United States Department of Transportation - Federal Highway Administration FHWA Home Feedback
   Skip to the content of the page.
   CALENDAR OF EVENTS divider TRAINING divider TECHNOLOGY DEPLOYMENT divider TECHNICAL ASSISTANCE divider
   Home   divider  Top FHWA News   divider  end of menu

Photo:  Multiple bridges

Structures Home
space image
Structures Solutions/Best Practices
space image
Structures Training
space image
Structures Newsletters & Publications
space image
Structures Media Center
space image
Structures Calendar
space image
Structures Links
space image

POLICY
space image
 

FHWA Resource Center

STRUCTURES TEAM

QUESTIONNAIRE FOR MID-ATLANTIC REGION PCEF ABOUT
DESIGN CONSIDERATIONS FOR PRESTRESSED CONCRETE MEMBERS

State: ______________

1. Type of strands patterns at end of girders used within your state:

Check ALL that apply:
Allow in current specifications Have used in the past 10 years

Straight
Straight and Draped
Straight with unbonding
Combination: Straight, draped and unbonded

DESCRIBE CRITERIA:

2. Type of strands used within your state:

Check those that apply:
Allow in current specifications Have used in the past 10 years
½ “ diameter strands - low relaxation
½ “ diameter strands - stress relieved
½ “ diameter strands (Special 0.167 in2) low relaxation
½ “ diameter strands (Special 0.167 in2) stress relieved
0.6“ diameter strands - low relaxation
0.6“ diameter strands - stress relieved
7/16” diameter strands - low relaxation
7/16” diameter strands - stress relieved


DESCRIBE CRITERIA:

3. Standard spacing of strands used in standards in your state:
a. 2” spacing for ½“ strands Yes ______ No ______
b. 2” spacing for 0.6“ strands Yes ______ No ______
c. Other Yes ______ No ______

DESCRIBE CRITERIA:

4. Does the specification and/or state practices limit the amount of unbonding strands allowed at specific locations in the beams?

a. 25% of strands Yes ______ No ______
b. 25% at one third, one third, and one third * Yes ______ No ______
c. 25% at ½, and ½ ** Yes ______ No ______
d. Other Yes ______ No ______

* 25% with maximum of ? of debonded strands terminating at each location.
** 25% with maximum of ½ of debonded strands terminating at each location.

DESCRIBE CRITERIA:

5. Does the specification and/or state practices limit the location of unbonded strands?

a. Interior strands only Yes ______ No ______
b. Interior strands distributed uniformly Yes ______ No ______
c. Int. & Ext. strands distributed uniformly Yes ______ No ______
d. Other Yes ______ No ______

DESCRIBE CRITERIA:

6. What is the allowable tension stress in the precompressed tension zone (i.e., at or very near midspan at the bottom of the girder)?

a. Zero tension Yes ______ No ______
b. 3*sqrt(f’c) Yes ______ No ______
c. 6*sqrt(f’c) Yes ______ No ______

DESCRIBE CRITERIA:



7. Does the amount of allowable tension in the precompressed tension zone differ according to environment?

Environment Type Zero Tension 3*sqrt(f’c) 6*sqrt(f’c)
Normal Environment
Severe Environment
Other

DESCRIBE CRITERIA:

8. What criteria (if any) does the state have for determining the spacing of diaphragms?

a. Midspan and/or maximum of 40’ Yes ______ No ______
b. Midspan and/or maximum of 60’ Yes ______ No ______
c. Midspan and/or maximum of 80’ Yes ______ No ______

DESCRIBE CRITERIA:



9. What type of stirrup reinforcement is specified/allowed to minimize tripping hazards on the top of the prestressed concrete girder?

a. Pin type stirrups Yes ______ No ______
b. 2 - 90º type stirrups Yes ______ No ______
c. Bulb Tee with top tie bar w/ 90º bend Yes ______ No ______
d. Bulb Tee with top tie bar w/180º bend Yes ______ No ______
e. Other Yes ______ No ______

DESCRIBE CRITERIA:

Contact Person: Rodolfo (Rudy) F. Maruri
Virginia Division
Assistant Division Bridge Engineer

Telephone No.: (804) 775-3361
Email Address: rodolfo.maruri@fhwa.dot.gov

AND/OR

Claude S. Napier
Virginia Division
Division Bridge Engineer

Telephone No.: (804) 775-3363
Email Address: claude.napier@fhwa.dot.gov


Thank you for completing the questionnaire. A summary of compiled results will be presented at the PCEF Committee meeting

FHWA Resource Center logo
yellow circle
CONTACT US
staff / phones

Technical Service Teams
Air Quality

Civil Rights

Construction & Project Mgmt

Environment

Finance Services

Geotechnical

Hydraulics

Knowledge Application

Operations

Pavement & Materials

Planning

Safety & Design

Structures

FHWA Logo

FHWA Home | Feedback
United States Department of Transportation · Federal Highway Administration