Concrete Pavement: Premature Joint Deterioration
TBD: Outcome of mid-west pooled fund study
TYPE OF TRAINING: Instructor led training
LENGTH: 1.5 days
LOCATION:
SOURCE: Pooled Fund
SUBJECT: Materials: Concrete
POC: John.Bukowski@dot.gov
POC: Tom.Harman@dot.gov
POC: Neel.Vanikar@dot.gov
Disclaimer: The United States Government does not endorse products or manufacturers. Trademarks or manufacturers' names appear herein only because they are considered essential to the objective of this site, to share the most pertinent information available.