Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback

Construction

FHWA Form 45 Bid Price Data (metric units)

PDF Version (110 kb)
Word Version (55 kb)

English units version of this form

OMB NO. 2125-0010

BID PRICE DATA
NOTE: Transmit only original to the Washington Headquarters, Office of Infrastructure
ATTN.: HIPA-10
 STATE
COUNTYFEDERAL PROJECT NO.(  )URBAN
(  )RURAL
DATE OF AWARD
ROADWAY
Contract Amount
$Code TypesROADWAY AND BRIDGE
BRIDGE
Contract Amount
$ 
TOTAL CONTRACT
AMOUNT
$
NUMBER OF UNITSUNITITEMUNIT PRICETOTAL COST
(Dollars)
DollarsCents
 M3111 Common Roadway Excavation   
 M3131 Unclassified Roadway Excavation1   
      
      
 KG.421 Structural Reinforcement   
 KG.431 Structural steel   
      
      
 t775 Bituminous concrete surfaces2   
 M2781 Port. cem. conc. surfaces _____ CM3   
      
      
      
 M3900 Structural concrete3   
      
      
PRICE ADJUSTMENTS
PCC PAVEMENTS AND
STRUCTURAL CONCRETE
UNIT PRICE

 

Prepared by:_______________________

Title:_____________________________

Date:_____________________________

Per Square MeterPer Cubic Meter
781781781900900
Unit bid price     
Steel, not bid separately (Subtract)     
Longitudinal joints (Subtract)     
Transverse joints (Subtract)     
Fine finishing of subgrade (Add)     
Cement or aggregates bid separately (Add)     
3 ADJUSTED PRICE     
REMARKS (Use reverse side if more space is needed.)

 

 

 

1 Unclassified Roadway Excavation (Item 131) when reported:
_______________________________ Percent Rock

Estimated Price of Rock _______________________________ per cubic meter

2 When aggregate and bituminous material are bid separately, combine quantities and total costs. In converting liters to metric tons, 982 liters per metric ton may be used. When bituminous material is bid in addition to the bid for mix, report weight of mix only, and the combined total costs.

DISCARD BEFORE
SUBMISSION
SUPPLEMENTAL
INFORMATION
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration

Agency Display of Estimated Burden
for
BID PRICE DATA

According to the Paperwork Reduction Act of 1995, no persons are required to respond to a collection of information unless it displays a valid OMB control number. The valid OMB control number for this form is 2125-0010. The average completion time for this form is 0.75 hours. If you wish to make suggestions, please fax them to 202-366-3988; or mail to:

Federal Highway Administration
Office of Program Administration, HIPA-10
1200 New Jersey Avenue SE
Washington, D.C. 20590

Form FHWA-45M (Rev. 7-98) (INF 4.2, 7/29/98) PREVIOUS EDITIONS OF THIS FORM ARE OBSOLETE
This form was electronically produced by Elite Federal Forms, Inc.

PDF files can be viewed with the Acrobat® Reader®
Word files can be viewed with the Word Viewer

Contact

Claretta Duren
Office of Program Administration
202-366-4636
E-mail Claretta

 
 
Updated: 04/07/2011
 

FHWA
United States Department of Transportation - Federal Highway Administration