| Alabama |
Yes
Index: Platt's Oilgram
Trigger value: any change
Web reference:
Comments: fuel & AC PAC started in 3/2000
|
Yes
Index: ADOT Index
Trigger value: any change
Web reference:
Comments: fuel & AC PAC started in 3/2000
|
None |
None |
None |
None |
|
State contact:
Title:
Phone:
Email: |
|
| Alaska |
None |
Yes
Index:
Trigger value: 7.5%
Reference: SS 401-5.02 (5/1/2007);
http://www.dot.state.ak.us/stwddes/dcspubs/assets/pdf/directives/attach/std_mods_a_41007.pdf
Comments: |
none |
none |
none |
none |
none |
State contact:
Title:
Phone:
Email: |
|
| Arizona |
Yes
Index: ADOT
Trigger value: 15%
Web reference: http://www.azdot.gov/Highways/CNS/bitmat.asp
Comments: for diesel fuel |
Yes
Index: ADOT
Trigger value: 15%
Web reference: http://www.azdot.gov/Highways/CNS/bitmat.asp
Comments: for bituminous material |
none |
none |
none |
none |
none |
State contact:
Title:
Phone:
Email: |
|
| Arkansas |
none |
none |
none |
none |
none |
none |
none at this time; |
State contact:
Title:
Phone:
Email: |
|
| California |
none |
Yes
Index: California Paving Asphalt Price Index
Trigger value:
Web reference: http://www.dot.ca.gov/hq/esc/oe/asphalt_index/astable.html.
Comments: It is used on all contracts that have paving asphalt. Restrictions on working days and tonnes of paving asphalt were removed effective 9/22/05. |
none |
none |
none |
none |
none at this time; working on developing a fuel PAC |
State contact: Jim Cotey
Title:
Phone:
Email: |
|
| Colorado |
Yes
Index:
Trigger value:
Web reference:
Comments: Yes - 3/31/2006 |
None |
None |
None |
None |
None |
|
State contact:
Title:
Phone:
Email: |
|
| Connecticut |
yes ???
Index:
Trigger value: 5%
Web reference:
Comments: There will be two items, one for "Fuel" limited to 1.5% of the contract value to be bid and the other "Fuel Adjustment Cost" with a 5% change in the price of diesel as the trigger. The adjustment will be proportional to bid price for "Fuel". These items will be tried on a few projects. |
Yes
Index:
Trigger value: 5%
Web reference:
Comments: Ongoing for active projects |
Yes
Index: no index
Trigger value:
Web reference:
Comments: started 6/2004. Applicable only for "Structural Steel" items with a minimum 50,000 lbs as the threshhold. Ongoing on active projects. No index is used. Material is paid as a separate item based on special provisions. Net weights are required to be shown on shop drawings. |
No retroactive adjustment. |
Yes
Index: average of the quotes for Portland Cement for NY and Boston listed on the ENR website
Trigger value: 5%
Web reference:
Comments: A new Cement Cost Adjustment specification for concrete items will be tried on a few projects. . |
A new Reinforcing Steel Cost Adjustment specification for rebar items will be tried on a few projects with five percent change in the price quotes as the trigger. The index will be similar to that of Cement for the price quotes for Reinforcing Bars (Grade 60, # 4). |
|
State contact Ravi Chandran
Title:
Phone:(860) 594-2666
Email: |
|
| Delaware |
Yes
Index: ??? monthly price index
Trigger value: 5%
Web reference:
Comments: High Sulfur No. 2 Diesel Fuel, specific work items only, usage factors for category of work item |
Yes
Index: ?? Monthly price index
Trigger value: none
Web reference:
Comments: use only PG 64-22 as the index, apply to projects with minimum quanties of mix |
None |
Certain projects, both state only and Fed-aid. Was only used for a limited time period. Adjustment with State funds only. |
None |
Labor, one project only, effective 4th calendar year and beyond, 10% trigger, based on prevailing wage rates only, includes all subs. |
No opt in or opt out provision |
State contact:
Title:
Phone:
