,188,090.75
|