Federal Highway Administration > Publications > Research > CORROSION PROTECTION - CONCRETE BRIDGES |
Publication Number: FHWA-RD-98-088 |
Previous | Table of Contents | Next
Since our total investment in the nation's highway infrastructure amounts in the billions of dollars, it is extremely important that all possible methods applicable to controlling corrosion in existing concrete bridges be developed so that these structures will not deteriorate prematurely. Equally important is developing methods to avoid this costly corrosion problem in all new concrete bridges to be constructed in the future. Accordingly, the research program undertaken in this HPA was divided into two major areas:
To be effective, this research program involved not only the
participation of FHWA, but other partners including another federal
agency (National Institute of Standards and Technology), some state
highway agencies, the academia, and the private industry. The
following is a presentation of results or accomplishments achieved
to date in these two areas.
A. Corrosion Control in New Concrete
Constructions
Given the very harsh service environments that many bridges will be
exposed to typically, it is extremely difficult - but not
impossible - to build reinforced concrete bridges that would be
free of steel reinforcement corrosion. The achievement of this goal
would require the adoption of system approach, i.e., using a
combination of different measures, such as adequate depth of
concrete cover, quality concrete, corrosion inhibitors admixture,
and corrosion-resistant reinforcement.
1. Adequate Concrete Cover
It is now widely accepted that, for a concrete structure to be
durable in a corrosive environment, it is absolutely necessary to
provide an adequate layer of concrete or depth of concrete cover
over the first layer of reinforcing steel so that it would not be
easy for chloride ions to reach the steel. This adequate depth of
cover can be determined by application of Fick's second law of
diffusion, which adequately models the intrusion or diffusion of
chloride through a porous material such as concrete (17):
(C x/ t) = D( 2C x/ 2) |
(12)
|
where, C x is the concentration of chloride at depth c at time t, D is the diffusion coefficient of chloride. The solution to this equation for a semi-infinite slab is:
C(,t) = Co { 1—erf [ / (2 (Dt)½)] } |
(13)
|
which is applicable to concrete structures where the chloride ions enter from one direction, such as concrete bridge decks and piers. Using this relationship, the minimum depth of concrete cover over the reinforcing steel that would be required so that the total amount of chloride ions that will accumulate at the depth of steel will not exceed the corrosion threshold—before a desired service life is reached—can be determined from the measured chloride diffusivity of the selected concrete mix design and the anticipated level of exposure of the structure to deicing salts. Finally, this minimum depth of cover must be incorporated with expected construction tolerances (that accounts for typical construction variance) to achieve a rational depth of cover specification (18). For example, if a minimum concrete cover of 50 mm is required and statistical surveys of the cover on recently built bridge decks show that the cover on a deck typically assumes normal distribution with a standard deviation of approximately 10 mm, then the specified cover must be either 67 mm or 73 mm for 95-percent or 99-percent compliance, respectively.
However, even with adequate concrete cover, corrosion of
reinforcement can still occur because, invariably, concrete will
crack. In addition, presence of variances in the concrete cover and
in the density of the placed concrete across a structure will
eventually create corrosion micro-cells (consisting of cathodes and
anodes), which drive steel corrosion. Therefore, other
supplementary protective measures also need to be adopted in a new
construction.
2. Quality Concrete
Recently, there is also a heightened awareness that the quality of
concrete is of utmost importance in determining the durability of
reinforced concrete bridge members exposed to chlorides and
subjected to intermittent wetting. Although concrete is outwardly a
dense material, it contains pores; and many of these pores are
interconnected to form a network of channels that allows water and
oxygen, both important to steel corrosion, to permeate into the
concrete. And, as a general rule, low water/cement ratio and good
consolidation lead to either a lower number of pores or smaller
pores in the concrete, both of which can lead to reduce
penneability. In addition, reduced permeability also leads to
reduction in the electrical conductivity of the concrete by
reducing not only the amount of moisture intrusion but also the
amount of chloride ions carried by the moisture into the concrete.
A low water/cement ratio also offers higher strength to the
concrete, which would extend the time before stresses resulting
from steel corrosion cause the concrete to crack. Therefore,
mixture proportions must be carefully selected to the keep the
water/cement ratio to an absolute minimum.
In addition to making state transportation agencies become aware of the importance of using low water/cement ratio in concrete mixes, some recent FHWA research efforts were aimed at identifying concrete materials that can consistently provide superior performance when used in construction of bridges. These efforts included investigation into how concrete material and mix variables, such as water-cement ratio, air content, coarse aggregate type, fine aggregate type, mineral admixture, and cement type, affect the corrosion behavior of steel (19). The test matrix adopted in this investigation is shown in Table 1.
Variable
|
Number | Type |
Cement type | 6 | Type I-low C3A, Type I-high C3A, Type I-low alkali, Type I-high alkali, calcium aluminate, magnesium phosphate |
Mineral admixture | 4 | Silica flume, Class C fly ash, Class F fly ash, GGBF slag |
Coarse aggregate | 2 | Limestone, quartz |
Fine aggregate | 2 | Glacial sand, quartz sand |
Water-cement ratio | 3 | 0.3, 0.4, 0.5 |
Air content | 3 | 2, 5, 8 percent |
Exposure environment
|
2 | Moderate, severe |
Because only 30 concrete mix designs were used, which were insufficient to test all the possible combinations of the large number of variables, only weak correlation between corrosion rate or potential and these variables/types were obtained, for both moderate and severe environments. Nevertheless, it was possible to draw some general conclusions, the primary of which was that the corrosion rate of reinforcing steel varies significantly depending on the concrete mix components. Among the variables investigated, water/cement ratio, cement type, mineral admixture, and fine aggregate exhibited the most significant effects on the durability of the concrete. The other factors, such as coarse aggregate and air content, also affect behavior of steel in concrete, but to a lesser extent. The data indicated that the Type I cement (low C3A), quartz fine and coarse aggregates, and silica fume appeared to be the best materials for improving resistance of concrete to deterioration (20).
The use of blended cements might, under certain circumstances, be detrimental because of a reduction in alkalinity in the concrete. However, this adverse effect may be more than offset by the beneficial effects that blended cements can offer, which include a substantial reduction in permeability and also a reduction in conductivity—especially where a reduction in the water-cement ratio is made possible.
In addition, the investigation also attempted to quantify the
corrosive conditions fostering concrete bridge deterioration. The
effects of environmental variables such as chloride concentration,
temperature, and humidity, on the corrosion behavior of reinforcing
steel in a typical concrete mix were examined (21). The adopted test matrix is shown in
Table 2.
Chloride Level
kg/m 3 (lb/yd 3) |
Temperature
°C (°F) |
Rel. Humidity
(percent) |
0.59 (1)
|
4 (40) | 43 |
1.77 (3)
|
21 (70) | 75 |
5.93 (10)
|
38 (100) | 98 |
From the data collected, a statistical regression model was developed to permit prediction of the corrosion rate as a function of these three variables. Even though the model has only a correlation coefficient of 0.50, it serves to demonstrate that, given any chloride concentration, the environmental factors of temperature and humidity also significantly affect the corrosion behavior of steel in concrete. This explains why the problem of reinforcing steel corrosion is considerably more severe in the marine environment of states like Florida than in some other states.
The following are the most important findings resulting from these investigations:
Even if concrete can be made to be extremely impermeable (by the addition of pozzolans like microsilica, etc.) and not conducive to steel corrosion (by the addition of an effective inhibitor), it still would not completely solve the corrosion problem, since concrete has a tendency to crack eventually, especially the high-performance concrete if proper curing is not observed. The final line of defense against corrosion of reinforcing steel would still lie with the reinforcing steel itself. Unfortunately, the resistance of mild steel to corrosion can not be significantly improved by just modifying its composition, grade, or the level of stress (22). Therefore, to prevent corrosion of steel reinforcement in concrete located in corrosive environment, either the conventional mild steel reinforcement must be coated with an effective and economical barrier to prevent contact with chloride, moisture, and oxygen, or reinforcement made of corrosion-resistant materials must be used.
Among the above two options, application of a suitable coating
on the mild steel reinforcement may be the most economical. The
coated reinforcing steel must be resistant to damages during
transport from a plant to a construction site, storage at
construction site, and placement in the structure. It must also be
durable in severe service environment and capable of maintaining
its structural function throughout the service life of the
structure, and be economical.
a. Steel Bars With Organic
Coating
After roadway deicing salts was identified as the cause of the
premature deterioration of many concrete bridges, solutions to
control this problems have to be developed since banning of deicing
salts would not be acceptable to the motoring public. A solution
that was identified as potentially viable and economical is the
application of a suitable, stable organic coating on the
reinforcing steel to serve as a barrier for isolating the steel
from moisture, chloride ions, and oxygen, thereby preventing
corrosion. Therefore, in the early 1970s, the Federal Highway
Administration sponsored a project at the National Institute of
Standards and Technology, then the National Bureau of Standards, to
search for organic coatings suitable for this application. In that
study, 47 coatings—including 36 epoxies (in both liquid and powder
forms)—were evaluated in the laboratory (23). Four fusion-bonded epoxy powders
emerged as the most promising of the coatings studied.
The first bridge utilizing epoxy powder-coated reinforcing steel bars (hereafter called epoxy-coated rebars) was built in 1973 in West Conshohocken, Pennsylvania. Subsequent trial of some of these coatings in bridge decks, under the National Experimental and Evaluation Program, revealed some problems such as damage to the coating during transport and handling, and cracking of coating (in the bend areas) rising from bending of bars at construction sites. To eliminate or alleviate these problems, measures such as bending the bars before coating, increasing bar supports during shipping (to prevent abrasion between bars), and using padded bundling bands and nylon slings during loading and unloading, were adopted.
In a subsequent FHWA study using relatively large concrete slabs, the performance of some epoxy-coated rebars that failed specifications—by having excessive holidays and surface damage (in excess of 0.8 percent) and failing bend tests—was compared with that of black steel (24). It was found that even though the coating on those rebars failed specifications, it was effective in reducing steel corrosion in salted concrete. Based on the data, it was estimated that, relatively, if it required 1 year to consume a given amount of black steel, then 12 years would be required to consume the same amount of the coated rebars, when the epoxy-coated rebars were used only in the top mat bars; or, 46 years would be required, if the coated rebars were used in both top and bottom mats. (The shorter protection accrued when the coated rebars were used only in the top mat was due to the formation of macro-cells between the different types of rebars in the two mats, especially when electrical couplings exist.) It appeared that the presence of the insulating epoxy coating caused significant increase in the electrical resistance between the top- and the bottom-mat of steel bars, which typically behaved as macro-anode and the macro-cathode, thereby retarding steel corrosion.
These findings had lessened the concern that a small exposed area of steel would be susceptible to intense corrosion and, thereby, enabled the requirement for patching or repair of coating damages to be waived when the damage is less than 2 percent in straight bars, 5 percent in bent bars, and 3 percent after placing. This led to decrease in the cost of epoxy-coated steel bars and their wider use in bridges by many states. However, in 1992, a final report for the Canadian Strategic Highway Research Program, "Effectiveness of Epoxy-Coated Reinforcing Steel," raised some questions about the long-term corrosion and structural performances of this type of steel bars, based on observation that some of the epoxy films became disbonded, blistered, and cracked (25). Since then, both ASTM and AASHTO specifications for epoxy-coated rebars, on the presence of holidays and bare area and on coating thickness, were revised and tightened. The Canadian report also urged that the effect of coating adhesion loss on the structural bond and creep properties of concrete members reinforced with epoxy-coated bars be investigated.
To study this important issue, the FHWA conducted a series of short-term experiments to assess the possible effects of disbondment of the epoxy coating from the steel bars on critical bond stress and flexural strength (26). For comparison, a series of pull-out concrete specimens and flexural reinforced concrete slabs were fabricated with: (a) epoxy-coated bars with different levels (20 to 30 percent) of intentionally induced disbondment in coating, (b) epoxy-coated bars with good coating, and (c) black steel bars. Although the investigation was limited in the number of tests conducted and in some other aspects (including bar size, deformation pattern, grade of steel, and slab design used), it was adequately designed to detect any significant differences in the behaviors of concrete fabricated with coating-disbonded bars and normal epoxy-coated bars.
The positive moment tests showed that the mere presence of epoxy coating on the bars, with either well- or partially-bonded coating, appeared to reduce the average ultimate diagonal tension capacity by 14 percent. When the positive-moment flexural behavior of different slabs were compared, no significant difference was observed between bars with partially bonded coating and bars with well bonded epoxy coating. Furthermore, no significant differences were observed in the comparison of the negative-moment flexural behaviors of the concrete slabs cast with the three types of bars. Results from the pull-out tests showed that the critical bond strengths for the bars with partially disbonded coatings were measurably lower than those for good epoxy-coated bars. However, even with 20 to 30 percent coating disbonded, the coated bars still developed 80 percent of the mean critical bond strength for bare bars. Essentially, the study indicated that even with 20- to 30-percent disbondment in the coating, the structural capacity of concrete reinforced with epoxy-coated steel bars was not compromised.
In response to the concerns raised in some portions of the United States, especially in Florida, about potential problem with the long-term durability of present epoxy-coated rebars, a series of investigations were initiated by FHWA in 1993 with the following objectives:
The following are presentation of the various findings resulting from these investigations.
(1) Reexamination of the Performance of Epoxy-Coated Rebars
in Concrete Structures Exposed to a Marine Environment.
Following some early success of epoxy-coated rebars in
controlling corrosion in bridge decks, some state highway agencies
started using them in substructure concrete members in the marine
environments, despite some major differences between the exposure
conditions existing in bridge deck and marine applications.