Email: |
|
| District of Columbia |
none |
Yes |
none |
none |
none |
none |
|
State contact:Ardeshir Nafici
Title:
Phone: 202-671-4612
Email: |
State contact:Ardeshir Nafici
Title:
Phone: 202-671-4612
Email: |
| Florida |
Yes
Index: Monthly price indexed at terminals in Florida,
Trigger value: 5%
Web reference: http://www.dot.state.fl.us/specificationsoffice/2004BK/D009.doc.pdf
Comments: |
Yes
Index: Monthly price indexed at terminals in Florida,
Trigger value: 5%
Web reference:
Comments: |
started 3/2004, ended 12/2004, ongoing on active projects, 5% trigger |
State only, started 3/2004, ended 12/2004, ongoing on active projects, 5% trigger |
None |
On selected projects a general contract price adjustment clause based on
the US Department of Labor's PPI
www.dot.state.fl.us/construction/PPI/ProducerPriceIndex.htm
|
Fuel and AC PAC started in 2000; Contractor no option of accepting or rejecting PAC |
State Contact: David Chason
Title: Construction Final Estimates Manager
Phone: 850-414-4171
Email: David.chason@dot.state.fl.us |
|
| Georgia |
Yes
Index:
Trigger value: 10%
Web reference:
Comments: Applies only to projects with a duration of 366 days or more. Based on quantities for Excavation, Graded Aggregate Base, Asphalt, and PCC Pavement. |
Yes
Index:
Trigger value:
Web reference:
Comments: Applies only to projects with a duration of 366 days or more. There is a maximum percentage above the price at letting of 125%. The adjustment takes effect from the letting. |
none |
none |
none |
none |
|
State contact: Gregory T. Mayo, P.E.,
Title: Division Director of Construction
Phone: (404) 656-5207
Email: greg.mayo@dot.state.ga.us ,
|
|
| Hawaii |
None |
5% +/- |
None |
None |
5% +/- |
5% trigger value, general SP for reinforcing, structural, and galvanized steel including prestress/post-tension strands. |
PAC started in March 2000 |
State contact:
Title:
Phone:
Email: |
|
| Idaho |
Yes
Index: Idaho current fuel index is established by the Department each month. The index is based on the price of ultra low sulfur, clear, diesel #2 fuel, as reported in Oil Price Information Services for the first Monday of the month.
Trigger value: 20%
Web reference:
Comments: fueld usage factors for excavation, rock excavation, borrow, base, surface treatments, concrete pavements, concrete, plantmix pavements, piledriving, rotomilling, pilot cars, pipe, guardrail, MSE retaining walls |
Yes
Index: Idaho current asphalt index established by ITD on the first Friday of each month. It is based on the average of the high and low posted selling prices on the first Friday of each December for paving grade asphalt cement furnished by Poten and Partners, Inc. for the Rocky Mountain Wholesale - Rail FOB listing
Trigger value: none
Web reference:
Comments: |
None |
None |
None |
None |
|
State contact: Kevin McCulley
Title:
Phone:
Email: Kevin.McCulley@itd.idaho.gov
|
|
| Illinois |
none |
Yes
Index: Adjustment based on Dept. Index which is based on the price of PG 64-22 from IDOT's approved list of certified sources for PG Asphalt Binders
Trigger value: 5%
Web reference: www.dot.il.gov/desenv/bdespecprov.htm
Comments: Effective 11-2-06. Adjustment is optional for projects with >1200 tons of bit work. |
Yes
Index:
Trigger value: 5%
Web reference:
Comments: Started Jan 21, 2006 Optional, for steel pay items with a contract value greater than $10,000 |
none |
none |
none |
|
State Contact: Roger Driskell
Title:
Phone:
Email: Roger.Driskell@illinois.gov |
|
| Indiana |
none |
none |
none |
none |
none |
none |
|
State contact: Dennis A. Kuchler, PE
Title: State Construction Engineer
Phone: 317-232-5502
Email: |
|
| Iowa |
Yes
Index: CPI of No. 2 High Sulfur Diesel.
