Skip to contentUnited States Department of Transportation - Federal Highway Administration FHWA Home
Federal Highway Administration Research and Technology: Coordinating, Developing, and Delivering Highway Transportation Innovations

About LTPP | Data Collection | Analysis | Products | Pooled Fund Studies | Operations/Analysis Feedback Reports | Publications | Projects |
Customer Survey
| Contact

 

 

Strategic Objective 6 Maintenance and rehabilitation strategy selection and performance prediction

 

The following boxes are Analysis Outcomes for Objective 6. To see specific analysis projects for each Outcome, click on the corresponding box.

Red Box: A. Performance and efficacy of maintenance and rehabilitation treatments as function of pre-treatment condition. C1 (Critical priority, number 1 in sequence).

Red Box: B. Guidelines for timing and selection of pavement maintenance and rehabilitation options and expected performance impacts of each. C2 (Critical priority, number 2 in sequence).

 

Priorities

Critical = color-coded red box for critical priority
Very High = color-coded blue box for very high priority
High = color-coded green box for high priority
Sequence = number-coded boxes 1, 2, or 3 in sequence

 

Note: Sequence numbers denote the order in which Analysis Outcomes should be addressed for a given Objective. Analysis Outcomes with the same sequence number can be addressed at the same time.

 

Strategic Plan for LTPP Data Analysis

 

 

Office of Infrastructure R&D Links

» Office of Infrastructure R&D
» Infrastructure R&D Program
»Long-Term Bridge
  Performance Program

»Long-Term Pavement
  Performance Program
» Infrastructure R&D Experts
» Infrastructure R&D Laboratories
» Infrastructure R&D Projects
» Infrastructure R&D Publications
» Infrastructure R&D Topics

 

LTPP Email Distribution List

» Contact LTPP Customer Support Service Center at ltppinfo@dot.gov if you would like to be added to our email distribution list for LTPP Newsletters and other announcements.

 

FHWA Pavement Links

» Design
» Construction
» Preservation
» Maintenance
» Management
» Rehabilitation

 

More Information

 

Contacts

» Aramis Lopez
202-493-3145
E-mail Aramis
 
» Customer Service 202-493-3035
E-mail:LTPPinfo@dot.gov