United States Department of Transportation - Federal Highway Administration FHWA Home Feedback
   Skip to the content of the page.
   CALENDAR OF EVENTS divider TRAINING divider TECHNOLOGY DEPLOYMENT divider TECHNICAL ASSISTANCE divider
   Home   divider  Top FHWA News   divider  end of menu

Photo:  Multiple bridges

Structures Home
space image
Structures Solutions/Best Practices
space image
Structures Training
space image
Structures Newsletters & Publications
space image
Structures Media Center
space image
Structures Calendar
space image
Structures Links
space image

POLICY
space image
 

FHWA Resource Center

STRUCTURES TEAM

Procedure Qualification Record

Qualified Per: 5.12.1 5.12.2 5.13 Contractor (Fabricator)
Process PQR Prepared by:
Position (1G, 2G, 3G, 4G) Welder's name
Electrode( s) Mfg. Designation AWS Specification
Electrode Extension AWS Classification
Flux Mfg. Designation Active, Neutral, or Alloy Flux:


Electrode Diam. (inch) Current (amps) WFS* (ipm) Voltage (volts) Current & Polarity Travel Speed (IPM)


1
2
3 * wire feed may be used in lieu of current when a correlation curve is provided for the same electrode diameter and electrode extension.


Calculated Heat Input (KJ/ In) (See AWS D1.5 5.12)
Shielding Gas Flow Rate (cfph) Dew Point (° F)
Base Metal Thickness (In) Backing Thickness (In)
Base Metal and Backing Specification & Heat Nos. (Attach Certified Copies of Mill Test Reports)


A709 50W carbon equivalent % , carbon content %
Preheat Temp. (° F) Interpass Temp. (° F) Min. Max.
Welding Witness: Agency: Signature:


PHYSICAL AND NONDESTRUCTIVE TEST RESULTS (Complete below and attach laboratory reports)
SPECIMEN TEST RESULTS


All Weld Metal Tension (AWMT) Tensile Strength (psi)
Yield Strength (psi)
Elongation in 2 in. (%)
Reduction in Area (%)


Side Bends (accept/ reject) 1. 2. 3. 4.


Reduced Section Tension (psi) Tensile Strength 1. Location of Break 1. 2. 2.


Charpy V-Notch Impact ( , , , , ) Toughness of Weld Metal Avg. ft. lb. ** @ o F
(Ft. lbs.) ** Discard the highest and lowest values and average the remaining values.


Visual Acceptable? Radiographic Test Acceptable? (Attach RT Report)
Physical Tests witnessed by: Agency
Expiration Date (5 years for Non Fracture Critical): (3 years for Fracture Critical):


I attest that the above information is correct: Date: (Authorized representative of contractor (fabricator)

FHWA Resource Center logo
yellow circle
CONTACT US
staff / phones

Technical Service Teams
Air Quality

Civil Rights

Construction & Project Mgmt

Environment

Finance Services

Geotechnical

Hydraulics

Knowledge Application

Operations

Pavement & Materials

Planning

Safety & Design

Structures

FHWA Logo

FHWA Home | Feedback
United States Department of Transportation · Federal Highway Administration