Trigger value: $0.15 change from base price
Web reference: http://www.erl.dot.state.ia.us/. Section 2103
Comments: applies only to excavation items. . |
none |
none |
none |
none |
none |
We were advised the "opt in" and "opt out" clause could not be used on Federal Aid projects. The website listed in the spreadsheet is also correct. However, you will have to click on GS-01010 dated April 18, 2006 and then click on Section 2103 to get to the Fuel Adjustment section. |
State contact: John Smythe
Title: State Construction Engineer
Phone:
Email: |
|
| Kansas |
Yes
Index: monthly rack average given for NO2-HS Fuel, St. Louis, reported by AXXIS Petroleum, Inc., Axxis Price Service
Trigger value: Adjustments are made for any change, plus or minus.
Web reference: http://www.ksdot.org/burconsmain/Connections/PriceIndex.asp
Comments: .
|
Yes
Index: Asphalt Material Index (AMI) based on Asphalt Weekly Monitor published by Poten & Partners.
Trigger value:
Web reference: Special Prov. http://www.ksdot.org/burconsmain/specprov/pdf/90p-0295-r01.pdf
http://www.ksdot.org/burconsmain/ppreq/AsphaltPriceIndex.asp
Comments: 5000 Ton minimum to include in contract
|
None |
None |
None |
None |
Kansas does allow bidders the option to accept or decline the fuel adjustment and Asphalt price adjustment clause in their bid proposal. However, once bids are opened, the bidders can not change their choice. |
State contact: Roy Rissky
Title: Chief, Bureau of Construction and Maintenance
Phone: 785-296-3576
Email: RoyR@ksdot.org |
|
| Kentucky |
Yes
Index: OPIS
Trigger value: 5%
Web reference:
Comments: see notes |
Yes
Index: Kentucky Terminal prices
Trigger value: 5%
Web reference:
Comments: see notes |
None |
10% increase not to exceed 50% of bid price; allowed only on active projects bid prior to January 23, 2004 |
None (had a clause in the early 1990's but was seldom used, as price fluctuations were mild) |
|
The fuel and liquid asphalt PACs apply only to contracts with quantities exceeding threshold values for specific items; and one of the following time conditions: A) a calendar date contract for which the NTP was issued in a year other than the specified completion date; B) a working day contract with more than working 75 days; or C) a calendar day contract with more than 180 calendar days. |
State contact:
Title:
Phone:
Email: |
|
| Louisiana |
Yes
Index: index based on the minimum price quotations for unleaded gasoline and No. 2 diesel fuel listed for the New Orleans area in Platt's Oilgram and Price Report
Trigger value: 5%
Web reference:
Comments: adjustments provided for approximately 30 work items; |
Yes
Index: index based on average AC price FOB at terminal or refinery
Trigger value: 5%
Web reference:
Comments: price adjustment clause for asphalt cement (May 2006) optional at bid time; |
None |
None |
None |
None |
|
State contact:
Title:
Phone:
Email: |
|
| Maine |
|
Yes
Index: average N.E. Barge Price, FOB, as listed in the Asphalt Weekly Monitor
Trigger value: 5%
Web reference:
Comments: |
|
|
|
|
|
State contact:
Title:
Phone:
Email: |
|
| Maryland |
Yes
Index: US Department of Energy, EIA Monthly Index
Trigger value: 5%
Web reference:
Comments: On selected projects for diesel fuel ; Total of adjustments capped at 5% of Total Contract amount as bid; Applied to Roadway Excavation, Structure Concrete, HMA, Aggregate Base, and Rigid Concrete Pavement items as specified in the Contract. |
Yes
Index: MDSHA index
Trigger value: 5% and 15% - see notes
Web reference:
Comments: |
None |
|
None |
