AL | AL178 | Atmore, Alabama Road Improvement | 250,000 | 245,000 | | 245,000 | |
AL | AL179 | Church Street Overpass, Huntsville, AL | 1,000,000 | 980,000 | | 980,000 | |
AL | AL180 | City of Tuscaloosa Downtown Revitalization Project, AL--Twenty First Avenue Phase I and University Boulevard Phase III, AL | 4,200,000 | 4,116,000 | | 4,116,000 | |
AL | AL181 | Southside bridge replacement, Etowah County, AL | 1,000,000 | 980,000 | | 980,000 | |
AL | AL182 | Wall Triana Road Project, Madison County, AL | 500,000 | 490,000 | | 490,000 | |
AL | AL183 | Winchester Road Widening, City of Huntsville, AL | 750,000 | 735,000 | | 735,000 | |
Alabama | | | | | 7,546,000 | | 7,546,000 |
AR | AR133 | Bella Vista Bypass, AR | 500,000 | 490,000 | | 490,000 | |
AR | AR134 | Highway 165 Overpass, Stuttgart, AR | 500,000 | 490,000 | | 490,000 | |
AR | AR135 | Highway 71/Future Interstate 49 Development and Construction between Louisiana Line and Doddridge, AR | 1,000,000 | 980,000 | | 980,000 | |
AR | AR136 | Highway 77 Rail Grade Separation, Marion, AR | 500,000 | 490,000 | | 490,000 | |
AR | AR137 | I-555 Access Road, Poinsett County, AR | 1,000,000 | 980,000 | | 980,000 | |
AR | AR138 | Westside (Caraway) Overpass, City of Jonesboro, AR | 1,840,000 | 1,803,200 | | 1,803,200 | |
Arkansas | | | | | 5,233,200 | | 5,233,200 |
AZ | AZ073 | Houghton Road Corridor Bridge Replacement, Tucson, AZ | 750,000 | 735,000 | | 735,000 | |
AZ | AZ074 | Indian Bend Road Improvements, Scottsdale, AZ | 1,000,000 | 980,000 | | 980,000 | |
AZ | AZ075 | Twin Peaks Corridor Project, Marana, AZ | 1,500,000 | 1,470,000 | | 1,470,000 | |
Arizona | | | | | 3,185,000 | | 3,185,000 |
CA | CA800 | 16th Street, San Miguel Railroad Crossing Safety, CA | 250,000 | 245,000 | | 245,000 | |
CA | CA801 | Airport Boulevard/Highway 101 Interchange, Monterey, CA | 500,000 | 490,000 | | 490,000 | |
CA | CA802 | Blossom Hill/Monterey Highway Crossing, San Jose, CA | 500,000 | 490,000 | | 490,000 | |
CA | CA803 | Brentwood Boulevard/SR 4 Improvements, Brentwood, CA | 750,000 | 735,000 | | 735,000 | |
CA | CA804 | Bristol Street Widening, Orange County, CA | 670,000 | 656,600 | | 656,600 | |
CA | CA805 | Dorsey Drive Interchange in Grass Valley, CA | 750,000 | 735,000 | | 735,000 | |
CA | CA806 | Friant Corridor, CA | 500,000 | 490,000 | | 490,000 | |
CA | CA807 | Fullerton, CA-State College/BNSF Grade Separation, CA | 500,000 | 490,000 | | 490,000 | |
CA | CA808 | Golden Gate Bridge Moveable Median Barrier, CA | 500,000 | 490,000 | | 490,000 | |
CA | CA809 | Grade Separations in Riverside, CA | 1,420,000 | 1,391,600 | | 1,391,600 | |
CA | CA810 | Highland Park Streetscape, Los Angeles, CA | 250,000 | 245,000 | | 245,000 | |
CA | CA811 | Lincoln Bypass on SR65 in Placer County, CA | 950,000 | 931,000 | | 931,000 | |
CA | CA812 | Los Banos Bypass--SR 152; Merced, CA | 500,000 | 490,000 | | 490,000 | |
CA | CA813 | Mission Road Beautification Project, Alhambra, CA | 250,000 | 245,000 | | 245,000 | |
CA | CA814 | Mission Street Pedestrian Improvements, South Pasadena, CA | 250,000 | 245,000 | | 245,000 | |
