United States Department of Transportation - Federal Highway Administration FHWA Home Feedback
   CALENDAR OF EVENTS divider TRAINING divider TECHNOLOGY DEPLOYMENT divider TECHNICAL ASSISTANCE
   Home   divider  end of menu

Photo:  Multiple bridges

Structures Home
space image
Structures Solutions/Best Practices
space image
Structures Training
space image
Structures Newsletters & Publications
space image
Structures Media Center
space image
Structures Calendar
space image
Structures Links
space image

POLICY
space image
 

FHWA Resource Center

STRUCTURES TEAM


MID-ATLANTIC STATES

(PCEF) PRESTRESSED CONCRETE COMMITTEE FOR ECONOMICAL FABRICATION

CONSTRUCTION & PRODUCTION ISSUES FOR

REGION-WIDE UNFORMITY AND STANDARDIZATION

June 6, 2001

Ballot
Due Date: July 20, 2001

Instructions:
Please consider the balloted item for adoption by the PCEF committee as Construction and Production Region-wide Standardization Issues.
Cast one vote (A, B, or C) for the attached balloted item after coordinating within the inter-departments of the division. We strongly encourage all DOTs to participate in this ballot to facilitate this effort of economical fabrication within the region. Please sign, date, and return completed ballot by mail /fax on or before July 20, 2001 to the attention of subcommittee Chair, Lalith Galagedera:
Lalith Galagedera, PE
URS Corporation
10 Hale Street, 3rd Floor
Charleston, WV 25301
304.346.6707
Fax: 304.346.6708
E-mail: lalith_galagedera@urscorp.com

Ballot Options:


Select option A, if all the items listed in the balloted item are acceptable/approved. Select option B, if some of the items are acceptable. Select option C, only if totally disagreeable. In order for option C to be considered valid, an explanation for disapproval shall be included in the ballot by July 20, 2001. If absolutely necessary, additional time to provide support documentation shall be granted on a case by case basis.

Vote fot Balloted Item:

Item #1: Evaluation and acceptance criteria for Cracks


A. ____________ Approve - Accept the balloted Item in full.

B. ____________ Approve with comment - Accept the balloted item with the comments shown on the ballot or the attached document. We acknowledge that our comments may not be incorporated and therefore, we find the balloted item acceptable even if our comments are not incorporated.

C. ____________ Do not approve - We do not accept the balloted item(s) for the reason(s) as indicated. See suggestions and/or documentation attached for possible re-consideration of this Item entirely.


Signature: ___________________________________________________

Name: ___________________________________________________

Organization: _________________________________________________________________________________

Date: _________________________________

FHWA Resource Center logo
yellow circle
CONTACT US
staff / phones

Technical Service Teams
Air Quality

Civil Rights

Construction & Project Mgmt

Environment

Finance Services

Geotechnical

Hydraulics

Operations

Pavement & Materials

Planning

Safety & Design

Structures

FHWA Logo

FHWA Home | Feedback
United States Department of Transportation · Federal Highway Administration