MD SHA used a price adjustment clause for the ICC design-build contract for precast concrete, steel, asphalt cement, portland cement and fuel. |
The Asphalt Trigger Value is 5% for contracts scheduled to be paved during more than one construction season or with an estimated mix quantity of 10,000 tons or more. For contracts scheduled to be paved within one construction season and having an estimated mix quantity of less than 10,000 tons the adjustment is based on a fluctuation above 15%. |
State contact:
Title:
Phone:
Email: |
|
| Massachusetts |
Yes
Index: MassHighway index;
Trigger value: 10%
Web reference:
Comments: used on contracts > 2 years and $10M |
Yes
Index: MassHighway index;
Trigger value: any change
Web reference:
Comments: used on contracts with >1000 tons of HMA |
None |
|
|
|
|
State contact:
Title:
Phone:
Email: |
|
| Michigan |
None |
None |
None |
|
None |
|
MDOT is not currently utilizing any price adjustment clauses. Escalation clauses were recently explored but are not being pursued at this time. |
State contact: David Pawelec. P.E.
Title: Engineer of Specifications
Phone: 517-322-5669
Email: pawelecd@michigan.gov |
|
| Minnesota |
Yes
Index: Opis Energy Group - Rack Fax,
Trigger value: 25%
Web reference:
Comments: no option |
none - under consideration |
Yes
Index: ENR Index
Trigger value:
Web reference:
Comments: new contracts - no option; |
none |
none |
none |
|
State contact:
Title:
Phone:
Email: |
|
| Mississippi |
Yes
Index: Platt's Oilgram
Trigger value: any change
Web reference:
Comments: |
Yes
Index: Monthly Avg. Quote from AC Suppliers,
Trigger value: any change
Web reference:
Comments: |
None |
None |
None |
None |
|
State contact:
Title:
Phone:
Email: |
|
| Missouri |
Yes
Index: Platts Oilgram Pad 2
Trigger value:
Web reference: SS. 109.14;
Comments: adjustment for Class A Ex.,unclassified Ex, Class C Ex, embankment, bituminous pavement, concrete pavement; ; optional bidding. |
None |
None |
None |
None |
None |
|
State contact:
Title:
Phone:
Email: |
|
| Montana |
Yes
Index: Platt's Oilgram Report
Trigger value: +/- $0.25 per gallon
Web reference: http://www.mdt.mt.gov/other/contract/external/reports/special_provisions.doc#_Toc187113976
Comments: Yes, fuel only, (Special Provision 109-1) |
Yes
Index: Poten & Partners prices for the MT/WY market.
Trigger value: $30/ton
Web reference: http://www.mdt.mt.gov/other/contract/external/reports/special_provisions.doc#_Toc187113976
Comments: Specicial Provision 109-2 |
None |
None |
None |
None |
* spec for fuel (unleaded gas and diesel); SP for burner fuel; no provisions for AC; MDT Spec. 109.11 requires contractor to identify (10 max) items during preconstruction conference. |
State contact: Kevin Christensen
Title: Construction Engineer
Phone: 406-444-6008
Email: kechristensen@mt.gov |
|
| Nebraska |
Yes
Index: Platt's Oilgram Price Report (NDOT S2-1-0801);
Trigger value: 10%
Web reference:
Comments: Fuel adjustment only used on earthwork/excavation items |
None |
Yes
Index: Average of the Consumer Buying Price Indices for Shredded Auto Scrap (Chicago) and No. 1 Heavy Melt (Chicago) published by AMM (NDOT S1-43-0704);
Trigger value:
Web reference:
Comments: Bidder chooses option in contract to have price adjustment or not |
None |
None |
None |
|
State contact:
Title:
Phone:
Email: |
|
| Nevada |
Yes
Index: OPIS
Trigger value: 20%
Web reference:
Comments: |
Yes
Index: OPIS
Trigger value: 25%
Web reference:
Comments: |
Yes
Index: ENR - 20-city avg for Grade 60, #4 Reinforcing Bars and Hot rolled carbon steel plate.