Reinforced concrete in a marine environment is subjected to:
All these conditions contribute toward lowering the resistivity of the concrete and thereby facilitating the flow of corrosion current between anodes and cathodes in both micro and macro levels.
Therefore, it was not totally surprising when in the late 1980s, reports about the premature deterioration of a number of substructure concrete members in the splash zones of three bridges located in the Florida Keys began to circulate. Even though there were different opinions about the quality of materials and construction practices employed in those bridges, nevertheless it was not expected to encounter in such a short period the severity of corrosion observed. This report led to claims that: (a) when exposed to marine environments, epoxy-coated rebars are more susceptible to corrosion than bare rebars; (b) epoxy coatings are, therefore, not effective in providing long-term protection to rebars in salt-contaminated concrete, even in bridge decks; and (c) the technology of organic-coating of rebars, as practiced in North America, is (probably) flawed. Responding to this concern, a study was initiated to reexamine the effectiveness of epoxy coatings on the steel rebars in substructure bridge members exposed to a simulated marine environment and to identify the cause of the problem, if any (27).
In this study, two parallel sets of experiments were conducted to investigate: (a) anodic growth as a function of immersion time; and (b) cathodic disbondment plus wet-adhesion loss. Quantification of anodic growth was made using (nondestructive) infrared thermography; whereas, quantification of disbondment was made with a specially developed peel test apparatus. The variables included in each experiment were: (a) two commercial epoxy coatings — designated as Coating 1 and Coating 2; (b) two coating thicknesses—approximately 139 and 190 (5 to 8 mils); (c) two coating conditions—unscribed and scribed; (d) one immersion solution - saturated Ca(OH) 2solution with 3.5 percent (by wt.) of NaCl; and (e) two immersion-solution temperatures—35°C and 50°C (95°F and 122°F). Approximately 200 steel panels coated with the two coatings were used in the experiments. The following observations were noted:
The basic implication of all these findings is that for
epoxy-coated rebars to protect reinforcing steel from corrosion,
it's extremely important that the coating is free of any
significant damage before being embedded in concrete and special
care be observed to avoid damaging the coating during concrete
pouring and consolidation. Hence, strict compliance with
specifications and use of vibrators equipped with rubber-lined
heads were strongly recommended.
(2) Assessment of the Performance of Epoxy-Coated Rebars in
Bridge Decks
Recently, 11 state highway agencies in the U. S. and the Canadian
SHRP conducted investigations to evaluate the performance of
epoxy-coated rebars on 92 bridge decks, 2 bridge baffler walls, and
1 noise barrier wall, which were exposed to harsh service
conditions. To shed some light on the controversy regarding the
performance of epoxy-coated rebars, FHWA assembled and analyzed the
data available from these investigations (28). The bridge decks evaluated included
some that were constructed with epoxy-coated rebars used in the top
mat of reinforcement only and in both the top and the bottom mats.
In addition, 7 different types of epoxy powders were involved in
these structures, where the epoxy-coated rebars had been in service
up to 20 years at the time of the investigations. In-situ and
laboratory evaluations of the concrete and the epoxy-coated rebars
were typically included in these investigations. The methodology
used in the field or in-situ evaluations included some or all of
the following:
The laboratory evaluations used some or all of the following procedures:
The results from the various investigations were summarized according to:
In summary, the following conclusions can be made on the performance of epoxy-coated rebars in the bridge decks surveyed:
(3) Search for New Corrosion-Resistant Organic-Coated
Bars
In 1993, following reports of contradictory performances of ECR in
piles exposed to marine environment and in bridge decks exposed to
deicing salts, FHWA initiated a 5-year research study to develop or
identify corrosion resistant rebars that could provide a
corrosion-free service life of 75 to 100 years (29,30,31). This study investigated 60 different
rebars, including rebars with organic, inorganic, ceramic, and
metallic coatings, as well as solid metallic bars.
Among these 60 different rebars were steel bars with 33 different organic coatings, of which 22 were bendable and 11 were non-bendable coatings. The bars were obtained from 15 organizations in the United States, Canada, Japan, England, and Germany. Of these, 17 coatings were utilized in conjunction with new improved steel surface cleaning processes and/or chemical treatments. In addition, since reinforcing bars are typically subjected to various severe conditions during their transportation, storage, installation, and service, the testing was designed to simulate field conditions.
In the Phase I prescreening tests, these rebars were subjected to accelerated solution-immersion screening and cathodic disbonding (CD) tests, using both straight and bent (to 4 D) specimens, each with one 6-mm hole drilled into the coating to simulate severed damage in the coating (29). The adopted test conditions are presented in Table 3. For the immersion tests, four solutions, of different compositions and pHs, were selected to produce corrosion and disbondment that the researchers believed to represent what could be expected during storage at construction sites, installation operations, and in-service behavior within mature concrete (Table 3). The specimens were immersed in these solutions at 55°C for up to 28 days. After immersion for 1, 3, 7, and 28 days the coated bars were visually examined for blisters, cracks, corrosion, and adhesion loss. The adhesion of the coatings was evaluated on both the straight and the bent sections of the bars, using the knofe-peel adhesion tests described in ASTM G1, while the bars were wet and again after 1 and 7 days of air drying.
To assess coating quality, the coating industry has been
utilizing cathodic disbondment tests, which are described in AASHTO
M284, ASTM A775, ASTM D3963, ASTM G8, and ASTM G42. To make the CD
test in this study more severe than similar tests conducted by
others, this test was conducted on 4-D bent bars (instead of
typically straight bars) to introduce bending stresses on the
coatings. As Table 3 indicated, the tests were conducted at a
potential of -1,000 mV (versus static potential) over a period of
28 days at 23°C in a solution of 0.3N KOH + 0.05N NaOH at pH 13.3.
This solution was used because it had previously been shown to
produce more disbondment of organic coatings than other solutions.
After 1 hr, 7 days, and 28 days of CD testing, impedance
measurements were performed on the specimens; and, coating adhesion
evaluation of the specimens was conducted only after the 28-day
period.
Test | Solution Immersion | Cathodic Disbonding | |
Specimen Type
(Number) |
Straight bars (16)
|
4-D Bent bars (8)
|
4-D Bent bars (2)
|
Solutions |
|
Same |
0.3N KOH + 0.05N NaOH (pH 13.4) at 23°C
(73°F)
|
Duration | 1,3,7, and 28 d | Same | 28 d (at 1000 mV) |
Coatings Tested | 22 bendable 11 nonbendable |
20 bendable 6 nonbendable* |
21 bendable 6 nonbendable |
In Phase II, seven of the best performing coatings from Phase I and three other new coatings (the 3M 213 bendable epoxy coating and two non-bendable coatings—an epoxy and a vinyl) were vigorously screened (30). The adhesion of these 10 coating systems on straight, 4D, 6D, and SD bent bars were tested, after solution immersion tests and cathodic disbonding tests, which were conducted under the conditions listed in Table 4.
Test | Solution Immersion | Cathodic Disbondment | |
Specimen Type | 1. Straight bars 2. 4-D bent bars 3. 6-D bent bars 4. 8-D bent bars |
1. Straight bars 2. 4-D bent bars 3. 6-D bent bars 4. 8-D bent bars |
|
Intentional Coating Damage | Two 6-mm drilled holes | ||
Replicates | 4 per solution | 3 | |
Test Solutions |
|
|
|
Temperature | 55°C (131°F) | 23°C (73°F) | |
Potential Shift | - | -1,000 mV (CSE) | |
Test Duration | 28 days | 7 days |
These organic coatings—one from Phase I and five from Phase II—represent a very broad range of adhesion performances. The scotchkote 213 was also chosen since it is in most of the bridges currently in service. For control, a conventional black steel is also included. To more accurately represent real bridge structures, a new and even more severe test method that incorporates a new specimen configuration and cyclic salt ponding is being used. The following is a brief outline of this in-concrete testing of the rebars with the selected coatings:
This in-concrete testing is complete. It is
anticipated that analysis of the data and preparation of a report
will be completed by the end of 1998 for 75 percent of the concrete
slabs. The remaining slabs will be kept for long-term
observation.
So far, the following are some of the major conclusions that have
been drawn on the performance of ECR in simulated adverse
environments in outdoor and indoor laboratory research:
(4) Cost Impact and Potential Pay-Off from Use of
Epoxy-Coated Rebars
(a) Cost Impact. For bridge engineers, cost and benefits are
always important factors to consider when making materials
selection. To illustrate the cost-benefit aspect of using ECR in
bridge decks, consider the actual cost data for the construction of
three bridge decks recently in Illinois using epoxy-coated rebars
in lieu of black steel. The delivered on-site cost of uncoated
black steel was $0.44/kg ($0.20/lb) and ECR was $0.62/kg
($0.28/lb). The cost associated with using the different rebars and
the total costs of the decks are presented in Table 5. From this
example, it is evident that the cost of decks constructed with
epoxy-coated rebars averages about 1 percent more than if
constructed with black steel.
Deck | Cost of Bars
($) |
Cost of Deck
($) |
||
Black Steel |
Epoxy-Coated
|
Black Steel |
Epoxy-Coated
|
|
A |
21,644
|
30,302
|
690,000
|
698,658
|
B |
22,544
|
31,561
|
880,000
|
899,017
|
C |
13,614
|
19,059
|
1,122,000
|
1,127,445
|
(b) Potential Pay-off The potential pay-off can be estimated conservatively on the basis that the ECR deck will provide at least twice the corrosion-free service life of decks built with black steel. On the federal-aid highway system, there are about 2.3 billion square feet of deck surface. So far, ECR has been used on only 100 million square feet of deck. Based upon the average replacement cost of $40/sq. ft. for bridge deck, the potential savings are: $40/sq.ft. x 100,000,000 sq.ft. = $4 billion in 50 years, or earlier. Considering that eventually the remaining decks built with black steel will need replacement, the estimated future savings on the decks will be: $40/sq.ft. x 2,200,000,000 sq.ft. = $88 billion in that same amount of time. Since the above estimated figures are for decks on the federal-aid highway system only, the potential saving is greater if the off-system bridges are also considered in the above scenario.
At present, epoxy-coated rebar is the most common protection system used by 48 state highway agencies. To date, fusion-bonded ECR has been used as the preferred protection system in about 20,000 bridge decks, which represent roughly 95 percent of the new deck construction since the early 1980s. And, the use of ECR has extended to other structures, such as continuously reinforced concrete pavements, parking garages, nuclear power plants, coal plants, aquariums, buildings exposed to the marine environments, and wastewater treatment tanks. At present, there are approximately 100,000 structures containing ECR. Due to the success and the confidence gained by using fusion-bonded ECR over the last 20 years, there are about 35 coating plants. In addition, there are a significant number of people employed in the manufacture of epoxy powders and fabrication of the epoxy-coated reinforcement.
b. Steel Bars with Metallic Coating and
Alternative Solid Metal Bars
The success enjoyed by metallic coatings on protecting
steel from corrosion in other environments has raised the prospect
of similar success in concrete. Metallic coatings that can be
applied on reinforcing steel to provide protection against
chloride-induced corrosion in concrete can be classified into two
categories: sacrificial or non-sacrificial (noble). Coatings made
of metal such zinc, which has more negative potentials or less
noble than iron, can provide sacrificial protection to steel. When
this sacrificial coating on a steel is broken, a galvanic cell or
couple is formed whereby the coating is slowly sacrificed. Noble
metals such as copper and nickel can also be coated on steel;
however, the protection exist only as long as the coating is
unbroken, since any exposed steel is anodic to the coating.
Nickel and zinc claddings began to receive attention in the late 1960s and have been shown to be capable of delaying, and in some cases preventing, the corrosion of reinforcing steel in concrete (32,33,34,35). The nickel-clad bar is produced by applying a heavy layer of nickel to a billet before hot rolling to its final form. This results into a continuous surface barrier of wrought nickel, at least 0,025-mm (0.001-in) thick, with an underlying diffusion zone of alloyed nickel and iron, which provides additional corrosion protection in the event of a break in the wrought nickel. The corrosion resistance of nickel is high in alkaline chloride solution, and even if breaks occur in the nickel coating, corrosion of steel is not appreciably accelerated, even though steel is relatively less noble than nickel (32). The results of an 11-year period testing of nickel-coated bars in a marine environment showed that the coating was effective in delaying, or sometime completely preventing, corrosion of the rebars (33). However, steel bars cladded with adequate thickness of nickel are still expensive. In addition, additional research is required to ensure their effectiveness as a corrosion protection system.
(1) Galvanized Rebars
Zinc-coated, or galvanized, bars are produced by a
hot-dip process, which consists of cleaning the steel by pickling
it and then immersing it in molten zinc. Galvanized bars are
typically dipped in a chromate bath to passivate the zinc surface
and prevent it from reacting with the hydroxide in fresh concrete.
Through this process, zinc is metallurgically bonded to the steel,
providing a coating (usually not less than 0.086 mm or 3.4 mils)
that is composed of an outer layer of pure zinc and a number of
transitional zones of zinc-rich alloys. Since galvanized bars are
commercially available, it was the subject of numerous laboratory
(32,36,37,38) and field studies (35,39,40). The laboratory results of the
performance of galvanized bars in concrete have been conflicting.
(Perhaps the conflict pointed to possible influence of experimental
techniques on the results and that there is a need to develop an
evaluation method that can be standardized.) For example, it was
found in one study that when concrete specimens were alternately
exposed to 4-percent NaCl in the stressed state, those reinforced
with galvanized bars cracked less and later than those reinforced
with black steel (38). In
another study, data obtained when lollipop concrete specimens were
partially immersed in saturated NaCl solution showed corrosion
began at roughly the same time for specimens made with galvanized
and with black steel, suggesting that there was no benefit from
galvanizing the steel bars (36).
