United States Department of Transportation - Federal Highway Administration FHWA Home Feedback
   CALENDAR OF EVENTS divider TRAINING divider TECHNOLOGY DEPLOYMENT divider TECHNICAL ASSISTANCE
   Home   divider  end of menu

Photo:  Multiple bridges

Structures Home
space image
Structures Solutions/Best Practices
space image
Structures Training
space image
Structures Newsletters & Publications
space image
Structures Media Center
space image
Structures Calendar
space image
Structures Links
space image

POLICY
space image
 

FHWA Resource Center

STRUCTURES TEAM

Fillet Weld Soundness Test Results

Bureau of Construction & Materials Structural Materials Section Production Joint Welding Procedure Specification Procedure No: _____________ Date Issued: ___________
Revision No: ______ Rev. Date: ___________ D1.5-95


For PaDOT use only


Preheat and Interpass Temperature Chart Base metal
thickness range Minimum preheat (° F) Max Preheat & Interpass (° F)

1. Contractor (Fabricator) Prepared by:
2. Non-Fracture Critical _______ Fracture Critical _________ WPS Expiration date:
3. Qualified in accordance with (choose one):
5.11 (prequalified) ________ 5.12.1________ 5.12.2________ 5.13________
Referenced PQR No( s). ____________ ____________ ____________ ____________
Referenced Fillet Weld Soundness Test No( s). ___________ ____________ ____________
4. Material specification( s)
5. Material Thickness( es) (range)
6. Welding process
7. Manual, machine, or semiautomatic
8. Position( s) of welding
9. Filler metal specification
10. Filler metal classification and brand name
11. Flux class & brand (also specify: active, neutral or alloy)
12. Shielding gas Flow rate
13. Single or multiple pass
14. Single or multiple arc
15. Welding current
16. Polarity
17. Welding progression
18. Root treatment
19. Postheat treatment
20. Calculated Heat Input (KJ/ In) Min Max
21. Electrode extension (electrical stickout)


Welding Process Variables Joint Detail
Show relevant dimensions and AWS symbols Weld
size (In)


Pass
No( s). Electrode
Size


(In)
AMPS/ WFS* VOLTS


Travel
Speed (IPM)


*Wire feed speed may be used along with amperage (include chart)
Preparer's Signature:____________________________
Additional Shop Notes:

FHWA Resource Center logo
yellow circle
CONTACT US
staff / phones

Technical Service Teams
Air Quality

Civil Rights

Construction & Project Mgmt

Environment

Finance Services

Geotechnical

Hydraulics

Operations

Pavement & Materials

Planning

Safety & Design

Structures

FHWA Logo

FHWA Home | Feedback
United States Department of Transportation · Federal Highway Administration