| PM Plan |
Implementation |
| No.1 |
Description |
Frequency |
C/I |
In-House Forces |
Maintenance Contract |
| 2004-6 |
>2006 |
| A.1 |
Debris Removal |
Weekly |
I |
x |
x |
x |
| A.2 |
Mechanical Sweeping |
Every 2 weeks |
I |
x |
x |
x |
| A.3 |
Cleaning of Drainage System |
Every 4 months |
C |
x |
29633.980301 |
|
| A.4 |
Cleaning of Abutment & Pier Tops |
Annually |
C |
x |
(part of A.6) |
|
| A.5 |
Cleaning of Modular Expansion Joints |
Every 2 weeks |
C |
x |
29633.9811 |
|
| A.6 |
Cleaning & Washing of Bridge |
Annually |
C |
x |
39633.9401 |
|
| A.7 |
Patching of Sidewalks |
Annually |
I |
2 |
x |
x |
| A.8 |
Crack Sealing in Pavement & Curblines |
Annually |
I |
2 |
x |
x |
| A.9 |
Masonry Pointing & Crack Sealing |
Annually |
I |
2 |
x |
x |
| A.10 |
Repair of Wearing / Microsurfacing Overlays |
Every 3 years |
C |
x |
7 29410.1099 |
|
| A.11 |
Maintenance of Roadway Bridge Lighting |
Every 2 weeks |
I |
3 |
x |
x |
| A.12.1 |
Lubrication of Air and Fire Line Valves |
Every 3 months |
C |
x |
29633.980401 |
|
| A.12.2 |
Lubrication of Truss Chord Expansion Slides |
Every 2 weeks |
C |
x |
29633.9811 |
|
| A.12.3 |
Cleaning of Wind Tongues |
Every 3 months |
C |
x |
29633.9812 |
|
| A.12.4 |
Cleaning and Lubrication of eyebars at Anchorages |
Monthly |
C |
|
x |
x |
| A.13.1 |
Painting of Steel (Full Bridge) |
Every 12 years |
C |
4 |
x |
 (~2008) |
| A.13.2 |
Spot Painting 1 |
3 yrs. after A.13.1 |
C |
x |
x |
x |
| A.13.3 |
Spot Painting 2 (Painting of Salt Splash Zone) |
6 yrs. after A.13.1 |
C |
x |
 (Truss A, B) |
x |
| A.13.4 |
Spot Painting 3 |
9 yrs. after A.13.1 |
C |
x |
x |
x |
| B.1.1 |
Cleaning and Lubrication of Cables at Anchorages |
Annually |
I |
|
x |
x |
| B.1.2 |
Lubrication of Solid Rod Suspenders Bearings |
Annually |
I |
|
x |
x |
| B.1.3 |
Traveler Maintenance |
See Maint. Plan |
I |
|
x |
x |
| B.1.4 |
Maintenance of Electrical Systems |
Monthly |
I |
|
x |
x |
| B.3 |
Winter Plan |
See Maint. Plan |
I |
|
x |
x |
1: Numbers from the Maintence Plan.
2: Currently work performed by in-house forces on as-needed basis (not FHWA funded).
3: Responsibility of NYCDOT Street Lighting (not FHWA funded).
4: Responsibility of NYCDOT Paint Section.
x: Not in PM Contract/Force Account work.
: Identifies responsible party for performing the related PM activity (FHWA funded).
I: Task performed by NYCDOT in-house forces.
C: Task performed by Contract.