PMSS Project Details

 

Project ID:FHWA-PROJ-11-0035
Project Name: Performance-Based Contractor Prequalification as an Alternative to Performance Bonds
Status: Active
Contact:Last Name:   Duval
First Name:   Richard
Telephone:  202-493-3365
E-mail:         Richard.DUVAL@dot.gov
Organization:Federal Highway Administration - Turner-Fairbank Highway Research Center (TFHRC)
Office: Office of Infrastructure Research and Development
Team: Pavement Design and Construction Team
Roadmap/Focus area(s): Infrastructure Research and Technology Strategic Plan and Roadmap
Project Description: This study investigates the costs and benefits of performance bonding versus replacing performance bonding, to various degrees, with performance-based contractor prequalification. The scope of the study covers all types of contracts for all types of work that are awarded by State highway agencies. The research involves the collection, organization, and analysis of data and information from State highway agencies, contractors, and sureties. The research product is a recommendation on the cost effectiveness of performance bonds, and if applicable, guidance for State highway agencies that wish to develop and transition to a performance-based contractor prequalification system and recommendations for how such systems can best be implemented.
Laboratories: Not Applicable
Start Date: April 27, 2011
End Date: May 1, 2013
Funding Amount:$359,858.00
FHWA Program Name: Innovative Pavement Research and Deployment
Goals:
Below are the key project objectives:
 
(1) Document the benefits and cost of the current system of performance bonding in highway construction.
(2) Quantify the benefits of replacing currently required performance bonds on some highway construction projects with a rigorous performance-based contractor prequalification system. 
(3) Provide State highway agencies with guidance on the development and implementation of the prequalification system.
Project Type: Offsite
Background Information: National Cooperative Highway Research Program (NCHRP) Synthesis 390, Performance-Based Construction Contractor Prequalification, reported that under the current system of performance bonding, “a contractor with a marginal track record but the same level of financial assets will receive the same bonding capacity, and hence the same opportunity to bid, as another contractor with a record of exemplary performance. This creates a situation in which the agency is subsidizing marginal performance, which in turn reduces the incentive for top performers to continue to superior performance.  Therefore, a contractor prequalification system that directly rewards good past performance and encourages poor performers to improve is needed to rectify this unintended consequence.”
Test Methodology: Data collection and analysis
Other Information: Data not yet available
Partners: Data not yet available
More Information URL(s):
Fieldtest: Data not yet available
Expected Benefits: The results of the research under this contract may make a case for replacing performance bonds with contractor prequalification, or in some other way recommend changes to derive greater benefits from using performance bonds or alternate methods of financial assurance.
Deliverables: 1. Name: Final report on guidance and recommendation for using replacing performance bonding with performance-based contractor prequalification.
Product Type(s): Research report
Description: Final report based on the annotated outline and detailing the work carried out in Tasks A through G, documenting the entire research and making a strong case, if applicable, for replacing performance bonding with performance-based contractor prequalification.
Audiences: Researchers, State highway agencies, Federal Turner-Fairbank Highway Research Center staff, Other highway agencies
Secondary Audiences:
2. Name: TechBrief - Brief summary of the findings for replacing performance bonding with performance-based contractor prequalification.
Product Type(s): Techbrief
Description: The TechBrief shall include the recommended performance-based contractor prequalification model program and provide guidance for its implementation.
Audiences: Researchers, State highway agencies, Federal Turner-Fairbank Highway Research Center staff
Secondary Audiences:
3. Name: PowerPoint Presentation
Product Type(s): Other, Promotional materials
Description: A PowerPoint slideshow will be prepared for presenting the results of this study to the highway agencies.
Audiences: Researchers, State highway agencies
Secondary Audiences:
Related URL(s):
Project Findings: Data not yet available
FHWA Topics: Roads and Bridges--Construction and Project Management
Roads and Bridges--Major Projects
TRT Terms: Performance Based Specifications
Contractors
Prequalifications
Data Collection
Infrastructure
Research
Construction
FHWA Disciplines: Construction and Project Management
Generalist
Subject Areas: Construction
Highways