United States Department of Transportation - Federal Highway Administration FHWA Home Feedback
   CALENDAR OF EVENTS divider TRAINING divider TECHNOLOGY DEPLOYMENT divider TECHNICAL ASSISTANCE
   Home   divider  end of menu

Photo:  Multiple bridges

Structures Home
space image
Structures Solutions/Best Practices
space image
Structures Training
space image
Structures Newsletters & Publications
space image
Structures Media Center
space image
Structures Calendar
space image
Structures Links
space image

POLICY
space image
 

FHWA Resource Center

STRUCTURES TEAM

Structural Committee for Economic Fabrication (SCEF)

MID-ATLANTIC STATES SCEF

INDEX TO DETAILS

101 Partial Payments for Structural Steel June 2000

102 Strip Seal Expansion Joints October 1994

103 Specifications for Application of Inorganic October 1994 Zinc-Rich Primer (Adoption of AASHTO/NSBA Steel Bridge XXXX Collaboration document S8.1)

104 Quality Assurance Manual-- October 1994 A Quality Control Plan B Acceptance Testing Plan (Adoption of AASHTO/NSBA Steel Bridge August 2006
Collaboration document S4.1-2002)

105 Elastomeric Bearings October 1994

106 High Load Multi-Rotational Bearings August 2006 (LRFD version)

107 Metric Structural Plans October 1996

108 Standard Welder Qualification Procedure for October 2000 Shielded Metal Arc Welding (SMAW)

109 Large Movement Expansion Joints: Septemb 2003 Tooth/Finger Joints with Trough

112 Design and Fabrication of Overhead August 2006 Sign Structures

English Drawing Details June 2000 (Adoption of AASHTO/NSBA Steel Bridge August 2007 Collaboration documents)

Metric Drawing Details June 2000


208 Bolted Field Splice Details April 2002

209 Large Movement Expansion Joints: XXXX Tooth/Finger Joints with Trough

210 Snipe Details for Welded Transverse and February 2004 Bearing Stiffeners

211 Standard Welding Forms

211.1 Procedure Qualification Record February 2004 AWS D1.5-2002
211.2 Production Joint Welding Procedure Specification February 2004 AWS D1.5-2002
211.3 Fillet Welding Soundness Test (FWST) Results February 2004 AWS D1.5-2002 Section 5.10
211.4 Production Joint Welding Procedure Specification February 2004 AWS D1.1-2002

212 Overhead Sign Structures February 2004212.1 Anchor Bolts
212.2 Pipe Chord Connections
212.3 Cope Hole Detail

FHWA Resource Center logo
yellow circle
CONTACT US
staff / phones

Technical Service Teams
Air Quality

Civil Rights

Construction & Project Mgmt

Environment

Finance Services

Geotechnical

Hydraulics

Operations

Pavement & Materials

Planning

Safety & Design

Structures

FHWA Logo

FHWA Home | Feedback
United States Department of Transportation · Federal Highway Administration