Strategic Objective 2: Improvement of Materials Characterization

 

The following boxes are Analysis Outcomes for Objective 2. To see specific analysis projects for each Outcome, click on the corresponding box.

Blue box: A. Relative importance of different material characteristics in predicting pavement performance. VH1 (Very high priority, number 1 in sequence).

Blue box: B. Relationships to enable interchangeable use of laboratory and field-derived material parameters. VH1 (Very high priority, number 1 in sequence).

Green Box: C. Relationship between as-designed and as-built material characteristics. H1 (High priority, number 1 in sequence).

Green Box: D. Performance impact of different levels of material variability and quality. H1 (High priority, number 1 in sequence).

Blue Box: E. Estimate material design parameters from other materials data (for example, Resilient Modulus from gradation and density). H1 (High priority, number 1 in sequence).

Green Box: F. Improved Deflection-Based analysis Methods for Materials Characterization. H1 (High priority, number 1 in sequence).

Green Box: G. Combination of all results under this Objective to provide a unified set of tools/guidelines for characterizing pavement materials/soils for pavement design and construction. H1 (High priority, number 1 in sequence).

 

Priorities

Critical = color-coded red box for critical priority
Very High = color-coded blue box for very high priority
High = color-coded green box for high priority
Sequence = number-coded boxes 1, 2, or 3 in sequence

 

Note: Sequence numbers denote the order in which Analysis Outcomes should be addressed for a given Objective. Analysis Outcomes with the same sequence number can be addressed at the same time.

 

Strategic Plan for LTPP Data Analysis

 

 

Office of Infrastructure R&D Links

» Office of Infrastructure R&D
» Infrastructure R&D Program
»Long-Term Bridge
  Performance Program

»Long-Term Pavement
  Performance Program
» Infrastructure R&D Experts
» Infrastructure R&D Laboratories
» Infrastructure R&D Projects
» Infrastructure R&D Publications
» Infrastructure R&D Topics

 

LTPP Email Distribution List

» Contact LTPP Customer Support Service Center at ltppinfo@dot.gov if you would like to be added to our email distribution list for LTPP Newsletters and other announcements.

 

FHWA Pavement Links

» Design
» Construction
» Preservation
» Maintenance
» Management
» Rehabilitation

 

More Information

 

Contacts

» Aramis Lopez
202-493-3145
E-mail Aramis
 
» Customer Service 202-493-3035
E-mail:LTPPinfo@dot.gov