Skip to contentUnited States Department of Transportation - Federal Highway Administration FHWA Home
Research Home
Report
This report is an archived publication and may contain dated technical, contact, and link information
Publication Number: FHWA-RD-98-084

The information in this manual does not necessarily represent current practice. It is on this site for archival reference purposes only.

FHWA Field Manual for Bridge Painting Inspection

Inspecting the Enclosure


Project #___________________

Date:_____________

Inspector:__________________


Verify adequacy of the containment system. ___

  • Containment built according to the approved plan.
  • Tarps free of holes with seams overlapped and securely fastened.
  • No visible dust escaping from containment.
  • No signs of surrounding ground or water contamination.

Comments:

 

Evidence of proper air movement within the containment. ___
Comments:

 

 

 

 

 

 

 

 

 

Proper storage of debris. ___

  • On-site storage of waste should not exceed 90 days.
  • Contaminated waste is not accessible to the public and is not subject to traffic collision.

 

Comments:

 

 

 

 

 


Back to the Manual

ResearchFHWA
FHWA
United States Department of Transportation - Federal Highway Administration