| Research Home | Pavements Home | |
![]() |
|
| This report is an archived publication and may contain dated technical, contact, and link information | |
|
Publication Number: FHWA-RD-01-169
Date: October 2005 |
|
Rehabilitation of Jointed Portland Cement Concrete Pavements: SPS-6, Initial Evaluation and AnalysisFIGURE 2 LTPP data collection and data movement flowchart.
Abbreviations
|
|
Topics: research, infrastructure, pavements and materials Keywords: research, infrastructure, pavements and materials,AC overlay, CPR, crack and seal, design factors, experimental design, JPCP, JRCP, LTPP, performance trends, rehabilitation, SPS-6. TRT Terms: Pavements, Concrete--Joints--Maintenance and repair--Evaluation, Pavements, Concrete--Joints--Performance--Evaluation, Pavements, Reinforced concrete--Performance--Evaluation, Rehabilitation (Maintenance), Pavement performance, Climatic regions, Experimental roads Updated: 04/23/2012
|
|
|