| STATE | Project | Amount of Grant |
|---|---|---|
Alabama |
Elimination of hazards along Gulf Coast High Speed Rail Corridor between Birmingham, Ala., and New Orleans, La.; close one crossing in Lincoln and construct access road. |
$226,250 |
Arkansas |
Elimination of hazards along the South Central High Speed Rail Corridor between Little Rock, Ark., and San Antonio, Texas; install active protection at one crossing in Gurdon. |
$226,250 |
California |
Elimination of hazards along the California High Speed Rail Corridor between Oakland, Calif, and Stockton, Calif.; complete construction of one grade separation and close two adjacent crossings. |
$501,059 |
Florida |
Elimination of hazards along the Florida High Speed Rail Corridor between Tampa, Fla., Orlando, Fla., and Miami, Fla.; upgrade protection at 5 high-volume train/vehicle crossings |
$1,289,625 |
Illinois |
Elimination of hazards along the Chicago-Hub High Speed Rail Network Corridor between St. Louis, Mo., and Chicago, Ill.; upgrade circuitry at 16 crossings in Springfield to increase speeds from 25 mph to 40 mph. |
$452,500 |
Louisiana |
Elimination of hazards along the Gulf Coast High Speed Rail Corridor between New Orleans, La., and Houston, Texas; upgrade protection at 3 crossings and close 2 crossings in Reserve, LA; and upgrade 2 crossings in LaPlace, LA, and one crossing in St. Rose, LA. |
$868,800 |
Michigan |
Elimination of hazards along the Chicago-Hub High Speed Rail Network Corridor between Pontiac/Detroit, Mich., and Chicago, Ill.; closure of 2-3 crossings. |
$740,290 |
Minnesota |
Elimination of hazards along the Chicago-Hub High Speed Rail Network Corridor between Minneapolis/St. Paul, Minn., and Chicago, Ill.; upgrade protection and reconfigure rail at one crossing in Winona. |
$1,267,000 |
Missouri |
Elimination of hazards along the Chicago-Hub High Speed Rail Network Corridor between Kansas City, Mo., and St. Louis, Mo.; upgrade protection and roadway at one crossing in Kingsville. |
$226,250 |
Mississippi |
Elimination of hazards along the Gulf Coast High Speed Rail Corridor between Mobile, Ala., and New Orleans, La.; upgrade protection at two crossings in Pass Christian, Ms. |
$271,500 |
New York |
Elimination of hazards along the Empire High Speed Rail Corridor between Albany, N.Y., and New York City, N.Y.; install protection at Hook Boat Club on 110 mph Empire Line. |
$316,750 |
North Carolina |
Elimination of hazards along the Southeast High Speed Rail (SEHSR) Corridor between Richmond, Va., and Raleigh, N.C.; study and preliminary engineering for grade crossing elimination or improvements on the SEHSR Corridor. |
$905,000 |
Ohio |
Elimination of hazards along the Chicago-Hub High Speed Network Corridor between Cleveland, Ohio, and Chicago, Ill.; upgrade circuitry at two high-volume crossings in Bryan and Wauseon. |
$524,900 |
South Carolina |
Update of the grade crossing inventory for the State of South Carolina. |
$ 67,875 |
Texas |
Elimination of hazards along the South Central High Speed Rail Corridor between Fort Worth, Texas, and Little Rock, Ark.; complete closure of one crossing in Terrell, Texas. |
$ 18,100 |
Elimination of hazards along the Gulf Coast High Speed Rail Corridor between Houston, Texas, and New Orleans, La.; upgrade one crossing and close two crossings in Houston, Texas. |
535,760 |
|
Washington |
Elimination of hazards along the Pacific Northwest High Speed Rail Corridor between Eugene, Ore., and Vancouver, B.C., via Seattle, Wash.; preliminary engineering for one grade separation project in Tacoma, Wash. |
$452,500 |
Wisconsin |
Elimination of hazards along the Chicago-Hub High Speed Rail Network Corridor between Milwaukee, Wis., and Madison, Wis.; install conduit at 5 crossings between Madison, Wisc., and Milwaukee, Wisc., for future signal equipment. |
$316,750 |