A subsequent 10-year FHWA comparative testing of concrete slabs made with two different water-cement ratios and containing either conventional black steel or galvanized bars, wherein corrosion rate was estimated indirectly by measuring macrocell current between top- and bottom-mat bars, indicated that galvanized bars were subject to the same type of macroscopic corrosion as black steel bars (41). Furthermore, in concrete with 0.40 w/c, both the long-term exposure data and the rate-of corrosion data indicated that use of galvanized bars did not provide extra benefit over using black. However, in concrete with 0.50 w/c, when galvanized bars were used in both mats, the corrosion rate and the corresponding metal loss were about 30 percent and 22 percent, respectively, in comparison to black steel. (However, 86-percent reduction in corrosion rate and metal loss was achieved just by using black steel in concrete with 0.40 w/c.) And, in the same concrete, when galvanized bars were used only in the top mat, the corrosion rate was twice of that observed when only black steel was used in both mats. Essentially, these results suggested that the use of galvanized bars would not provide extra benefit over black steel bars, if water-cement ratio in the concrete is kept low. The results also pointed to the possibility of galvanic reaction between galvanized bars and black steel bars, when these bars are used in the same structure.
Field studies of the performance of galvanized bars in concrete structures exposed either to deicing salts or seawater have yielded conflicting results too. For example, accelerated field studies in Michigan over a period of six years have shown that galvanized bars will retard concrete delamination and spalling but will not prevent them, especially where cover over the reinforcement is shallow (42). Meanwhile, evaluation of salt-contaminated bridges that had been in service in Bermuda for up to 20 years noted no corrosion damage (43).
To resolve the discrepancy, a panel made a critical examination of literature on the performance of galvanized rebars from: (a) studies conducted in laboratory environment, (b) studies of model specimens exposed outdoor to either natural or artificial weathering, and (c) studies of reinforced concrete structures under service conditions (44). Briefly, the panel reported that these studies had found that:
Finally, based on the literature and the collective experience
of its members, the panel estimated that, for a new concrete bridge
deck with a 5.1-cm (2-in.) cover of 0.45 w/c concrete and assuming
that normal construction practices are used, the use of galvanized
steel bars may add 5 more years to the 10 to 15 years that is
typically required for corrosion-induced distress to be manifested
in unprotected bridge decks.
(2) Other Cladded Bars and Alternative Solid Metal Bars
With the ultimate goal of developing corrosion resistant
reinforcement that will result in a 75- to 100-year design life for
concrete structures, The FHWA sponsored a 5-year research project
to evaluate corrosion-resistant bars. As part of that project, 24
different bars of various types were tested with newly developed
accelerated tests that are considered to be more severe than most
available test procedures and much more severe than typical field
conditions (45). The 24 bars
included 14 ceramic-, inorganic-, and metallic-clad bars:
(2) Ceramic-clad bars (using a micro-infiltrated macro-laminated
coating),
(1) Inorganic zinc silicate-clad bar,
(1) Hot-dip galvanized bar,
(1) Zinc coated bar (using the Delot process),
(3) Zinc-rich cladded bars,
(1) Nickel-clad bar,
(1) Copper-clad bar,
(1) Copper alloy-clad bar,
(1) 304 stainless steel-clad bar,
(1) Galvalum (aluminum and zinc) clad bar,
(1) Reactive copper in an organic coating bar,
and 10 different types of solid metallic bars:
(1) Black bar,
(1) Titanium bar,
(1) Type 304 stainless steel bar,
(1) Type 316 stainless steel bar,
(1) Type 317 stainless steel bar,
(1) Type 304N stainless steel bar,
(1) Type XM-19 stainless steel bar,
(1) Nitronic 33 stainless steel bar,
(1) Corrosion-resistant steel alloy bar,
(1) Type C613000 aluminum bronze bar.
Initially, the 14 cladded bars, in both straight and bent forms, were tested for 28 days (in 112 cycles of 1.25 hours dipping in specified solutions and 4.75 hours drying in air) in two solutions (a 3-percent NaCl solution, which has a pH 7, and a solution of 0.3N KOH + 0.05N NaOH + 3-percent NaCl, which has a pH of 13). Both straight and bent bars were tested in three conditions: (1) as received, (2) with a 6-mm (0.25-in) hole intentionally drilled through the cladding, and (3) with cladding purposely abraded with black slag sprayed on the bars at a specified distance and then pressured for 5 minutes. Based on the polarization resistant data, along with visual examination of the condition of these 14 different cladded bars after 28 days of testing in the two solutions, the following five cladded bars were selected for additional testing:
These five cladded bars, along with the above-mentioned 10 different solid metallic bars, were further tested for longer periods and under more severe conditions. The very corrosive solutions and severe exposure conditions used sequentially in this test are tabulated in Table 6.
Table 6. Corrosive Solutions and Exposure Conditions
Test Order
|
Test Solutions
|
Test Duration
|
1
|
3 % NaCl (pH 7)
|
90 days
(360 cycles) |
2
|
3 % NaCl + 0.3N KOH + 0.05N NaOH (pH 13)
|
56 days
(224 cycles) |
3
|
9 % NaCI + 0.3N KOH + 0.05N NaOH (pH 13)
|
56 days
(224 cycles) |
4
|
15 % NaCl + 0.3N KOH + 0.05N NaOH (pH 13)
|
56 days
(224 cycles) |
The 3-percent NaCl solution was selected to provide the exposure to seawater that may be encountered by bars prior to installation into the concrete or at cracks after placement in concrete. So, after 90 days of exposure to this solution, the bars are subjected to a total of 168 days of additional exposure to the three more-severe solutions, thereby providing a total of 1,032 wet-and-dry cycles.
The measurements indicated that the polarization resistance of the black bars in the various NaCl solutions (at pH 13) averaged about 0.90, 0.51, and 0.26 ohm·m 2, respectively. These correspond to corrosion current densities of approximately 29, 50, and 100 mAm 2 (2.7, 4.7, and 9.3 mA/ft 2), respectively. Assuming that concrete cracking occurs after a metal loss of 0.0254 mm (0.001 in), the calculated metal losses for the current densities observed for the black bars at 56 to 168 day (d) accelerated tests indicated that the concrete could crack in 1 year or less.
Using the same assumption, the approximate time-to-cracking for concrete using the various reinforcements were predicted and shown in Table 7. And, based on review of the polarization resistance data and visual assessment for the 15 types of bars, the 10 best performing bars were determined to be: the 7 solid stainless steel bars, the stainless steel-clad bar, the aluminum bronze bar, and the titanium bar. However, after consideration of cost and other factors (including availability), only 4 bars were selected for additional testing, with 6 different epoxy-coated bars identified earlier. These 4 bars were the Type 304 stainless steel bars, the copper-clad bar, the galvanized bar, and a zinc alloy-clad bar (with a newer zinc alloy).
Type of Bars | Time-to-Cracking | |
Zinc-clad | slightly better or worse than black bars | |
Zinc alloy-clad bars | slightly better or worse than black bars | |
Copper-clad bars | @ 5 years | |
Stainless steel-clad bars | 23 to 50 years | |
Nitronic 33 bars | @ 100 years | |
Type 304 stainless steel bars
|
@ 100 years | |
I Type 316 sainless steel bars | @ 100 years | |
Titanium bars | @ 100 years |
The 10 different bars and an ASTM A615 black bar
(control), in both straight and bent shapes, were embedded in
cracked and crack-free concrete test specimens of 9 varied test
configurations, then subjected to in-concrete tests (46). As mentioned earlier, the final
report for this ongoing research will be available by December
1998.
(3) Cost Comparison Between Black Steel, Epoxy-Coated, Stainless
Steel, and Titanium Bars
As mentioned in an earlier section, selection of
materials is usually based on performance and cost. To demonstrate
that replacing black steel bars with the more expensive stainless
steel bars may not be that significantly more costly, FHWA
researchers used the actual 1994 costs associated with the
delivered on-site costs of black steel and epoxy-coated steel bars
at three bridge projects in Illinois, which were $0.44/kg
($0.20/lb) and $0.62/kg ($0.28/lb), respectively. And, according to
industrial sources, the corresponding prices for stainless steel
and titanium bars were approximately $2.60/kg ($1.20/lb) and
$13.20/kg($6.00/lb), respectively. Based on these costs and the bid
prices for the three bridges, the overall costs (including site
work and finishing) of the three bridges for using stainless steel
and titanium bars instead were estimated (Table 8). When these
costs were compared with those bid prices for using black steel
bars or epoxy-coated bars, it showed that use of stainless steel
bars would have increased the initial total project costs by only 6
to 16 percent; while use of titanium bars would have increased the
initial costs by 35 to 91 percent. Considering that use of
stainless steel rebars in these bridges may increase the
time-to-cracking of a concrete by 65 to 130 times, in comparison to
black steel and based on data obtained from ongoing tests of these
different bars in the pH 13 solution, the benefit-to-added cost
ratios would have to be considered very favorable (47). Similar test data for the titanium
bars indicated that its use would extend the time-to-cracking of
concrete by approximately 130 times, which would not provide a
benefit-to-added cost ratio as attractive as that for using
stainless steel bars.
Cost
of Rebar / Cost of Black Bar |
Total Cost with
Rebar / Total Cost with Black Bar |
|||
Bridge A
|
Bridge B
|
Bridge C
|
||
Black steel | 1.0 | 1.00 | 1.00 | 1.00 |
Epoxy-coated | 1.4 | 1.01 | 1.02 | 1.00 |
Stainless steel | 6.0 | 1.16 | 1.13 | 1.06 |
Titanium | 30.0 | 1.91 | 1.74 | 1.35 |
(4) Copper-Clad Steel Bars
Copper-clad reinforcing steel bar is another of the
metallic coated bars that were recently selected for additional
evaluation. This type of reinforcing bars was initially tested in
concrete in 1980 and 1984. In 1980, FHWA fabricated an extensive
series of large test concrete slabs that contained various types of
reinforcement—including black steel bars (in concrete with and
without admixed calcium nitrite), non specification epoxy-coated
bars, and copper-clad bars—and had various amounts of chloride
added to the top lift of concrete. Since then, these slabs have
been inspected several times (48). The conditions of these slabs at
different ages are shown in Table 9.
Slab Type | Age of the Slabs (years) | ||
2 | 7 | "120"> 13 | |
Black bars | Badly cracked and bars corroded |
----- | ----- |
Black bars and calcium nitrite | No cracks, but minor rust spots |
Fine to wide
cracks and some spalls |
----- |
Nonspecification epoxy-coated bars* | No cracks | Cracked and bars corroded |
----- |
Copper-clad rods— in both mats |
----- | ----- | No cracking |
Copper-clad rods— in top mat |
----- | ----- | No cracking |
Black bars | ----- | Severe cracking | Severe cracking |
As the inspection results indicated, the copper-clad bars were far more resistant to corrosion than any of the other types of bars in the identical test concrete slabs, and providing protection even better than calcium nitrite inhibitor. The slabs containing black bars started to crack severely after 2 to 7 years, even when the concrete had calcium nitrite. The slab reinforced with an epoxy-coated bar that had uncountable holidays and less than 0.80-percent damage performed better, but finally showed symptoms of corrosion after 7 years. The slabs containing copper-clad bars in both mats and in top mat only, were still in good condition after more than 13 years of outdoor exposure. It must be noted that the average total chloride contents in the slabs containing the copper-clad bars were between 8.50 to 10.32 kg/m 3 (14.33 to 17.40 lb/yd 3), which is at least 14 times of the corrosion threshold level. Examination of cores taken from these two slabs revealed that the cladded bars, with cladding thickness of about 0.5 mm (0.02 in.), had discolored the surrounding concrete to a gray-green color. Petrographic examinations indicated that there was significantly higher amount of unhydrated cement around the copper-clad bars—extending 0.25 to 0.5 mm (0.01 to 0.02 in.) into the concrete—than at other locations. It is well known that copper, lead, and zinc salts can be retard hydration of cement. Despite the presence of unhydrated cement, the cement paste surrounding the bar appeared to be sufficiently hard in the concrete.
These findings correlated well with the results from an earlier 1984 study, which involved 48-week cyclic wetting (in 15-percent sodium chloride solution) and drying tests of concrete specimens reinforced with copper-clad bars. The copper-clad bars showed similar good corrosion resistance—during the 48-week ponding test, none of the specimens that contained the copper-clad bars exhibited signs of chloride-induced corrosion activity. Similar to the 1980 study with the same type of bars, discoloration of the concrete and retardation of cement hydration in concrete surrounding the copper-clad bars were observed at the end of the testing. In addition, the copper cladding was generally blackish in color—probably the normal copper oxide film formed after the fabrication of the specimen.
Due to the exceptional corrosion resistance shown by copper-clad bars in these studies, along with successful performance of these bars in the recent 168-day screening tests that was described earlier, it was decided that these bars should be tested further in concrete. These tests, as mentioned earlier, are under way and the results will be available in December 1998. It is clear that this type of reinforcing bar has the potential of becoming a cost-effective option for corrosion protection system, since the cost of copper-clad bars could be under $1.20/kg ($0.54/lb). However, further study on the structural effect of the retardation of cement hydration is required, prior to using such bars in bridge structures.