Trigger value: 10%
Web reference:
Comments: |
None |
NONE |
NONE |
Fuel & Steel clauses must be in contract, then requested to enact by contractor. Fuel is retroactive. Steel escalation will only apply from the period of time the unusual price for steel began until the end of the contract. Asphalt Esc is from the beginning of contract to the end. Clauses allow for increase or decrease. BP (Benchmark Price at time of bid opening) |
State contact:
Title:
Phone:
Email: |
|
| New Hampshire |
Yes
Index: NHDOT Index based on terminal price in NH;
Trigger value: 10%
Web reference:
Comments: PAC dated 7-14-04 |
Yes
Index: NHDOT Index based on terminal price in NH;
Trigger value: 10%
Web reference:
Comments: PAC dated 2-24-97 |
none |
none |
none |
None |
no contractor option provided |
State contact:
Title:
Phone:
Email: |
|
| New Jersey |
Yes
Index: NJ North or South Index
Trigger value: 5%
Web reference:
Comments: |
Yes
Index: NJ North or South Index
Trigger value: 5%
Web reference:
Comments: |
None |
Under review if supplier meets financial hardship tests |
N/A |
N/A |
AC and Fuel Clauses in the 2007 Std Spec for adj over $0.01 change in index price but 50% change in index requires approval to continue work |
State contact: Kiran Shelat
Title: Supervising Engineer
Phone: 609 530 2572
Email:Kiran.Shelat@dot.state.nj.us |
|
| New Mexico |
None |
Yes
Index: ?NMDOT established price index
Trigger value: 10%
Web reference:
Comments: |
None |
None |
Yes
Index: NMDOT established price index
Trigger value: 10%
Web reference:
Comments: |
|
Escalation for AC used on all projects with at least 500 tons AC expected to last over more than one season. No contractor option. |
State contact: Joe Garcia
Title: State Construction Engineer
Phone: 505-827-5631
Email: Joe.S.Garcia@state.nm.us |
|
| New York |
Yes
Index: Avg. FOB for No. 2 fuel oil and unleaded gas in New York, Philadelphia, Detroit & Boston;
Trigger value: $0.03/liter
Web reference:
Comments: |
Yes
Index: Avg. FOB terminal price for unmodified PG 64-22 binder W/O anti-stripping agent;
Trigger value: e:
Comments: $10.00/metric ton
Web referenc |
Yes
Index: Producer Price Index for shredded carbon scrap steel (WPU 10121193) from Bureau of Labor Statistics;
Trigger value: 5%, min $1,000
Web reference:
Comments: |
Yes
Index: Producer Price Index for shredded carbon scrap steel (WPU 10121193) from Bureau of Labor Statistics;
Trigger value: 5%, min $1,000
Web reference:
Comments: |
No |
- |
|
State contact:
Title:
Phone:
Email: |
|
| North Carolina |
Yes
Index: Based on the average F.O.B. price for diesel at the Charlotte, Wilmington, and Selma, North Carolina terminals
Trigger value: Any change from the Base index included in the contract.
