FHWA Resource Center
STRUCTURES TEAM
Status of Implementation of NSBA/AASHTO Documents
Status of Implementation of NSBA/AASHTO Documents
G1.3 Guidelines for Shop Detail Drawing Presentation
Adopted
Under Consideration
Used as a Guide
Not Acceptable
Have Not Evaluated
Comments:_______________________________________
G1.2 Guidelines for Design Plan Presentation
Adopted
Under Consideration
Used as a Guide
Not Acceptable
Have Not Evaluated
Comments:_________________________________________
S2.1 Steel Bridge Fabrication Guide Specification
Adopted
Under Consideration
Used as a Guide
Not Acceptable
Have Not Evaluated
Comments:___________________________________________________
S4.1 Steel Bridge Fabrication QC/QA Guide Specification
Adopted
Under Consideration
Used as a Guide
Not Acceptable
Have Not Evaluated
Comments:________________________________________________
S8.1 Guide Specification for Coating Systems with Inorganic Zinc-Rich Primer
Adopted
Under
Consideration
Used
as a Guide
Not
Acceptable
Have Not
Evaluated
Comments:____________________________________________
G12.1 Guidelines for Design for Constructability
Adopted
Under Consideration
Used as a Guide
Not Acceptable
Have Not Evaluated
Comments:_____________________________
Organization: __________________________
Name: (optional) _______________________