4. Corrosion Inhibiting Admixtures
In the past decade, a promising new approach to controlling steel corrosion in concrete structures is the incorporation of a corrosion inhibitor in the concrete mixes. Corrosion inhibitors are materials, both inorganic and organic, that are added to water or other liquids or gases in small amounts to reduce or completely stop corrosion. Inhibitors have been classified in many ways, including by composition and mechanism of action. Substances that retard corrosion by forming protective precipitates or by removing an aggressive constituent from the environment are also considered as inhibitors. The mechanism of inhibition is often complex and varies according to the type of inhibitors. For simplicity, the major inhibitor classifications are:
With the widely marketed calcium nitrite, inhibition occurs only at addition dosage that is sufficiently high to counteract the effect of chlorides. In addition, this inhibitor is water-soluble and is, therefore, subject to leaching from concrete and hence would become less effective after some time. Some of the inhibitors may cause adverse effects in concrete, such as low concrete strength, erratic setting times, efflorescence, and enhanced susceptibility to alkali aggregate reaction. Finally, the real long-term benefit provided by these materials in concrete - the commercial corrosion inhibitors in particular - remains uncertain. Despite the risks and uncertainty, the use of corrosion inhibitors, both inorganic and organic, as admixtures for the corrosion protection of steel in reinforced and prestressed concrete has increased in the last fifteen years. A recent survey (49) indicated that, at present, there are four commercial corrosion inhibiting admixtures. These are:
2 Fe ++ + 2 0H - + 2 NO 2 - 2 NO + Fe 2O 3 + H 2O |
(14)
|
The bulk of the performance data for these corrosion inhibiting admixtures are obtained mostly from laboratory tests conducted by their manufacturers - using simulated environment and/or small concrete specimens; the rest come from investigations conducted by FHWA, some of the state transportation agencies, and the academia. Most of these data pertain to DCI, because this commercial inhibitor was introduced in 1978 while the others were introduced in the last five years. Due to the long time required to assess their performance and the lack of follow-up studies once a structure is built, field performance data on any of these admixtures are still very limited. Therefore, it is not yet possible to accurately define the actual benefits that can be expected from the use of a specific corrosion inhibiting admixture other than to state that delay of corrosion initiation is anticipated.
Investigations of the use of corrosion inhibitors in concrete
started in the 1960s and included sodium nitrite, and the sodium
and potassium salts of chromate and benzoate. It was found that the
sodium and potassium salts of chromate and benzoate gave mixed
results on inhibition and reduced concrete strength. In one early
study, it was shown that nitrite and chromate were effective
inhibitors (51). A subsequent
study indicated that only sodium nitrite was effective but it
exhibited deleterious effects on the strength of the concrete
(52). In the late 1970s,
calcium nitrite was introduced commercially as an alternate form of
nitrite (53).
In 1980, the FHWA began an outdoor exposure study to assess the effectiveness of calcium nitrite as an admixture for inhibiting steel corrosion in concrete (54). Eighteen reinforced concrete slabs (0.6 m x 1.52 m x 0.15 m) were built to simulate bridge decks using bared black steel bars. Of these slabs, 13 slabs contained various amount of admixed chloride and 2.75-percent calcium nitrite (by weight of cement) in the top lift and 5 control slabs without admixed nitrite. These slabs were tested by periodic measurements of macro-cell corrosion current, half cell potential, driving voltage (i.e., potential difference between the top- and bottom mat reinforcing steel), and concrete electrical resistivity (i.e., resistance between the top and bottom mats), as well as visual inspection. Based on data at the time, it was concluded that:
However, after testing of the same 18 concrete slabs were continued for 7 years, it was found that calcium nitrite was effective in reducing the rate of corrosion of black steel up to a [Cl-] /[NO-] of only 0.90, instead of the higher [Cl-] /[NO-] of 1.79 indicated earlier (55). In fact, the slabs fabricated with higher ratios, even up to only 1.11, showed some cracking and rust spots on their surfaces after 7 years, despite exhibiting a reduction in corrosion current by a factor of 10. Since the chloride and the nitrite were added at the same time when the test slabs were being fabricated, it is reasonable to assume that a [Cl-] / [NO-] higher than 1 may still be able to suppress steel corrosion, if the chloride ions penetrates instead naturally into the concrete as in a structure. However, the researcher still recommended that, if selected as the protection system in a new construction, sufficient quantity of calcium nitrite should be added to the fresh concrete mix so that the [Cl-] / [NO-] will not exceed 1.0 at the level of steel—throughout the expected design life of a structure.
Recently, several new inhibitors and the first three commercial inhibitor admixtures were examined in a preliminary study of inhibitors conducted in Virginia (56). Using electrochemical impedance spectroscopy and visual observation, the investigators measured and ranked the overall inhibition performance of these inhibitors in simulated pore solution. It was determined that the top three inhibitors were barium metaborate, disodium -glycerophosphate, and one of the commercial inhibitors. A follow-up study is under way to allow: (a) additional testing of these inhibitors in concrete to determine if their use has any adverse effects on setting and other properties of concrete, (b) development of an unique method of inhibitor delivery for alleviating such adverse effects, if there is any, and (c) expansion of the search to other new inhibitors (57). Another study is under way in Florida to (a) evaluate the ability of commercial inhibitors to stay in the concrete, which would influence their effectiveness, (b) estimate the long-term effectiveness of inhibitors, (c) determine possible adverse side effects on the corrosion process and the concrete properties, (d) quantitatively assess extension of concrete durability, and (e) establish their suitability for applications in new construction and in rehabilitation (58).
Recently, the commercial inhibitors—particularly the first three products—have been promoted for use in repair of corrosion-damaged concrete in bridges, either by: (a) addition as admixture to patching concrete, (b) spray application onto affected areas, or (c) saturation treatment to affected areas. Unfortunately, data on the effectiveness of this approach of using inhibitors are relatively limited. Therefore, an on-going study in Virginia is attempting to develop some data from actual bridge rehabilitation projects and concrete slabs fabricated to simulate bridge situations for assessing the effectiveness of these commercial inhibitors when used in rehabilitation (59).
Due to lack of widely accepted standard evaluation test that can truly be applied to all types of inhibitors, regardless of their inhibition mechanisms, comparison of the effectiveness of different inhibiting admixtures present difficult challenges. It's likely that a system of different acceptable tests would have to be developed. Furthermore, the effectiveness of all inhibitors should be evaluated based on per unit weight of the active ingredient(s) - the commercial corrosion inhibiting admixtures in particular. Unfortunately, most of the manufacturers are reluctant to share information on the compositions, or even just the concentrations of the active ingredients, of their products with the users.
In summary, corrosion inhibitors are increasingly being employed as a part of multiple corrosion protection systems in conjunction with epoxy-coated rebars and low-permeability concrete. As yet, epoxy-coated seven-wire strands are not usually employed for prestressed concrete bridge members. In lieu of coated seven-wire strands, corrosion inhibitors have found their niche in the prestressed highway construction industry. In addition, corrosion inhibitors are finding use in cementitious grouts for filling the post-tensioning ducts of bridge members or the sheating of cable stays to protect the highly tensioned and uncoated black steel. Due to the premature failure of epoxy-coated rebars in the splash zone of piles on the Florida Keys bridges, some state highway agencies are relying on corrosion inhibitors as one of the alternative corrosion protection systems for marine application. For bridge deck exposed to excessively aggressive environment, the use of a corrosion inhibitor, in conjunction with ECR, as a redundant corrosion protection system, can enhance the service life of a structure with respect to corrosion. (Industry-sponsored research is under way on the combined use of ECR and corrosion inhibitors as a dual corrosion-protection system for bridge decks.) In addition, the corrosion inhibitors can play an important role in protecting uncoated high-strength steel in PS/C bridge members and cable-stayed bridges. Research is continuing to identify other corrosion inhibitors that will provide long lasting corrosion protection to bridge members.
5. Corrosion Protection of
Prestressed Concrete Bridge Members
In the fall of 1992, the United Kingdom Ministry of Transportation imposed a temporary ban on the commissioning of grouted, bonded post-tensioned bridges. This resulted from the collapse of two footbridges in 1960, the collapse of a single-span, segmental post-tensioned bridge in Wales in 1985, and an examination of nine other segmental bridges. United Kingdom is not the only place with problems of voided ducts and insufficient coverage over prestressing steel in ducts, as evident by the collapse in 1992 of the post-tensioned Melle Bridge across the Schelde in Belgium, which was constructed in 1956. This last failure was traced to the corrosion of the ducted post-tensioning wires even though the bridge had been inspected, load tested, and rated satisfactorily. The UK moratorium was lifted in 1996 with the publication of advisory report "Post tensioned Concrete Bridges: Planning Organization and Methods for Carrying Out Special Inspections" by the construction industry and owners of this type of bridges.
The underlying difficulty is that there are no reliable, cost-effective, and rapid nondestructive methods for providing assurance to the owners that the built structures have met the construction specification. One of the major inspection concern is determining whether the ducts in the post-tensioned bridge members have been completely filled with the grouts and that there is uniform coverage over the prestressing steel. It has been found many times that, invariably, the ducts had big voided sections and were filled only partially. In addition, it is very difficult to assess the condition of anchorage areas.
Chloride-bearing water can find its way through anchorage into the ducts and eventually initiate corrosion at the anchorage and subsequently of the prestressing steel inside the ducts, especially if the ducts have voids and are partially filled. The salty water can also access the ducts through faulty and leaky joints. In time, the chloride ions also penetrate through concrete cover and corrode the prestressing steel in the ducts, either after the corrosion of the metallic ducts or through defective plastic ducts. Beside causing pitting of the prestressed strands, corrosion reactions lead to the evolution of atomic hydrogen, which is subsequently absorbed into the steel leading to hydrogen embrittlement of the steel. This embrittlement can cause the strands to fail much more readily under normal loads. Since prestressed concrete bridge members rely on the tensile strength of the strands to resist loads, loss of even few strands per member can prove catastrophic. In addition, due to the high stresses the strands are subjected to, corrosion effects are accelerated. Even though corrosion initiate on prestressed steel in the same manner as on mild reinforcing steel, there is one significant difference between the two: since prestressed wires have smaller cross sections than rebars, sections of prestressed wires are more readily broken or completely rusted away.
Corrosion protection methods adopted at present in the construction of prestressed concrete members included: (1) the use of highly impermeable concrete through the use of fly ash and silica fume and controlled curing at the fabrication site, and (2) the use of corrosion inhibitor admixtures. The use of epoxy-coated steel is not yet common in prestressed concrete members and research on this application of coated strands is needed.
The main thrust of FHWA field and laboratory investigations in this area of prestressed concrete consisted of the following:
Many problems associated with deterioration of prestressed concrete members can be traced to improper designs in a structure. To help identify some common examples of improper design, a total of 17 prestressed concrete bridges were surveyed between 1988 and 1992 and the collected data were analyzed (60,61). Built between 1954 to 1979, eleven of these bridges were pre-tensioned and six were post-tensioned—with some of the bridges containing both types of members. These bridges were located both in northern climates exposed to application of roadway deicing salts and in southern climates exposed to seawater spray. The procedures used in the examination included: visual examination, concrete delamination survey, chloride content survey, concrete cover survey, half-cell potential survey, rapid chloride permeability, and petrographic and metallurgical analysis of the prestressed steel.
The detailed examinations of these bridges revealed that, since most common sources of chlorides in concrete in the substructures are water running from bridge decks and spray from seawater, the corrosion of prestressed steel observed in these bridges was due commonly to one or more of the following causes:
Overall, the conditions of the bridges surveyed were judged to be adequate. And, to add to the durability of these types of concrete structures located in adverse environments, the following recommendations were made for:
Finally, the researchers emphasized that routine inspection and proper maintenance are extremely important in eliminating major deck-to-steel water routes for prestressed substructure concrete elements.
b. Laboratory
Investigation
(1) Corrosion-Resistant Grouts
Grout is the final line of defense against corrosion of steel tendons. Based on review of state highway agencies' specifications on grouts, it was determined that the design mixtures were inadequate and that there was no suitable method for evaluating the corrosion performance of grouts before their use in the field. Hence a study was initiated with the following objectives: (1) to develop new mixture designs, and (2) to develop and perform accelerated test methods on the new grouts. In this study, in addition to varying w/c, several modifiers and additives for grouts were examined, including high-range water reducers, fly ash, silica fume, latex-polymer modifier, expansive agents, anti-bleed additives, and corrosion inhibitors (62,63,64,65,66).
A large number of grout design mixtures were tested with an accelerated corrosion test method (ACTM). ACTM uses a test specimen that simulates a post-tensioning strand embedded in grout, but with a section of duct missing (representing a break in the duct). Other features of the test included minimal cover on the tendons, a 5-percent sodium chloride solution in direct contact with the grout, and forcing of chloride ions through the grout by an applied voltage. The study resulted in the following conclusions:
In summary, use of fly ash or silica fume, in conjunction with proper dosage of a corrosion inhibitor with a suitable anti-bleeding agent, can provide a grout which can protect the prestressing steel even if it is contained in defective ducts. Based on these recommendations, the Post-Tensioning Institute has written a grouting specification, which will be published in 1998.
(2) Inspection of Grout Cover Over Prestressing Steel and
Voids in the Ducts
Prior to the discovery of problems with grouting of ducts in existing prestress sing concrete structures in UK and other parts of the world, little attention was given to this subject. Review of literature offered the following relevant techniques:
Neither of these techniques are widely used in the United States, if at all, because the first two are destructive and the third technique, even though it is nondestructive, involves a bulky equipment and is expensive. Hence, FHWA initiated a research study to develop an equipment which is in the range of $15,000 to $25,000 and also not bulky. After completion of the first phase of this study, the impact-echo technique was selected for further evaluation and development, since it showed the most promise (66,67).
