Report
This report is an archived publication and may contain dated technical, contact, and link information
Publication Number: FHWA-RD-98-084

The information in this manual does not necessarily represent current practice. It is on this site for archival reference purposes only.

FHWA Field Manual for Bridge Painting Inspection

Materials/Pre-Painting


Project #___________________

Date:_____________

Inspector:__________________


Verification that the paint has not exceeded its shelf life. ___
Comments:




 

Verification that the paint is not stored in areas subject to temperatures beyond the recommended limits. ___
Comments:




 

Verification that the paint has not exceed its pot life. ___
Comments:




 

Documentation of any use of thinner. Do not exceed recommended maximum. ___
Comments:




 

Verification of curing time. After painting, inform the contractor of the estimated time that should be allowed for the paint to cure. Do not allow another coat to be put on until the appropriate amount of time has elapsed per the existing weather conditions. ___
Comments:





Back to the Manual

 

U.S. Department of Transportation
Federal Highway Administration
Research, Development, and Technology
Turner-Fairbank Highway Research Center
6300 Georgetown Pike
McLean, Virginia 22101-2296

Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000
Turner-Fairbank Highway Research Center | 6300 Georgetown Pike | McLean, VA | 22101