| |
LTPP Materials Characterization Program: Resilient Modulus of Unbound Materials (LTPP Protocol P46) Laboratory Startup and Quality Control Procedures |
Primary Topic: Materials-Unbound and Soils
Description: This document describes a procedure for resilient modulus quality control checks. The procedure evaluates the ability of laboratory personnel and the test system to complete LTPP P46 protocol for resilient modulus testing. The procedure is divided into three general phases: (1) Electronic System Performance Verification, (2) Calibration Check and Overall System Performance Verification, and (3) Proficiency Testing. The implementation of this procedure in the FHWA Contractor Laboratories has greatly reduced the within and between-lab variability associated with the LTPP P46 test procedure.
FHWA Publication Number: FHWA-RD-96-176
Publication Year: 1997
Document Links: HTML PDF (file size: 2.70 mb)
| » | Contact LTPP Customer Support Service Center at ltppinfo@dot.gov if you would like to be added to our email distribution list for LTPP Newsletters and other announcements. |
| » | Design |
| » | Construction |
| » | Preservation |
| » | Maintenance |
| » | Management |
| » | Rehabilitation |
| » | Aramis Lopez 202-493-3145 E-mail Aramis |
| » | Customer Service
202-493-3035 E-mail:LTPPinfo@dot.gov |