In this method, a short-duration stress pulse is sent through
the duct location under inspection by striking the outer concrete
surface. The reflected pulses are received by a transducer (which
is in close proximity to the impactor) and is displayed on a
computer screen as a frequency spectrum. The frequencies of the
pulses reflected from a voided and/or partially filled duct are
much lower than those reflected from a filled duct. This technique
has been successfully used on a few bridges. The concrete cores
taken from the suspected locations showing lower frequency had
either a void in the duct or honeycombing around duct area. The
correlation between the nondestructive impact-echo technique and
the destructive examination of concrete cores was excellent.
B. Corrosion Control for Rehabilitation
of Existing Concrete Structures
There are different remedial methods that can be applied, as part
of rehabilitation of existing concrete structures, for controlling
chloride-induced reinforcing steel corrosion. Each of the methods,
which are used after all damaged concrete in a structure have been
removed and patched, functions by one of the following
principles:
1. Conventional Rehabilitation
Methods
Methods that function by the first approach—such as application of
an overlay of polymer concrete, low slump concrete, latex modified
concrete, or high density concrete, on the existing
concrete—provide a barrier that prevents continued intrusion of
additional harmful chloride ions, moisture, and oxygen that are
needed to sustain corrosion. In some cases, these methods have
successfully extended the useful life of a structure. However, past
experiences have also indicated that when such measures were used,
without first decontaminating the existing concrete of the
necessary corrosion ingredients, it was often that these substances
become entrapped (in the old concrete) by the overlays in
sufficient amounts to initiate new corrosion. Furthermore, the
ensuing corrosion is often worse than before rehabilitation, due to
arising electrochemical incompatibility between the new patching
concrete and the surrounding old but physically sound concrete
(68). The following is a brief
summary of work performed on measures belonging to approach
one.
FHWA undertook a long-term staff study in the 1980s to evaluate the effect of various conventional repair systems on the rate of corrosion of reinforcing steel (69). It had been debated whether the overlaying of a bridge deck with a relatively impermeable concrete or membrane would sufficiently arrest the corrosion to effect a permanent repair. The following overlays were placed on chloride-contaminated reinforced concrete slabs and tested:
The concrete specimens were 1.2-m-wide x 1.5-m-long x
0.152-m-thick (4-ft. x 5-ft. x 0.5-ft.) slabs that were fabricated
in 1971 using a top-mat reinforcing steel only. These slabs were
subjected to daily salting for 8 years. All of the slabs in this
phase of the study were fabricated using concrete with a 0.5 w/c
and 25.4 mm (1.0 in) of clear concrete cover over the reinforcing
steel, and exhibited some corrosion-induced concrete distress.
Measured electrical potentials indicated the presence of corrosion
on the rebars in all slabs. In order to make the slabs more closely
simulate a bridge deck, a 63.5-mm (2.5-in) layer of chloride-free
concrete containing a mat of reinforcing steel was placed on the
bottom of each slab. Prior to concrete placement, the old bottom of
each slab was sandblasted to exposed coarse aggregate. Care was
exercised to insure the new bottom mat of steel was not
electrically continuous to the top mat or bar chairs. Then lead
wires were attached to the bottom-mat rebars and run outside the
slabs. Other instrumentation at the bottom-mat level included
thermocouples, and 152 mm x 50.8 mm (6 in x 2 in) copper mesh,
which is used for measurements of concrete resistivity. The mix
design and aggregate sources for the bottom-lift concrete were
identical to that used for the original slabs. After concrete
placement and 14 days of wet burlap curing, the sides were recoated
with epoxy paint and the slabs were placed on 0.9-m (3-ft) posts.
Six months of outdoor storage was used to re-establish a normal
moisture gradient within the 0.216 m (8.5 in) simulated bridge deck
sections.
Instrumentation was installed within each slab, at the top-mat
rebar level, via slots cut into the surface. This included
resistivity mesh positioned above that placed in the bottom lift,
one or two rate-of-corrosion probes, thermocouples (at the top-mat
rebar level and at the slab mid-depth), and new lead wire
attachments to each top-mat rebar. Slot patch concrete had a 0.50
w/c and utilized aggregates from the same sources as the original
concrete and contained chloride at a concentration of 11.9 kg/m
3(20 lb/yd 3). This chloride level was used
because sampling indicated this to be the average chloride content
which had penetrated to the top- mat rebar level during 8 years of
daily salting. An instrumentation interface box was attached to the
side of each slab and switch-wired in such a manner to permit the
following measurements:
Following these measurements, the switch on each slab is
deactivated and the following measurements are made as rapidly as
possible:
After all these measurements, the couple switch on each slab is then reactivated and exposure of each specimen continues.
The major evaluation criteria in the testing are the macrocell corrosion current flow, between the top- and the bottom-mats of rebars in each slab, and the changes in current with time on each rehabilitated slab. The basis for comparison is the change on the slabs subjected to delamination repair only. By calculating a corrosion current ratio, defined as the 21 °C (70°F) corrosion current (at time x after rehabilitation) divided by the same corrosion current before rehabilitation of each slab, increases or decreases in corrosion rate can be monitored. Thus, a ratio of 1.0 indicates no change, while a value greater than 1 denotes an increase, and a value less than 1.0 denotes a decrease, in corrosion rate.
The corrosion current data on all rehabilitated slabs is summarized in Table 10 and can be used to define general trends. In the tabulation, are the 21°C (70°F) corrosion current ratio data for each test slab at approximately 0.4, 1.0, 1.4, 2.1, 3.1, and 4.1 years after rehabilitation, and averages for each variable.
Conventional Treatment | 21°C Corrosion Current Ratio, Years After Rehabilitation | |||||
0.4y | 1.0y | 1.4y | 2.1y | 3.1y | 4.1y | |
Patch delaminations only | 0.96 | 1.17 | 0.85 | 1.04 | 1.08 | 0.79 |
Latex overlay (cracked) | 0.88 | 0.81 | 0.59 | 0.77 | 0.93 | 0.98 |
Latex overlay (uncracked) | 0.73 | 0.81 | 0.57 | 0.69 | 0.73 | 0.68 |
Concrete overlay (0.32 w/c) | 0.91 | 0.84 | 0.67 | 0.73 | 0.79 | 0.91 |
Concrete overlay (0.45 w/c) | 1.00 | 0.78 | 0.55 | 0.61 | 0.52 | 0.54 |
Internally Sealed Concrete | 0.85 | 0.83 | 0.45 | 0.48 | 0.56 | 0.51 |
Preformed membrane and AC | 0.92 | 0.94 | 0.81 | 0.79 | 0.73 | 0.57 |
Thin latex/fabric overlay | 1.02 | 1.19 | 0.97 | 1.14 | 1.31 | 1.41 |
Polymer concrete (vinyl) | 0.79 | 0.88 | 0.78 | 0.98 | 0.99 | 1.06 |
Polymer concrete(MMA) | 1.26 | 1.67 | 1.61 | 2.02 | 2.26 | 1.89 |
Polymer concrete (polyester) | 1.40 | 1.36 | 1.42 | 1.76 | 1.88 | 1.52 |
Silane treatment | 0.88 | 1.29 | 1.09 | 1.29 | 1.23 | 1.15 |
The data for each time period after rehabilitation are the
average of at least three separate measurements and up to 2 slabs
were used for each treatment. These data indicated that none of the
overlays, membranes, or sealers completely stopped corrosion of the
rebars in the underlying salty concrete. Finally, rust stains,
cracks, and delaminations appeared on almost all the slabs at only
4 years after rehabilitation, even though this testing was not
accelerated. This indicates that such repair procedures are not
permanent.
Traditionally, greater than 90 percent of the rehabilitation jobs
used low-w/c concrete or latex overlay as the preferred method. A
Strategic Highway Research Program report estimated the life of
this rehabilitation method as about 30 years; however, state
highway agencies believe it is somewhere around 15 years.
2. Cathodic Protection
Corrosion control measures such as cathodic protection, either by
impressed-current or galvanic mode, function by the second
approach. Their advantage is that the control of electron of
electron flow overrides any tendency of the steel to corrode again
because of electrochemical imbalances in the concrete. Removal of
chloride ions from the concrete by electrochemical means belongs to
the third approach.
The science of cathodic protection (CP) was born in 1824, when Sir Humphrey Davy made a presentation to the Royal Society of London: "The rapid decay of the copper sheeting on His Majesty's ships of war, and the uncertainty of the time of its duration, have long attracted the attention of those persons most concerned in the naval interest of the count. ... I entered into an experimental investigation upon copper. In pursuing this investigation, I have ascertained many facts ... to illustrate some obscure parts of electrochemical science... seem to offer important application." Davy succeeded in protecting copper against corrosion from seawater by the use of iron anodes. From that beginning, CP has grown to have many uses in marine and underground structures, water storage tanks, gas pipelines, oil platform supports, and many other facilities exposed to a corrosive environment. Recently, it is proving to be an effective method for protecting reinforcing steel from chloride-induced corrosion.
The Pourbaix diagram, a thermodynamic diagram of electrical potential versus pH, for iron pointed out that iron is immune to corrosion if its potential is more negative than in any naturally occurring condition, regardless of pH (70). The iron or steel can be made to be sufficiently electronegative by installing a suitable external electrode (anode) on the surface of or in the concrete, the electrolyte, and passing a current (of sufficient magnitude) from that electrode through the concrete to the embedded steel, which all become the cathode. There are two methods of supplying the required cathodic protection current: (a) by using an external DC source and connecting the anode to its positive terminal and the steel to the negative terminal, therefore called the impressed-current cathodic protection, and (b) by using an anode made of a metal or an alloy that is sufficiently more reactive or anodic than steel (such as magnesium, zinc, and aluminum) so that when this anode is electrically coupled to the steel, the sacrificial anode corrodes and gives away electrons, which flow to and protect the steel, therefore called galvanic cathodic protection.
Each method of applying cathodic protection has its own characteristics that make it more applicable to a particular situation and, therefore, more advantageous than the other. Table 11 provides a comparison of those characteristics.
Impressed-Current CP | Galvanic CP |
External power required | Requires no external power |
Driving voltage can be varied | Fixed driving voltage· |
Current can be varied | Limited current |
Can be designed for almost any current requirement | Usually used where current Requirements are small |
Can be used in any level of resistivity | Usually used in low-resistivity Electrolytes |
Protection of reinforcing steel from further corrosion in existing concrete bridge members can be achieved by either method, which one is more effective depends on the environment surrounding the structures.
Regardless of the method of CP used, it is critical to select
the right anode, to determine the right amount of current or
potential to apply to ensure that the steel is adequately
protected, and to ensure that the protection current is applied
uniformly across the structure being protected. Therefore, a
considerable portion of FHWA research efforts was focused on the
identification or development of the most suitable and durable
anodes for use in the cathodic protection, either by the
impressed-current or the galvanic mode, of each type of concrete
bridge members and for the different types of environment that can
surround that type of concrete members.
a. Impressed-Current CP of Concrete
Bridge Decks
To install an impressed-current cathodic protection system, a few
basic components are required, in addition to the reinforcing steel
and the concrete in the structure to be protected:
Among these components, the anode system is probably the most critical. For use on bridge decks, an anode system must have the following characteristics:
Since the first application of CP in 1973 in a bridge deck in
California, which was an impressed-current system using an
electrically conductive Coke-asphalt concrete overlay as an anode,
other anode systems have become available. The following is a
discussion of these various anode systems for bridge decks.
(1) Coke-Asphalt Anode System
In that first CP system for concrete bridge deck (71), a number of high-silicon cast iron
disks were secured (with epoxy) on the deck to function as the
primary anodes. Then, each primary anode was connected to a header
cable back to a rectifier. To facilitate the distribution of the
protection current across the deck and also extend the life of the
cast-iron primary anodes, a 50-mm (2.0-in) thick layer of a
secondary anode system—a conductive coke-asphalt mix—was placed
over the cast-iron anodes and the entire deck, then covered by a
nominal 50-mm (2.0-in) thick wearing course for a total thickness
of about 100 mm (4 in). The conductive coke-asphalt mix, which
resembled a typical asphalt mix, was developed from combination of
asphalt and metallurgical coke breeze (in place of conventional
aggregates). The coke breeze, which is high in carbon content, is a
good conductor of electrical current but is weak structurally. That
is why a strong surface wearing overlay made of conventional
asphalt concrete was necessary. Unfortunately, this conductive coke
asphalt anode system still exhibited some structural degradation
after being in service.
To increase the stability and resistance to traffic loading of
this conductive coke-asphalt mix, the Ontario Ministry of
transportation and Communications modified it by addition of some
conventional aggregate (72).
This anode system is relatively inexpensive and had functioned
effectively in several CP systems built in California and Canada.
However, it has some disadvantages: (a) it adds dead load to a
structure, (b) it requires the modification of expansion joints,
drains, curbs, and approaches to accommodate the overlay system,
(c) the uncertain durability of the entire overlay system, and (d)
the risk of entrapping moisture under the overlay, which can lead
to freeze and thaw deterioration of improperly air entrained
concrete. These had briefly prevented wide acceptance of CP as an
effective corrosion controlling method in rehabilitation of
existing bridge decks.
(2) Non-Overlay Slotted Anode System
In 1980, a new method of distributing the protection current over a
bridge deck was introduced. In this system, the old disk anodes
were replaced by platinized niobium-copper wires laid in saw slots
spaced regularly across the concrete surface and covered with grout
(73). To provide an
electrically conductive grout for grouting the saw slots,
researchers in FHWA developed a conductive polymer concrete, made
of vinyl-ester resin and carbon black (74). This material had a resistivity of
less than 10 ohm-cm and a 4-hour compressive strength in excess of
4,000 psi. The development of this non-overlay slotted anode system
contributed to significant advancement in CP of concrete bridge
decks by eliminating the need for a thick overlay system of
conductive asphalt concrete and asphalt wearing course, and thereby
making it easier to install CP systems on bridge decks with minimal
traffic interruption.