Web reference:
Comments: |
Yes
Index: Average of the Terminal Prices who supply Asphalt to NC
Trigger value:Any change in average terminal price for AC from the index price included in the contract at time of letting
Web reference: http://www.ncdot.org/doh/operations/dp_chief_eng/constructionunit/paveconst/Asphalt_Mgmt/acprices/
Comments: We used to have a 5% fluxuation trigger value until a few years ago. |
None |
None |
None |
None |
|
State contact:
Title:
Phone:
Email: |
|
| North Dakota |
Yes
Index:
Trigger value: 10%
Web reference: http://www.dot.nd.gov/fuelcost_adjustment.html
Comments: A new fuel cost adjustment special provision was provided in 2006 for motor fuels and burner fuels. Adjustments are made by formula, by type of fuel. |
None |
None |
None |
None |
None |
|
State contact: Eric Molbert
Title: Construction Admin Specialist
Phone: (701) 328-2568
Email: ermolbert@nd.gov |
|
| Ohio |
Yes
Index:
Trigger value:
Web reference:
Comments: Yes - 3/1/2006 |
Yes
Index: ODOT average of area suppliers;
Trigger value:
Web reference:
Comments: % AC trigger. Contractor has no option. |
Yes
Index: BLS and AMM index
Trigger value: 5%
Web reference:
Comments: |
Actual change in cost as verified. |
None |
|
http://www.dot.state.oh.us/construction/OCA/default.htm |
State contact:
Title:
Phone:
Email: |
|
| Oklahoma |
None |
Yes
Index: Asphalt Weekly Monitor ® furnished by Poten & Partners, Inc.
Trigger value: 3%
Web reference:
Comments: beginning with the June, 2006 letting, Oklahoma began using an Asphalt
Cement Price Adjustment Clause in all contracts that include asphalt pay
items. |
None |
None |
None |
|
|
State contact:
Title:
Phone:
Email: |
|
| Oregon |
Yes
Index: OPIS LISTING.
Trigger value: 25%
Web reference:
Comments: Must meet a minimum qualifier to be included in a Project. |
Yes
Index: POTEN INDEX
Trigger value: 5%
Web reference:
Comments: Must meet a minimum qualifier to be included in a Project. |
Yes
Index: BLS Final IDWPUSISTEEL1, PPI, non-seasonally adjusted index
Trigger value: 10%
Web reference:
Comments: Yes - Started October 2005. Selected steel bid items only. |
For Projects executed between April 1, 2003 through September 30, 2005 only. Based on actual change in cost as verified. |
None |
|
State House Bill 2077 became effective July 20, 2005. Part 2 covers retroactive steel escalation for Projects executed between April 1, 2003 through September 30, 2005. Part 6 of this bill mandated that a steel escalation/de-escalation program would be established on ALL ODOT administered Projects. |
State contact:
Title:
Phone:
Email: |
|
| Pennsylvania |
Yes
Index: OPIS
Trigger value: 5%
Web reference: not available
Comments: None |
Yes
Index: PA Producers
Trigger value: 10%
Web reference: ftp://ftp.dot.state.pa.us/public/bureaus/design/Pub408/Pub%20408%202007%20Chg%202/Sections/110.pdf
Comments: 3 Zones in PA |
None |
None |
None |
None |
None |
State contact: Scott Vottero
Title: Specification Review
Phone: 717-783-6400
Email: svottero@state.pa.us |
|
| Puerto Rico |
None |
None |
None |
USDOL Bureau of Labor & Statistics (PPI) Series WPU101704; 15% trigger |
|
A proposal to include guard rail is being considered |
Steel clause implemented aprox. On 06/04 |
State contact:
Title:
Phone:
Email: |
|
| Rhode Island |
Yes
Index: ?Base Price vs. Period Price.
Trigger value: Adjustment has to exceed $250/month for payment to be made
Web reference:
Comments: . |
Yes
Index: ??Base Price vs. Period Price
Trigger value:
Web reference:
Comments: |
Yes
Index: Bureau of Labor Statistics Producer Price Index for "hot rolled bars, plates & structural shapes.
