FHWA Resource Center
STRUCTURES TEAM
SCEF Meetings
Status of Implementation of AASHTO/NSBA
Steel Bridge Collaboration Documents
G1.1 Guidelines for Shop Drawing Review and Approval
___ Adopted ___ Under Consideration ___ Used as a Guide ___ Not Acceptable
___Have Not Evaluated
Comments: ________________________________________________________________________________
G1.3 Guidelines for Shop Detail Drawing Presentation
Adopted Under Consideration Used as a Guide Not Acceptable Have Not
Evaluated
Comments:_______________________________________________________________________________
G1.2 Guidelines for Design Plan Presentation
Adopted Under Consideration Used as a Guide Not Acceptable Have Not
Evaluated
Comments:_______________________________________________________________________________
S2.1 Steel Bridge Fabrication Guide Specification
Adopted Under Consideration Used as a Guide Not Acceptable Have Not
Evaluated
Comments:_______________________________________________________________________________
S4.1 Steel Bridge Fabrication QC/QA Guide Specification
Adopted Under Consideration Used as a Guide Not Acceptable Have Not
Evaluated
Comments:_______________________________________________________________________________
S8.1 Guide Specification for Coating Systems with Inorganic Zinc-Rich
Primer
Adopted Under Consideration Used as a Guide Not Acceptable Have Not
Evaluated
Comments:_______________________________________________________________________________
G12.1 Guidelines for Design for Constructability
Adopted Under Consideration Used as a Guide Not Acceptable Have Not
Evaluated
Comments:_______________________________________________________________________________
Organization: __________________________ Name: (optional) _______________________