Following this development, one of the first impressed-current CP systems to utilize this non-overlay slotted anode system was built on a bridge deck in Buckingham County, Virginia, in 1983 (75). This CP system was designed in such a manner that the protection current was supplied by a rectifier to each of the three spans of the bridge deck by two primary anodes—0.78-mm (0.031-in) diameter Pt-Nb-Cu wires—that were laid transversely in the deck. Then the current was distributed longitudinally over each span by secondary anodes made of less expensive carbon strands that were spaced at 30.5 cm (1 ft) intervals across the width of a span. Both the primary and the secondary anodes were set in saw slots approximately 13 mm (0.5 in) wide and 19 mm (0.75 in) deep, and filled with the conductive polymer grout. This CP system functioned reasonably well at a constant current density of approximately 17 mA/m 2(1.6 mA/ft 2). Other CP systems of basically the same design were subsequently constructed in few other states, and those systems had also performed as expected. Unfortunately, the conductive grout was found to be susceptible to degradation arising from attack by acids that are produced by anodic reactions such as:
2 H 2O + 2 Cl - 4 H + + 2 OCl - + 4 e - |
(15)
|
4 Cl - Cl 2 + 4 e - |
(16)
|
2 H 2O 4 H + + O 2 + 4 e - |
(17)
|
Such acid attack was expected to be concentrated at the
grout/concrete interface, because of the concentration of
electrically charge or current at that interface. In fact, symptoms
of this degradation—such as discoloration of the concrete at the
end of the slots, at stress cracks, and at the boundary of concrete
patches—became evident after 1 to 2 years of the operation of the
first system in Buckingham County, Virginia, and the second system
built on the deck of the Interstate Route 64 over 13 th
View Street in Norfolk, Virginia (76). This acid attack, when compounded by
normal traffic impact and thermal stresses at that interface, can
eventually cause some of the conductive grout to eventually become
disbonded from the decks. Incidentally, this system is reasonably
efficient, as indicated by the relatively low average circuit
resistance of the latter installation, which was approximately 1.0
ohm (76). Other disadvantages
with this non-overlay slotted anode system were the added cost
associated with cutting 19-mm (0.75-in) deep slots into the
concrete decks, which may exposed many steel bars in many decks
that have shallow concrete covers.
(3) Conductive Polymer Mound Anode System
The excellent strength of the FHWA conductive polymer concrete allowed the development of another concept of anode system: the distributed anodes with non-conductive, rigid overlays. This system was also called "strip or mound system," because the Pt-Nb-Cu wires and the carbon strands are placed directly on the surface of the decks, instead of in saw slots, in the same grid system used in the slotted system. Each of the anodes is then covered or mounded with just enough amount of the conductive polymer concrete. The mound is typically 33 mm (1.25 in) wide and 12.5 cm (0.5 in) high. Before the polymer concrete has cured, calcined petroleum coke breeze is broadcast over the mounds to provide a good bonding surface and increase conductivity to the rigid concrete overlay (of either Portland cement concrete or latex-modified concrete) that is eventually placed on the entire deck.
This system provides slightly higher anode/surface area than the
slotted anode system. It's installation is easier and compatible
with existing concrete overlay field practice and requires only
minor additional construction procedures. Unfortunately,
significant stresses in the concrete overlay directly above the
anode mounds caused the overlays to crack in several such
installations (77).
(4) Conductive Polymer Anode Overlay
With the objective of developing another viable anode system that
can be applied directly on a deck without requiring the deck to be
scarified first, the FHWA investigated the possibility of
developing a multi-layer, resin-filled overlay system in which the
first two or three layers are made electrically conductive by using
conductive fillers and aggregates, while the surface layer used
conventional aggregate to impart a high degree of skid and abrasion
resistance (78). Eighteen
different resins and 16 different conductive fillers were examined
to determine what combinations of resin and filler and ratios would
produce composite systems with desirable electrical and physical
characteristics (electrical resistivity and durability, thermal
coefficient, compressive strength, shear bond strength (with
concrete), flexural strength, freeze-thaw durability, and gas and
water permeability). This preliminary screening identified 8 resins
(3 ortho-phthalic polyester, 3 iso-phthalic polyester, and 2 vinyl
ester resins) and 1 conductive filler (calcined coke breeze) for
extensive evaluations.
In the subsequent phase of the study, the most promising premixed and built-up overlay systems made from the selected 8 resins and filler were further evaluated, with emphasis on the compatibility of the overlay systems with Portland cement concrete and their performance in a CP system. In addition, the weatherability characteristics of systems made from three (2 ortho-phthalic polyester and 1 vinyl ester) resins were evaluated outdoor. The results revealed that, for an overlay to be used in conjunction with a CP system for bridge decks, a premixed conductive polymer would be more promising than a built-up polymer system, because the inherent physical and mechanical weaknesses of built-up overlay systems lead to early deterioration (by about 31 to 40 percent) of the initial bond strength—after only 6 weeks to one year under CP. Furthermore, the premixed overlays have some advantages over a built-up overlay:
Although the premixed overlays exhibited slightly higher electrical resistivities than built-up overlays, they were still in the desirable range of 3 to 10 ohm-cm. Their average initial bond strenght was approximately 6.90 MPa (1000 psi).
A field study was then undertaken to test this developed premixed polymer concrete overlay on a concrete bridge deck. Through experimentation, it was identified that material formulations consisting of either Hetron Q6305, a modified vinyl ester resin (manufactured by Ashland Chemical Co.), or Polylite 32-044 (from Reichold Chemical Co.), a 50-50 (by weight) aggregate mixture of calcined coke-breeze and crushed basalt or silica sand, a promoter, an initiator, and some suitable coupling, and wetting agents, would yield overlay systems with good combination of bond strength, flexural strength, compressive strength, shrinkage, wear resistance, and electrical conductivity (79). These two formulations, in the proportion of 55.3 kg (122 lb) of aggregate blend per 9.5 l(2.5 gal) of the resin blend, were used separately to build sections of 12.7-mm (0.5-in) thick overlay and tested in conjunction with a CP system for a bridge deck in Virginia (Table 12).
Span/Lane | Aggregate Blend (% wt) | Resin Blend (% wt) |
1,2,3 / EBL
|
Calcined coke breeze 49.26 Silica sand 49.26 Wetting agent (S440) 1.07 Initiator (BZP-C50X) 0.41 |
Hetron Q6305 vinylester 98.62 Dimethylanaline, promoter 0.39 A-174, silane coupling agent 0.99 |
1,2,3 / WBL
|
Calcined coke breeze 49.26 Crushed basalt (1/8 in max.) 49.26 Wetting agent (S440) 1.07 Initiator (BZP-C50X) 0.41 |
Polylite 32-044 98.0 Cobalt naplithenate, promoter 0.5 A-174, silane coupling agent 1.0 5-440, wetting agent 0.5 |
The cost of the CP system (including the design, the overlays, etc.) was about $180/m 2 ($17.79/ft 2). During the first several months of operation of the CP system, which covers 6 different zones (according to number of spans and lanes), the CP current density was set at 10 mA/m 2(1 mA/ft 2). In general, as indicated by the results of depolarization testing conducted on December of 1987 (Table 13), the CP system, with the electrically conductive polymer overlays serving also as the secondary anode, was providing sufficient protection to the steel bars.
Throughout the first 15 months of operation, the currents required in the six zones averaged 4.24 A and the corresponding driving voltages averaged 3.04 V - indicating that the conductive polymer overlay is a highly efficient secondary anode system. In terms of anode current density required in the six zones, it averaged 0.09 mA/m 2(1.05 mA / ft 2). Depolarization tests conducted on 05-03/89, i.e., after 15 month of operation, indicated that the system was providing good protection to the rebars (Table 14).
Zone (Span / Lane) |
Depolarization (mV) | ||
Min.
|
Max.
|
Mean
|
|
A/WBL | 144 | 319 | 202 |
B/WBL | 222 | 503 | 331 |
C/WBL | 141 | 565 | 278 |
A/EBL | 39 | 231 | 165 |
B/EBL | 102 | 364 | 228 |
C/EBL | 45 | 324 | 206 |
Zone | Depolarization (mV) | |
4-h | 24-h | |
A/WBL | 104 | 182 |
B/WBL | 112 | 211 |
C/WBL | 136 | 214 |
A/EBL | 420 | 503 |
B/EBL | 394 | 473 |
C/EBL | 286 | 366 |
Within less than a year after construction, the conductive
overlay on the east-bound lane (EBL) was completely replaced with
the same resin formulation used in the west-bound lane (WBL). After
approximately 19 months of service, it was found that the WBL and
the EBL had 3 percent and 5 percent, respectively, of delaminations
in the overlays. Skid tests conducted on the overlays indicated
that after 2 years of service, the skid numbers obtained were good.
Based on the field evaluations, it was concluded that the overlay
system appeared to have good potential as a secondary anode for CP
system. However, with only 18 months of service, the investigators
were not able to extrapolate the service life of this anode system.
It was believed that the overlay must be able to perform
satisfactorily for 15 to 20 years to be a viable, cost-effective
anode system (80). However,
due to the subsequent availability of commercial anodes, some of
which have proven to be more durable, further installations of this
anode were not carried out.
(5) Conductive Polymer-Encased Copper Anode Grid
At the time, two commercial grid-type anodes became available. The
first was Raychem Ferex 100 anode, which consisted of a stranded
copper wire encased in a proprietary flexible and electronically
conductive polymer, resulting in an anode cable with a nominal
diameter of approximately 8 mm (0.31 in). This composite anode
cable is then woven in the factory into a two-dimensional panel.
Installation of this anode panel is very simple: the panels are
spread over a scarified and repaired bridge deck, secured down with
plastic cleats and pins (drilled into the concrete), then covered
with a rigid overlays. There is no handling of potentially
hazardous chemicals at the bridge site. Reported early performance
of this anode on one half of a bridge deck in Cincinnati, Ohio, was
good, with an average circuit resistance of 0.6 ohm (76,77).
The unique form of this anode allows for possible use on
vertical surfaces of concrete piers, using shotcrete to cover the
anode. Unfortunately, it is relatively difficult to completely
cover the 8-mm high anode cables with shotcrete without any voids,
especially at where the cables contact the concrete substrate. In
fact, some disbondment of shotcrete with this anode installed on
substructures has been reported. In addition, the conductive
polymer casing around the copper wire also proved to be susceptible
to attack by acids generated around the anode. Another disadvantage
of this anode is that if the core copper wire is exposed, the
exposed copper will corrode and causes an open circuit and local
loss of cathodic protection current. (The marketing of this product
was eventually discontinued by its manufacturer in the late 1980s
or early 1990s.)
(6) Activated Titanium Mesh Anodes
The second commercial grid-type anode is a honeycomb-shaped
titanium wire mesh that is coated with a proprietary mixed precious
metal oxide catalyst, which serves as the current discharge
surface. This mesh, which comes in .2-in (4-ft) wide panels, is
first secured on a scarified concrete deck with plastic anchored
bolts. The mesh panels are electrically connected by spot welding
across all adjacent panels a titanium strip, which is then
connected to a rectifier lead wire. Then the entire concrete deck
is covered with either a conventional concrete or a latex-modified
concrete overlay.
This type of anode mesh has many distinctive advantages over the other anodes developed so far. It offers a considerably higher anode/concrete area ratio, and, therefore, distributes the protection current much more uniformly across a structure. The coated titanium has been used in other applications that required extremely high-current outputs and, therefore, the mesh is projected to have long life as a cathodic protection anode for used in reinforced concrete, where the current requirements are relatively low. This anode was installed in the other half of the bridge deck in Cincinnati, Ohio, for testing with the Ferex 100 anode, and functioned reasonably well—yielding an average circuit resistance of approximately 0.5 ohm with a latex-modified concrete overlay (76,77). Similar installation, with an acrylic-cement based coating as an overlay, on the sidewalks of that same bridge deck yielded an average circuit resistance of 2.0 ohm. Some cracking of the overlays on the deck and the sidewalks were observed, however.
This mesh anode may also be installed on substructures, and covered with an overlay of shotcrete. However, it faces the same risks of some portions of the mesh not being completely covered by the shotcrete and disbondment of shotcrete that the Raychem Ferex 100 anode cables faced when installed on substructures, but probably less because the mesh is considerably thinner. In fact, some ends of the mesh were exposed when it was field tested on the two concrete piers of the bridge in Cincinnati, Ohio (76,77). A possible indication of the difficulty of achieving good shotcrete bonding was the relatively high average circuit resistance of that installation, which was approximately 57.0 ohm.
The titanium mesh anode, when used in conjunction with a
conventional rigid overlay, has so far performed better than all
the other anodes tested in reinforced concrete bridge decks.
Consequently, it is now the anode preferred by many state highway
agencies and parking garage owners for rehabilitating horizontal
concrete surfaces.
b. Impressed-Current Cathodic
Protection of Concrete Bridge Substructural Members
To date, there is no significant amount of corrosion reported on
continuously immersed reinforced concrete members (piles) and hence
very few structures are using cathodic protection technology on
this type of concrete members. However, there is a significant
problem with corrosion of reinforced concrete piles exposed to the
marine environment, particularly in the splash zone (between high
and low tides). Also, there is a definite problem with corrosion in
the other reinforced concrete components exposed to marine
environment.