Trigger value: 10%
Web reference:
Comments: For use on selected large projects; |
on selected projects, retroactive indexing may take place, following the specification established for "future" projects (not applicable to Federal-aid projects) |
|
|
|
State contact:
Title:
Phone:
Email: |
|
| South Carolina |
Yes
Index:
Trigger value: 10%
Web reference: http://www.scdot.org/doing/monthlyindexes.asp Click on monthly spreadsheet Excel link
Comments: Yes, see notes. |
Yes
Index:
Trigger value: 5%
Web reference: http://www.scdot.org/doing/monthlyindexes.asp Click on monthly spreadsheet Excel link
Comments: Yes, see notes. |
No |
No |
None |
|
Fuel and Asphalt Cement adjustments apply to only the items identified in the special provisions for each contract. |
State contact: Tim Lindberg
Title: Assistant Construction Data Support Engineer
Phone: 803-737-1308
Email: LindbergTW@dot.state.sc.us |
|
| South Dakota |
Yes
Index: Oil Price Information Service; Base Price vs. Period Price,
Trigger value: Contractor option prior to contract excution - 15%
Web reference:
Comments: Yes, for Burner Fuel, Diesel Fuel, and Unleaded fuel. |
No |
No |
No |
No |
No |
|
State contact:
Title:
Phone:
Email: |
|
| Tennessee |
Yes
Index: TDOT index (two component index, Producer Price Index and price TDOT pays for fuel),
Trigger value: 5%
Web reference:
Comments: |
Yes
Index: TDOT index (posted terminal prices),
Trigger value: 5%
Web reference:
Comments: April 2006 indexing liquid asphalt for short term (> 6 month) projects |
none |
none |
none |
|
|
State contact:
Title:
Phone:
Email: |
|
| Texas |
none |
none |
none |
none |
none |
none |
Texas has no escalation clauses. And no current plans for implementation of escalation clauses. |
State contact:
Title:
Phone:
Email: |
|
| Utah |
Yes
Index: based on price per barrel for West Texas Intermediate Crude;
Trigger value: 15%
Web reference:
Comments: adjustment limited to 5%; only apply adjustments to items having a value of $100,000 or more. |
Yes
Index: West Texas Sour index for crude oil
Trigger value:
Web reference:
Comments: Yes - similar to fuel index |
|
|
|
|
|
State contact:
Title:
Phone:
Email: |
|
| Vermont |
Yes
Index: "Energy Information Administration for New England"
Trigger value: 5%
Web reference:
Comments: Fuel price adjustment is applied separately to ACP, PCC, & Earth Work items |
Yes
Index: calculated by VAOT based on 3 or more major oil company terminals supplying Vermont;
Trigger value: 10%
Web reference:
Comments: |
No |
No |
no, but a fuel adjustment is provided for PCC paving |
Earth Work see comments |
|
State contact:
Title:
Phone:
Email: |
|
| Virginia |
Yes
Index: diesel fuel prices as published by the U. S. Department of Energy
Trigger value: No trigger for increases or decreases.
Web reference:
Comments: New Special Provision for Optional Fuel Price Adjustment implemented 1/06. Effects 120 bid items and uses Contractor must opt in or out within 21 days of bid opening. |
Yes
Index: Index for 64-22 & 70 -22 established from terminal prices supplied to Department by AC suppliers in state.
Trigger value: No trigger, this is a mandatory provision that applies to all asphalt on contracts that have over a minimum quantity.
Web reference:
Comments: YES: Base Index vs. Current Index. Base index posted one week before receipt of bids. Current used to adjust contracts under way. |
Yes
Index:
Trigger value: 10%
Web reference:
Comments: Optional: contractor must select to use steel adjustment clause at time of bid submission. See Notes. |
|
NO |
None |
The Price Index the Department is using for steel is based on The U.S. Department of Labor, Bureau of Labor Statistics, Producers Price Index (PPI) |
State contact: Richard Kiefer
Title: Estimates Process Engineer
Phone: 804-786-3837
Email: richard.kiefer@VDOT.Virginia.gov |
|
| Washington |
Yes
Index: West Coast #2 Diesel posted by Energy Information Administration (Dept. of Energy)
Trigger value: +/- 10%
Web reference: http://tonto.eia.doe.gov/oog/ftparea/wogirs/xls/psw18vwall.xls
Comments: Piloted a fuel clause on a single project in 2005. Then, in December 2006 WSDOT standardized a Fuel Adjustment General Special Provision for all projects greater than 200 working days that contain any of the eligible bid items (primarily earthwork, surfacing, paving and structures). Once 10% trigger is tripped, adjustments (both credits and payments) are applied to actual quantities of work paid in the current months estimate based on fuel consumption factors obtained from FHWA Technical Advisory T 5080.3.