CA | CA815 | Montclair, CA Ramona Ave grade separation, CA | 250,000 | 245,000 | | 245,000 | |
CA | CA816 | Monterey Bay Sanctuary Scenic Trail, CA | 500,000 | 490,000 | | 490,000 | |
CA | CA817 | Park Place Extension and Railroad Grade Separation, El Segundo, CA | 750,000 | 735,000 | | 735,000 | |
CA | CA818 | Park Street Streetscape Improvement, Alameda, CA | 500,000 | 490,000 | | 490,000 | |
CA | CA819 | Potrero Boulevard/SR 60 Interchange, Beaumont, CA | 1,500,000 | 1,470,000 | | 1,470,000 | |
CA | CA820 | Reconstruct French Camp/I-5 interchange and Sperry Road Connection, San Joaquin County, CA | 1,000,000 | 980,000 | | 980,000 | |
CA | CA821 | Repair of San Tomas Expressway Box Culvert, Santa Clara County, CA | 500,000 | 490,000 | | 490,000 | |
CA | CA822 | Resurfacing and Reconstruction of Pacific Boulevard, Huntington Park, CA | 800,000 | 784,000 | | 784,000 | |
CA | CA823 | Rice Avenue Interchange at U.S. Highway 101, Ventura County, CA | 500,000 | 490,000 | | 490,000 | |
CA | CA824 | Santa Clarita Cross Valley Connector, CA | 500,000 | 490,000 | | 490,000 | |
CA | CA825 | SFgo Market Street improvements, San Francisco, CA | 500,000 | 490,000 | | 490,000 | |
CA | CA826 | Sheila Street at Commerce Way Improvements, Commerce, CA | 500,000 | 490,000 | | 490,000 | |
CA | CA827 | Shoal Creek Pedestrian Bridge, CA | 250,000 | 245,000 | | 245,000 | |
CA | CA828 | Sidewalk Construction in Ashland/Cherryland, CA | 750,000 | 735,000 | | 735,000 | |
CA | CA829 | Slauson Avenue Corrider Improvement Project, Maywood, CA | 800,000 | 784,000 | | 784,000 | |
CA | CA830 | University Parkway/I-215, San Bernardino, CA | 750,000 | 735,000 | | 735,000 | |
CA | CA831 | VTA High Occupancy Toll Lane Demonstration Project, Santa Clara County, CA | 500,000 | 490,000 | | 490,000 | |
CA | CA832 | West Vista Way widening, CA | 250,000 | 245,000 | | 245,000 | |
CA | CA833 | Westchester Streetscape Improvement Project, CA | 1,000,000 | 980,000 | | 980,000 | |
California | | | | | 20,227,200 | | 20,227,200 |
CO | CO122 | U.S. 287 at Lamar, Colorado: Ports to Plains, CO | 1,340,000 | 1,313,200 | | 1,313,200 | |
CO | CO123 | Wadsworth Interchange/State Highway 128, CO | 600,000 | 588,000 | | 588,000 | |
Colorado | | | | | 1,901,200 | | 1,901,200 |
CT | CT165 | Atlantic Rail Underpass and Road Realignment Project, CT | 250,000 | 245,000 | | 245,000 | |
CT | CT166 | Depot Street Bridge Revitalization, Beacon Falls, CT | 1,600,000 | 1,568,000 | | 1,568,000 | |
CT | CT167 | Fall Mountain Water Road Paving, Plymouth, CT | 500,000 | 490,000 | | 490,000 | |
CT | CT168 | Mystic River Bridge Rehabilitation, CT | 1,000,000 | 980,000 | | 980,000 | |
CT | CT169 | Naugatuck River Greenway Design Study, CT | 150,000 | 147,000 | | 147,000 | |
CT | CT170 | North Main Street Streetscape Enhancements, CT | 234,500 | 229,810 | | 229,810 | |
CT | CT171 | Pedestrian Plaza Improvements at the Connecticut Science Center in Hartford, CT | 670,000 | 656,600 | | 656,600 | |
CT | CT172 | Redevelopment of Front Street and Constitution Way in Hartford, CT | 1,340,000 | 1,313,200 | | 1,313,200 | |