Many concrete piers in the snow belt are rapidly deteriorating
as a results of reinforcing steel corrosion, induced by deicing
salts dripping through faulty deck joints that are often located
directly above the piers or splashes from nearby traffic. In
addition, the concrete beams—typically the end portions, which are
often situated underneath deck joints—are also susceptible to
corrosion problem. These concrete components are not exposed to
traffic impact and have more vertical surfaces than horizontal
surfaces. Therefore, cathodic protection anodes intended for use on
concrete piers do not have to be resistant to traffic load and
wear. However, the anodes must be relatively easy to install or
apply on the vertical concrete surfaces, and, if they are liquids,
must be of the proper consistency so that they would not run. As
discussed earlier, the conductive polymer encased copper anode grid
(Ferex 100) and the activated titanium mesh had been marketed also
for used on concrete piers by their manufacturers, although there
is considerable doubt as to their suitability for this use.
(1) Sprayable Conductive Polymer Coating Anode
To provide state and local transportation agencies in the snow belt
with some economical anodes for effective distribution of cathodic
protection current across concrete piers, the FHWA sponsored the
development of an electrically conductive polymer coating that can
be applied on vertical and overhanging concrete surfaces, by
mechanical means such as spraying or shotcreting (81). The study resulted in the
development of a mixture of calcined coke breeze, a vinylester
resin (Dow 8084), thixotropic agent (made from a bentonite clay),
and a catalyst, methyl ethyl ketone peroxide (MEKP), that will stay
in suspension for several days and can be sprayed on vertical and
overhanging concrete surfaces without dripping and sagging. Before
spraying, the resin, coke filler, and additives were premixed in a
19.3 1(5 gal) bucket and then pumped through a hose to a spray
nozzle. Meanwhile, the catalyst was pumped from a separate
pressurized container to the spray nozzle through a second hose.
The sprayer uses an external impingement mixing technique that
allows the catalyst to be added to the coke-filled resin mixture
approximately 5 cm (2 in) beyond the end of the nozzle. The spray
is regulated with air pressure controlled by valves.
When sprayed to a thickness of 10 to 15 mil, the mixture provides a coating that has a resistivity of 5 ohm-cm and is 50 percent as permeable as the Portland cement concrete (substrate). After being charged for up to 4 months at current levels several times that normally used in CP systems, the coatings did not show any decay in bond strength or weatherability. It was estimated that it would cost approximately $10.76/m 2($1.00/ft 2) to spray the conductive polymer coating on concrete piers. This cost does not include the installation of the primary anode, cost of the air compressor and spray equipment, scaffolding, etc.
This sprayable polymer coating was utilized as an anode for CP
of one of the two piers of the bridge in Norfolk, Virginia, where
it functioned effectively in distributing current over the
pier—yielding an average circuit resistance of 5.3 ohm. However,
during the first 1.5 to 2 years of operation, at least up to a
dozen of 2.5-cm (1-in.) diameter blisters were found in the
coating. Although still unconfirmed, this may indicate that the
coating may not be completely permeable—in at least some locations
over the pier—to gases formed by some of the anodic
reactions.
(2) Metallized Zinc Coating
In 1983, the application of metallized zinc coating extended from
structural steel components to CP of concrete piers when California
Department of Transportation field tested this material on a pier
of the Richmond/San Rafael Bridge in San Francisco Bay (82). Zinc can be applied on the surface
of a reinforced concrete using either the flame spray or the arc
spray technique, whereby zinc wire is continuously fed through a
hand-held gun where it is melted with an oxygen-acetylene flame or
a high-voltage arc and spray on the concrete with a jet of
compressed air. Electrical connection of the metallized zinc to the
rectifier is facilitated by small stainless steel or copper plates
secured (with epoxy) on the concrete surface prior to spraying.
Fortunately, because the zinc coating is metal, it is very
conductive and, therefore, only a limited number of these contact
plates are needed.
Since the metallization process is similar to spray painting, the zinc coating can be applied easily on vertical surfaces, corners, and undersides of a structure. And, unlike the carbon-based conductive polymer coating, the zinc coating is very comparable in color to concrete and requires no decorative overcoat. As with other anode systems that completely covered the concrete, metallized zinc coating provides efficient distribution of protection current. However, as was observed during field trial on a concrete pier, it exhibited a higher tendency than the other conductive coatings to create electrical shorts, with chairs and discarded tie wires that are often found at the bottom of pier caps. As had been observed on a concrete pier of the Route 64 Bridge in Norfolk, Virginia, these metal parts will either cause shorts during the metallization process or, will corrode while the CP system is in service and then cause small pieces of concrete to pop off (76).
Another mode of failure of metallized zinc, which is common
among all coating anodes (including the conductive polymer coating
discussed earlier and the conductive paint to be discussed in a
later section), is fracture and separation in the surface layer of
concrete adjacent to the coating, after being subjected to varied
extents of current passage. This resulted from the formation of
acid, by anodic reaction, at the coating-to-concrete interface,
which ultimately decreased the adhesion of coating. For metal
coatings, corrosion products formed on the coating at low pH were
also significant cause of coating failure (83,84).
(3) Conductive Paints
Paints, using water or organic solvents as the carrier, can be made electrically conductive by adding finely dispersed carbon particles. The resulting materials can be applied on an entire concrete member as a continuous distributive or secondary anode, so that protection current brought in from a rectifier by primary anodes can be uniformly distributed. The primary anodes can be platinum wires secured on the surface of the concrete members. Since these materials can be applied by using common tools such as sprayers, rollers, or brushes, they are very suitable for use on concrete piers. In addition, these materials are relatively inexpensive.
Earlier field testing on some concrete piles surrounded by water
in Florida showed some localized disbondment of the conductive
paint at the tidal level of the pile but none at above that level.
Recently, a water-based conductive paint was tested in two CP
systems that were built, one 9 years ago and the other 7 years ago,
to protect the concrete piers of four inland bridges in Virginia
(85). Measurements made at
various times of circuit current, voltage, steel potential, and
4-hour polarization indicated that the conductive paint was
performing adequately and the CP systems were providing sufficient
protection to the reinforcing steel in the piers. However, the
circuit resistance for the various circuits at the energization of
these CP systems were relatively high—varying from 12 to 61 ohms
for the 9 years old system and from 5.6 to 31.0 ohms for the 7
years old system.
Some deterioration or degradation of the conductive paints was
observed, mostly at unsheltered portions of the piers (specifically
the ends of pier caps). This deterioration, which ranged from 0 to
0.37 percent in the older system and 0 to 0.14 percent in the newer
system, occurred at the coating-cement interface. In a recent study
on cathodic protection of prestressed concrete components, similar
degradation of carbon-filled conductive coatings was observed and
it was suggested by the researchers that this may be related to
poor wetting of the carbon particles by the water, which may be
improved by the use of adhesion promoter (84).
Based on the performance of the water-based conductive paint in
the first 7 to 9 years of service of the two CP systems in
Virginia, it was projected that the service life of this conductive
paint can be at least 15 years, especially when any small
deterioration is touched up as early as possible.
(4) Conclusions on the Performance of Various Anodes on Concrete
Piers.
Based on all the laboratory and field data available so far on the
various anodes that have been tested for impressed-current CP of
concrete substructure bridge components, the following conclusions
can be made:
(5) Present Status of Impressed-Current Cathodic
Protection
Titanium mesh anode, used in conjunction with a concrete overlay to
distribute protective current, is filling the need for a durable
anode for use in impressed-current CP of reinforced concrete bridge
decks and is, in fact, now widely accepted by state and local
transportation agencies.
On the other hand, the progress in the anode technology for impressed-current CP of other concrete bridge components has lagged behind and no single anode has yet been identified to be very satisfactory in terms of being able to provide long-term durability. One of the reasons for this relatively slow development is that recognition of corrosion-induced concrete deterioration as a problem in these components came much later than for bridge decks. The titanium mesh anode would have had a place in CP of concrete piers, because it is expected to be able to perform equally well on any concrete components. However, it is still not possible to use it as such because the mesh cannot be installed on vertical concrete surfaces and covered with shotcrete without invariably creating some problems.
The use of conductive carbon-based coatings or polymers has some
possible drawbacks, including: (a) debonding of the coating that
arises when the materials are used in environments wherein the
concrete is constantly wet or when the materials are applied before
the concrete is sufficiently dry; (b) degradation of carbon or
binder after extended current passage; and (c) increase in the
electrical resistance between the anode and the steel due to
insufficient moisture or accumulation of insulating byproducts at
the anode/concrete interface. The flame or arc-sprayed zinc is free
of the debonding problem; however, it suffers from some of these
same problems. Recently, the use of flame or arc-sprayed titanium
metal—over concrete coated with a conductive oxide solution—as a
new anode has shown some promise when it was tried partially on a
bridge in Oregon.
c. Galvanic Cathodic Protection of
Concrete Bridge Decks
Galvanic CP was first tested on a bridge deck in Illinois in 1977,
as part of a National Cooperative Highway Research Program study.
In that field test, two different sacrificial anodes were installed
in the deck:
Except for the early failure of the concrete overlay used on the perforated zinc sheets, which necessitated the use of a free-draining asphalt overlay over both anode systems, these had performed satisfactorily for nearly 14 years. In 1991, these sacrificial anode systems had to be removed due to the failure of the asphalt overlay and the need to widen the structure. Examination of the removed anode materials revealed that considerable mass of each anode was still left and that the systems had the potential for many more years of service if not limited by the lifetime of the overlay. A 1989 revisit of the systems indicated that the system current output was 16.8 mA/m 2(1.5 mA/ft 2); this compared very well to the outputs of 10.8 to 32.2 mA/m2 (1.0 to 3.0 mA/ft 2) during the earlier days of the systems.
To continue that effort, a laboratory screening program was undertaken to identify most promising sacrificial anodes (86). The selection of potentially useful sacrificial anodes for the laboratory screening was limited to scrap metals and to materials that are already commonly used in the CP industry, which are aluminum, magnesium, and zinc alloys.
This laboratory screening involved coupling 50 x 150 mm (2 x 6 in.) strips of these anodes with reinforcing steel bars in sand conditioned to various resistivities (23, 100, and 260 ohm-m) and treated with a solution to simulate concrete pore solution, for a period of 18 weeks. During that period, measurements of current flow, potentials, circuit resistance, and 4-hour depolarization of the steel, were taken. Afterward, the anode strips were removed from the sand and their weight losses were determined. Results from this screening indicated that:
Three anodes were selected for further evaluation in reinforced concrete slabs. These were the special high-grade zinc (SHG-Zn), the Galvalum III alloy (Galv III), and the structural-grade expanded aluminum mesh (Al-5005). The test concrete slabs were constructed with the following four different types of overlay concrete: (a) normal-weight concrete, (b) lightweight concrete, (c) free-draining Portland cement concrete, and (d) free-draining latex-modified concrete. Each of the slabs was cast with two lifts of concrete, with the top lift containing 5.9 kg/in 3(10.0 lb/yd 3) of chloride.
During the 24-weeks testing, the slabs were subjected to
periodic wetting with a saline solution; and, at weekly intervals,
measurements of current flow and circuit resistance. In addition,
at 4 and 12 weeks, depolarization measurements were made on the
steel for up to 72 hours, instead of the usual 4 hours. Based on
these screening tests and detailed testing in concrete slabs, the
structural-grade expanded aluminum mesh (Al-5005) was tested on a
bridge deck located in a northern area, with a normal-weight
concrete overlay. The performance of this system was, however, not
satisfactory.
d. Galvanic Cathodic Protection of
Concrete Substructures
Most anodes applied to atmospherically exposed concrete structures
utilize impressed current supplied by an auxiliary power source.
For all situations, this mode of cathodic protection provides
adequate power to the structures and permits complete flexibility
for control of the CP system. However, the use of impressed current
may overprotect the structures and reduce anode life and cause
hydrogen embrittlement of high- strength prestressed steel. In
addition, the need for additional electrical components compromises
the reliability of the impressed-current CP systems and increases
the monitoring and maintenance requirements.
Certain metals that are anodic in comparison to steel, such as aluminum, magnesium, and zinc, each possess an inherent characteristic electrical potential that allows it to galvanically supply cathodic protection current—without the need for an external power source. However, the driving voltage and, therefore, the amount of protective current that an individual galvanic anode can supply is limited by the magnitude of the potential that characterizes that anode. Thermally sprayed zinc appeared to be able to function as a sacrificial anode in galvanic CP systems installed for protecting concrete in the seawater splash and tidal zone. However, the anode surface must be periodically wetted in order to supply adequate current and, in addition, the protective current decreases with time. Recent data indicated that the metallized coating eventually became passive, due to reduction in pH at the anode-to-concrete interface (87). In addition, it is also recognized that the system has a relatively short useful life.
Due to the inherent advantages that galvanic CP has over the
impressed-current CP, particularly the almost complete freedom from
need for regular maintenance, the FHWA initiated multiple research
studies to develop galvanic anode systems for counteracting the
corrosion currents in both dry and wet environments (87,88). This section describes two such
promising galvanic anode systems for substructure concrete bridge
members.
(1) Zinc-Hydrogel Anode System
The ability of sacrificial anodes (such as aluminum, aluminum
alloys, and zinc) to deliver galvanic current, when in contact with
different commercial conductive hydrogel adhesives, were
investigated (88). Zinc was
included in the test because it has good current efficiency and
relatively low cost. The aluminum anodes were included for their
potential to be 30 percent thinner, 74 percent lighter, and 65
percent less expensive than zinc. However, testing indicated that
neither aluminum nor its alloys were suitable for use in
conjunction with the hydrogel adhesives tested, because they either
exhibited unstable behavior or provided inadequate working
potential. In addition, the aluminum anodes were voluminous and
difficult to accommodate. Zinc was identified as the best anode
candidate, with a stable working potential of 1.1 volt (SCE) at the
typical range of current densities used in cathodic protection of
concrete, and showing no tendency to passivate with time.
