SEP 14: Annual Report 2009: Capital Beltway HOT Lanes Project
6 Risk Allocations and Management
One shortcoming of the VDOT oversight budget is that it does not provide contingency funds. Over the first year of the project, various issues would have been far easier to address if contingency funds were available to VDOT. These include:
- Special studies associated with ambiguities in the contractual project scope
- Community desire for additional soundwall protection
- Fairfax County concerns regarding access to iNova Hospital
- MOT issues
- Permit requirements from third parties such as Fairfax County Park Authority, MWAA, and Norfolk Southern Railroad
Ultimately, VDOT was forced to request additional funds from the Commonwealth Transportation Board to address these issues.
Risk items are perhaps best viewed in terms of issues. These represent scope items that are ambiguous with regard to responsibility and inclusion in the contractual scope, as well as items that were unanticipated but are now seen as necessary to advancing the project.
The project team is still refining its approach to addressing and solving these issues, and many remain unresolved at this point. Exhibit 10 presents the Issues Log (Fluor's PCO log).:
Exhibit 10 I-495 HOT Lanes Work Order and PCO Tracking Log
| Fluor-Lane PCO # |
VDOT Work Order # |
VDOT Tracking # |
Description |
| 1 |
1 |
1A |
Replace I-495 NB bridge over Chain Bridge Rd. - Initial MOT Study |
| 1 |
|
1B |
Replace I-495 NB bridge over Chain Bridge Rd. - Design |
| 1 |
|
1C |
Replace I-495 NB bridge over Chain Bridge Rd. - Construction |
| 42 |
|
2A |
Disapprove Bridge-mounted Sign Structures - Design Costs |
| 42 |
|
2B |
Disapprove Bridge-mounted Sign Structures - Construction Costs |
| 2 |
|
3 |
Continuous Lighting |
| 3 |
|
4 |
ITS - Fiber Optic Cable |
| 5 |
|
5 |
Bike/Pedestrian Extensions |
| 9 |
|
6 |
VES - Vehicle Enforcement Systems |
| 10 |
|
7 |
VOD - Vehicle Occupancy Detection |
| 11 |
|
8 |
HOT OC Location |
| 12 |
|
9 |
Phase VIII Deferred Items |
| 13 |
|
10 |
Bridge Width at LRTP - B603/B654 |
| 14 |
|
11 |
Retaining Wall at Macerich/Parcel 092 - Tyson's Corner |
| 15 |
|
12 |
Existing Drainage Rehab Debate per TR 3.4C |
| 17 |
|
13 |
Parcels 134 & 047 - Fairview Property - ROW/Savings Allowance Issue |
| 19 |
|
14 |
Westpark T-Connector over I-495 - B648 widening |
| 25 |
|
15 |
Future DMS and static signs - request from ITS/Tolling working group session |
| 31 |
|
16 |
Design Waiver #9 Denial - HOT Ramps at I-66 |
| 37 |
|
17 |
Phase VIII Ops - IJR issue with I-95/I-395 |
| 43 |
|
18 |
MWAA Access Rights at Dulles Toll Road |
| 57 |
|
19 |
Existing Drainage Upsize from 15" to 18" per TR 3.4 |
| 59 |
|
20 |
Existing Drainage Rehab Issues on Phase VIII Ramps |
| 60 |
|
21 |
Fairfax County Noise Waiver |
| 63 |
|
22 |
Modification to Sign Headers Due to CBE Branding |
| 66 |
|
23 |
Phase VIII As-built Conflicts - Utility? |
| 67 |
|
24 |
Withholding ROW Approval due to Utility Easements not shown |
| 68 |
|
25 |
Phase VIII As-Built Conflicts - Foundations? |
| 69 |
|
26 |
Recovery of estimating and engineering cost - ARCA Ex. N Att. 1.5D 108.9.3 |
| 70 |
|
27 |
VDOT 29/Gallows Rd Project Interface |
| 73 |
|
28 |
Noise Barrier 13D |
| 74 |
|
29 |
Noise Barrier 13A & 13E |
| 75 |
|
30 |
Phase VIII Archeological Find |
| 76 |
|
31 |
Direct Communications between VDOT and Fluor-Lane |
| 77 |
|
32 |
Regional Signing Plan |
| 78 |
|
33 |
Attenuators |
| 79 |
|
34 |
Toll Gantry Design |
| 80 |
|
35 |
2-foot Barrier Offset |
| 81 |
|
36 |
Modify Noise Barrier Heights |
| 82 |
|
37 |
NVRPA and W&OD Bridge Widths |
| 83 |
|
38 |
Re-Analysis of Soundwalls |
| 85 |
|
41 |
Refurbish B602 Wakefield Pedestrian Overpass |
| 84 |
|
42 |
Phase VIII Parapet Height |
|