U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000


Skip to content U.S. Department of Transportation/Federal Highway AdministrationU.S. Department of Transportation/Federal Highway Administration

Federal Highway Administration Research and Technology
Coordinating, Developing, and Delivering Highway Transportation Innovations

About LTPP | Data Collection | Analysis | Products | Pooled Fund Studies | Operations/Analysis Feedback Reports | Publications | Projects |
Customer Survey
| Contact

 

 

LTPP Publications

 

Publication Details

Precast Concrete Panel Systems for Full-Depth Pavement Repairs Field Trials

Primary Topic: Pavement Rehabilitation

Description: The use of precast slabs as an alternative to conventional cast-in-place repairs may be an effective means of reducing construction time, thereby minimizing user delay and travel costs while obtaining a long-lasting, durable repair. This report summarizes the 3-year study, "Field Trials of Concrete Pavement Product and Process Technology-Precast Concrete System for Rapid Repairs," in which precast slabs were used for joint repair and slab replacement on in-service Michigan and Colorado highways. Cast-in-place, full-depth patches were installed as controls. The report contains a summary of the relevant literature; summaries of the field trials and their findings regarding efficiency and durability; recommendations for precast panel installation; a sample distress documentation report; a presentation of construction guidelines; and a sample special provision specification developed as part of the study. Recommendations for consecutive slab repairs are to reduce slab length; use a slab thickness of 200 mm or greater; use dowels to connect precast panels to existing panels for joint flexibility and load transfer; maximize proximity of repair sections when planning and encourage multitasking during panel installation to reduce construction time. For isolated repairs it is recommended that four dowel bars be placed in the wheel path and provide an expansion cap at one end of the dowel bar to accommodate slab movement due to environmental loading and prevent closing of the joint.

FHWA Publication Number: FHWA-IF-07-019

Publication Year: 2007

Document Links: HTML  PDF (file size: 3 mb)

PDF files can be viewed with the Acrobat® Reader®

 

 

Office of Infrastructure R&D Links

» Office of Infrastructure R&D
» Infrastructure R&D Program
»Long-Term Bridge
  Performance Program

»Long-Term Pavement
  Performance Program
»Foundation
  Characterization
  Program (FCP)
» Infrastructure R&D Experts
» Infrastructure R&D Laboratories
» Infrastructure R&D Projects
» Infrastructure R&D Publications
» Infrastructure R&D Topics

 

LTPP Email Distribution List

» Contact LTPP Customer Support Service Center at ltppinfo@dot.gov if you would like to be added to our email distribution list for LTPP Newsletters and other announcements.

 

FHWA Pavement Links

» Design
» Construction
» Preservation
» Maintenance
» Management
» Rehabilitation

 

More Information

 

Contacts

» Aramis Lopez
202-493-3145
E-mail Aramis
 
» Customer Service 202-493-3035
E-mail:LTPPinfo@dot.gov
 
Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000
Turner-Fairbank Highway Research Center | 6300 Georgetown Pike | McLean, VA | 22101