The conductive hydrogel adhesives tested were hydrophilic coagulated colloids of acrylic-sulfonamide copolymers. These adhesives, which are used for medical purposes, have satisfactory resistivity, adhesive tack, and drying resistance. However, accelerated testing indicated that they could not tolerate a charge transfer greater than that equivalent to 6 years of operating life. A special hydrogel formulation, the 3M-3, that is capable of tolerating a total charge equivalent to about 11 years of service life was then developed and is being combined with zinc anode for field testing.
This best combination of sacrificial anode and conductive adhesive, the zinc/3M-3 hydrogel system, is being field tested in at least three installations. In the following installations described below, a 10-mm- to 20-mm-thick zinc sheet is affixed to the concrete with the ionically conductive-hydrogel adhesive.
Time-on- Line | Current Flow, mA/m2 (of Steel) | Average Polarization |
||
(days)
|
Pier 16 | Pier 32 | Pier 43 | - |
0
|
9.5 | 11.1 | 9.5 |
----
|
98
|
----
|
----
|
----
|
261 mV |
132
|
----
|
----
|
----
|
l98 mV |
The zinc/hydrogel galvanic anode at this installation has performed satisfactorily during the evaluation period. Measurements showed that the anode was providing sufficient polarization of the steel bars, exceeding the 100-mV CP criterion. Visual inspection indicated that the system is properly controlling corrosion activity in the piers.
Time-on-
Line (Months) |
Current Flow, mA/m2 (steel) |
Average Polarization |
||
Piles | Caps | Beams | - | |
0
|
37.5
|
17.0
|
12.5
|
------
|
2
|
28.2
|
16.9
|
13.6
|
------
|
4
|
18.5
|
14.4
|
13.6
|
------
|
6
|
15.7
|
4.1
|
4.0
|
------
|
9
|
14.4
|
2.9
|
2.5
|
120 mV |
13
|
13.4
|
5.8
|
2.1
|
114 mV |
20
|
14.1
|
4.1
|
1.1
|
108 mV |
These data show a slow decrease in the amount of current
delivered, apparently related to relative distance of the concrete
member from the water. Despite this decrease in current, steel
polarization is sufficiently adequate to meet CP criterion of 100
mV, during the first 20 months of operation. Past experience has
shown that the current required for meeting this criterion
typically decreases with increased length of operation of a CP
system.
The following are interim findings resulting from
the effort to develop a combined sacrificial metal/hydrogel anode
system:
In addition to these three installations, independent testing by
Virginia Department of Transportation is also under way on some
inland concrete piers and marine prestressed concrete piles in
Virginia.
(2) Sprayed Alloy Anode System
In another FHWA developmental effort, a different approach is taken
to develop good sacrificial anodes: finding new sacrificial metals
or alloys that can be applied by the conventional metallization
(flame- or arc-spraying) process to form a metallized coating on
the concrete members (87). The
goal of this research was to develop a new cost-effective,
sacrificial anode material that is free of the problem associated
with metallized zinc coating and is capable of providing sufficient
current density to polarize the steel so that the steel will not
corrode at all or corrode at an acceptable rate. Fifteen different
commercially available anodic materials were tested for: (1) anode
capacity; (2) anode efficiency; (3) cyclic polarization; (4)
atmospheric corrosion characteristics; (5) susceptibility to
effects of environmental (temperature and humidity); and (6) effect
of pH on anode performance. The sprayable anodic materials tested
included pure zinc, pure aluminum, binary Zn-Al alloys, binary
Al-Zn alloys, binary Al-Mg alloys, a tertiary Al-Zn-Mg alloy, and a
tertiary Al-Zn-Sn alloy. The study found that:
Since none of the evaluated 15 anodes demonstrated sufficient utility for use as sacrificial anode for reinforced concrete, especially in low-pH environment, the last portion of this study involved developing new alloy for this application. This effort centered on improving the Al-Zn alloy by adding indium, titanium, or zirconium, which in effect are tertiary alloys, and finding the optimum concentration for each of these three components. Among the numerous combinations of the tertiary alloys tested, the best performing alloy was found to be Al(20)-Zn-In(0.2), because it exhibited the lowest anode polarization and maintained a relatively active static potentials in all environments. Field testing of this new alloy is under way in Florida, Pennsylvania, and Virginia. The following is a description of the progress made in the Florida installation on the Bryant Patton Bridge.
This structure has considerable seawater-induced corrosion damage on the prestressed concrete piles. In July, 1995, two piles in one bent was sprayed with the Al-Zn anode; and, for comparison, conventional pure zinc was sprayed on two other piles. Both arc and flame spray equipment were used for the thermal spray application of the metals to the concrete piles. The concrete surface on each pile where an anode was applied is approximately 3.7 m 2, and the corresponding embedded steel surface was approximately 2.1 m 2. The anodes are not normally exposed to rainwater because the treated piles are located beneath a wider pile cap.
Both materials are operating as galvanic anodes. The four piles are fully instrumented with rebar probes, silver-silver chloride reference cells and current measuring circuits. To facilitate depolarization testing, provision was made so that the anode-to-steel circuit can be opened (disconnected) remotely. A data logger and a modem were installed at the site so that all of these parameters can be monitored remotely by using a cellular phone.
The prospect of extending the service life of the Al-Zn anode with a suitable top coat is also being tested. For this testing, one pile in a second bent was treated with the Al/Zn anode and then covered with an aliphatic urethane coating, while a second pile was treated with the anode and then covered with a water-based acrylic paint.
The system was kept in operation for two years, during which anode-to-steel current, rebar probe current, steel potential, and depolarization data were obtained monthly. At the end of this period, additional data (such as anode depolarization, cathode depolarization (using both the embedded reference and surface electrodes), anode-to-concrete adhesion, anode-to-concrete interface pH, anode-to-structure driving voltage, anode-to- structure resistance, and visual condition) were collected. In addition, core samples were also taken to determine the composition and extend of corrosion products at the anode-to-concrete interface, to allow for estimation of anode depletion rate.
The following are findings made from this testing:
e. Cathodic Protection of Prestressed
Concrete Bridge Members
In the last 25 years, FHWA administrative contracts, in-house
research, State Planning and Research studies, National Cooperative
Highway Research Program studies, and private industry research
have made significant advances in the development of improved CP
systems for reinforced concrete bridge decks. This development has
resulted in the installation of various CP systems on approximately
500 bridge decks by the state highway agencies. However, the
development of CP technology for prestressed concrete has lagged
behind. In 1988, FHWA initiated a major laboratory study to
identify limitations and potential problems, which may exclude the
application of CP to PS/C bridge members. Based on this study on
PS/C, it became apparent that the susceptibility to hydrogen
embrittlement of embedded prestressed steel can be avoided. This
can be accomplished by careful monitoring and control of the amount
of steel polarization through the use of a current- and
voltage-limiting rectifier and embedded reference cells. Based on
this knowledge, FHWA initiated a study in 1991 with the objectives
of: (1) performing fundamental research that is aimed at resolving
some concerns related to PS/C and, (2) installing and evaluating a
field CP system for some PS/C components, to gain knowledge about
the practical application of CP to prestressed concrete bridge
members.
In addition to the hydrogen embrittlement susceptibility issue, there was also another concern. It is well known that under CP, there is a migration of cations (e.g., potassium, sodium, etc.) toward the embedded strands resulting in possible softening of the mortar paste around the reinforcement. This phenomenon may, in turn, cause some reduction of bond between the prestressed strands and concrete, over the life of a structure, and hence the overall structural integrity of the bridge members and their ability to perform their designed function. This possible partial loss of bond is of no real consequence in reinforced concrete structures, but in prestressed concrete members, it could be a major problem after CP is applied for an extended period.
There was also a concern about the behavior of corrosion pitted embedded prestressing strands when under cathodic protection, even at below the hydrogen evolution potentials. Earlier limited research had indicated that the probability of notched prestressing strands undergoing hydrogen embrittlement and then failing under service loads is much greater than for smooth and uniformly corroded specimens. This raised the question: If the embedded strands in concrete bridge members behave more like notched specimens, what would be the most appropriate CP criteria to use or should CP even be considered for prestressed concrete members?
To address these concerns and raise CP technology for
prestressed concrete to a par with that for reinforced concrete, a
number of laboratory and field studies were initiated.
(1) Laboratory Investigations
Laboratory investigations (89)
were conducted to address the following issues that are
particularly relevant to PS/C bridge components:
To facilitate resolution of these issues, the study was focused
in four major areas:
The following findings were made:
Based on evaluation of the computerized rectifier system and the control methods investigated, it was concluded that CP systems for prestressed concrete structures can be effectively monitored and controlled by existing remotely operated hardware and software.
(2) Field Installations
Selected anode systems were tested in the cathodic protection of
some prestressed box-beams (located in a snow belt state) and
prestressed concrete beams and piles (located in a marine
environment). The aims were to: (1) develop methodology for CP
installation, (2) evaluate the effectiveness of several CP systems
with potential application in combating corrosion in prestressed
concrete components, and (3) identify all system limitations and
potential risks to the structures. These CP systems are briefly
described in Table 17 (90,91).
Bridge | Component | Anode System | CP Mode |
H. Frankland Br. Tampa, El.
|
Prestressed beams
|
Metallized zinc coating
|
Galvanic |
Prestressed beams
|
Metallized zinc coating
|
Impressed current | |
Prestressed piles
|
Titanium mesh/cement grout jacket
|
Impressed current | |
Prestressed piles
|
Titanium mesh/conductive rubber
|
Impressed current | |
Abbey Rd.
Ohio |
Soffit of prestressed
box-beams |
Metallized zinc coating
|
Galvanic (then Impressed current) |
West 130th St.
Ohio |
Soffit of prestressed
box-beams |
Conductive paint (Permarock)
|
Impressed current |
After nearly three years of operation and monitoring, these CP systems and bridge components were evaluated. Analysis of the data lead to the following conclusions:
In summary, CP of prestressed concrete bridge members can be
accomplished safely and reliably; however, concrete members which
are very heterogeneous in moisture content are not considered good
candidates.
3. Electrochemical Chloride
Extraction
When a direct current is conducted through concrete, the relatively mobile ions (such as chloride, hydroxide, sodium, potassium, calcium, etc.) in the concrete would migrate, with each ion moving toward the electrode with the charge opposite to it. The feasibility of removing the undesirable chloride ions from a contaminated concrete by such electrochemical means, instead of excavation of the contaminated concrete from a structure, was studied in the mid-1970s by Kansas Department of Transportation, which used a sacrificial copper anode to show that chloride ions can be expelled from concrete by passing a direct current between the steel bars and the anode, as in cathodic protection except at considerably higher level of current (92). This feasibility of electrochemical removal of chloride ions from concrete was confirmed in another study, a total of 20 m 2 (200 ft 2) of concrete on a bridge deck was treated with an average current density between 23 to 28 A/in 2 (2.3 to 2.8 A/ft 2), under a constant voltage of 100 V for 12 to 24 hours (93).
However, the unnecessarily high levels of direct current used in these early investigations had some adverse effects (such as decreasing the concrete-to-steel bond and cracking in the concrete) on the concrete. The concern about these adverse effects on treated concrete has delayed the use of electrochemical chloride extraction as a remedial method for the permanent rehabilitation of concrete bridges. To address this concern, one of the SHRP studies conducted investigations on laboratory slabs and on portions of some concrete bridge components, and thereby found that if the level of current applied is kept below 5 A/m 2(0.5 A/ft 2), the chloride removal treatment is unlikely to have any adverse effect on the concrete (94,95). It was also found that the treatment removed 20 to 50 percent of the chloride ions admixtured into the concrete slabs and redistribute the remaining chloride well away from the reinforcing steel. In an independent study in Canada, portions of a concrete pier column were treated and the results confirmed the removal of some of the chloride in the concrete and the corresponding passivation of the steel bars (96).
These studies showed that electrochemical chloride extraction carried out with considerably less electrical current than that used in the earlier studies used, thereby avoided any adverse effects on the concrete. Since this approach has a very important advantage over cathodic protection as there are no electrical components or anode materials to be maintained after the treatment is completed, these findings had rekindled interest in this method. Since these studies involved only concrete slabs and very small sections of several bridges, pilot electrochemical removal of chloride treatments were conducted recently on some full-sized concrete bridge deck spans and piers in Virginia (97,98) and some full-sized concrete piers in South Dakota (99). These pilot treatments have demonstrated that it is feasible and simple to conduct the treatment on fill-sized reinforced concrete bridge members, although it is comparatively more difficult to conduct the treatment on concrete piers.
A difficulty encountered in planning for these full-sized treatments was predicting the necessary length of treatment required to reduce the chloride concentration at the steel level to below the corrosion threshold or some concentration equilibrium. The SHRP studies suggested that a total charge of 600 to 1,500 A-hr/m 2would be sufficient in most cases, and for most concrete, this would mean a total treatment time of 10 to 50 days. Unfortunately, this guideline is not sufficiently definitive to allow for efficient logistic scheduling of the different rehabilitation operations that would typically be involved before and after a treatment and of necessary traffic control. Another issue relates to the uncertainty on how long the various beneficial effects of a treatment would last on a concrete structure, which is critical in estimating the life cycle cost of a treatment. To address these two issues, an ongoing study co-sponsored by FHWA and Virginia Department of Transportation is attempting to develop procedures for estimating optimum treatment time for any candidate concrete structure (based on factors such as initial and target final chloride concentrations, concrete resistivity, etc.) and a model for estimating the beneficial life of a treatment (100).