|
Yes
Index: Agency established index based on cost of PG 64-22. Cost data obtained through Poten & Partners, Inc.
Trigger value: +/- 10%
Web reference: http://www.wsdot.wa.gov/biz/construction/CostIndex/CostIndexPdf/monthlyaverage.pdf
Comments: WSDOT standardized an Asphalt Cost Adjustment General Special Provision in September 2006 for all multi-season contracts. Once 10% trigger is tripped, adjustments (both credits and payments) are applied to actual quantities of work paid in the current months estimate. |
None |
None |
None |
In April 2004 WSDOT revised payment for "material on hand" for steel products. The change allowed payment for raw materials paid for by the contractor, previously payment was made after the item had been fabricated. |
WSDOT Fuel Cost Adjustment spec may be viewed at http://www.wsdot.wa.gov/publications/fulltext/projectdev/gspspdf/0903fr1.pdf. WSDOT Asphalt Cost Adjustment spec may be viewed at http://www.wsdot.wa.gov/publications/fulltext/projectdev/gspspdf/04054gr5.pdf. |
State contact: David Mariman
Title: State Specifications Engineer
Phone: 360/705-7831
Email: marimad@wsdot.wa.gov |
|
| West Virginia |
Yes
Index: OPIS
Trigger value:
Web reference: http://www.wvdot.com/10_contractors/10a4_fuelasphaltprices.asp
Comments: Contractor has no option. |
Yes
Index: WVDOH average of area suppliers;
Trigger value:
Web reference: http://www.wvdot.com/10_contractors/10a4_fuelasphaltprices.asp
Comments: Contractor has no option. |
None |
None |
None |
None |
New special provision in works to eliminate fuel and AC triggers and minimum adjustable quantities.New PRS has auto-calc capabilities;great savings in time and manual calc work. |
State contact: Todd Rumbaugh
Title: Director, Contract Administration Division
Phone: 304-558-9569
Email: trumbaugh@dot.state.wv.us |
|
| Wisconsin |
Yes
Index: No. 2 fuel oil in US Oil Week for Green Bay, Madison , Milwaukee and Minneapolis;
Trigger value: 15%
Web reference: http://roadwaystandards.dot.wi.gov/hcci/bid-letting/related-info/asp-5.pdf
Comments: Yes - for common excavation, rock ex., marsh ex. Borrow, select borrow and subbase; |
None |
None |
None |
None |
None |
|
State contact:
Title:
Phone:
Email: |
|
| Wyoming |
Yes
Index:
Trigger value:
Web reference:
Comments: contractor option;
see notes. |
Yes
Index:
Trigger value: 10%
Web reference:
Comments: |
No |
No |
No |
Clause for materials and supplies for select items, such as fabric, fence, seeding and pipe |
Fuel adjustment began in 2004 for motor fuels and burner fuels. Adjustment applies when prices indices are outside of 85% to 115% of bid price; adjustment is made by formula, by type of fuel. Contractor, in their bid proposal must declare if contract will or will not include Fuel Adjustment. Starting in our October 2005, material cost adjustments will be proposed for corrugated metal pipes, reinforced concrete pipes, geotextiles, geogrid, paving fabric, wood fence posts, fence wire, seed and mulch. An overrun of more than 25 percent from original quantity or a price change of plus or minus of 15 percent from original quoted price will trigger a price adjustment.. |
State contact:
Title:
Phone:
Email: |
|