| |
Construction Quality Assurance for Design-Build Highway Projects |
Primary Topic: Pavement Construction
Description: The purpose of this TechBrief is to help clarify the roles, responsibilities, and activities related to construction QA on DB projects. The specific topics discussed include QA, QC, and acceptance. Related topics such as independent assurance (IA), dispute resolution, personnel qualification, laboratory qualification, and warranties are also discussed. Some RFP and contract documents for DB projects have incorrectly assigned responsibility for acceptance to the design-builder, which is not in accordance with 23 CFR 637. Additionally, because the DB project delivery method is often used on large, complex, fast-paced projects, it presents some unique challenges that merit discussion.
FHWA Publication Number: FHWA-HRT-12-039
Publication Year: 2012
Document Links: HTML PDF (file size: 0.2 mb)
| » | Contact LTPP Customer Support Service Center at ltppinfo@dot.gov if you would like to be added to our email distribution list for LTPP Newsletters and other announcements. |
| » | Design |
| » | Construction |
| » | Preservation |
| » | Maintenance |
| » | Management |
| » | Rehabilitation |
| » | Aramis Lopez 202-493-3145 E-mail Aramis |
| » | Customer Service
202-493-3035 E-mail:LTPPinfo@dot.gov |