CT | CT173 | Torrington Gateway, CT | 240,000 | 235,200 | | 235,200 | |
CT | CT174 | U.S. 44 Improvements, Avon, CT | 750,000 | 735,000 | | 735,000 | |
Connecticut | | | | | 6,599,810 | | 6,599,810 |
DC | DC033 | American Veterans Disabled for Life Memorial Related Transportation Improvements, DC | 1,000,000 | 980,000 | | 980,000 | |
DC | DC034 | Forest City Southeast Federal Center and Anacostia Waterfront Improvements, DC | 500,000 | 490,000 | | 490,000 | |
DC | DC035 | South Capitol Street Corridor Improvements, DC | 500,000 | 490,000 | | 490,000 | |
District of Columbia | | | | | 1,960,000 | | 1,960,000 |
DE | DE035 | DelTrac Integrated Transportation Management System, DE | 804,000 | 787,920 | | 787,920 | |
DE | DE036 | Port of Wilmington Rail Improvement Project, DE | 1,005,000 | 984,900 | | 984,900 | |
Delaware | | | | | 1,772,820 | | 1,772,820 |
FL | FL342 | 118th Avenue Expressway--Pinellas County, FL | 1,750,000 | 1,715,000 | | 1,715,000 | |
FL | FL343 | Beckett Bascule Bridge Alternative Analysis, FL | 100,000 | 98,000 | | 98,000 | |
FL | FL344 | Belleview Bypass, Marion County, FL | 250,000 | 245,000 | | 245,000 | |
FL | FL345 | Burnt Store Road: Evacuation Route Widening, FL | 200,000 | 196,000 | | 196,000 | |
FL | FL346 | City of Miami Beach Atlantic Corridor Greenway, FL | 500,000 | 490,000 | | 490,000 | |
FL | FL347 | Expands SR 46 to 4-lanes, Sanford, FL | 500,000 | 490,000 | | 490,000 | |
FL | FL348 | Four Lane State Road 87 Santa Rosa County, FL | 500,000 | 490,000 | | 490,000 | |
FL | FL349 | Grand Lagoon Bridge Replacement and Thomas Drive Widening Project, Bay County, FL | 500,000 | 490,000 | | 490,000 | |
FL | FL350 | Hurricane Evacuation Route Signalization, FL | 250,000 | 245,000 | | 245,000 | |
FL | FL351 | Indian Street Bridge, Martin County, FL | 1,000,000 | 980,000 | | 980,000 | |
FL | FL352 | Interchanger at Interstate and University Parkway, FL | 1,000,000 | 980,000 | | 980,000 | |
FL | FL353 | Mahan Drive Phase II, Leon County, FL | 725,000 | 710,500 | | 710,500 | |
FL | FL354 | Palm Bay Parkway, Palm Bay, FL | 2,760,000 | 2,704,800 | | 2,704,800 | |
FL | FL355 | State Road 9B, St. Johns County, FL | 500,000 | 490,000 | | 490,000 | |
FL | FL356 | TECO Line Streetcar System Extension, Tampa, FL | 1,000,000 | 980,000 | | 980,000 | |
FL | FL357 | U.S. 17-92-US 192, Kissimmee, FL | 1,000,000 | 980,000 | | 980,000 | |
FL | FL358 | U.S. 41 Enhancements, Charlotte County, FL | 500,000 | 490,000 | | 490,000 | |
FL | FL359 | U.S.-41 Capacity Improvements in Lee County, FL | 100,000 | 98,000 | | 98,000 | |
Florida | | | | | 12,872,300 | | 12,872,300 |
GA | GA333 | Downtown Development Authority District Streetscape, Dahlonega GA | 100,000 | 98,000 | | 98,000 | |
GA | GA334 | Glenwood Road Pedestrian Safety Improvements, DeKalb County, GA | 1,000,000 | 980,000 | | 980,000 | |
GA | GA335 | McGinnis Ferry Road--Gwinnett County, GA | 400,000 | 392,000 | | 392,000 | |
GA | GA336 | SR 151 at CR 162/Colbert Hollow Road, Catoosa County, GA | 150,000 | 147,000 | | 147,000 | |
GA | GA337 | SR 8/US 29 Plsnt. Hl/Lester Rd., Gwinnett Co., GA | 400,000 | 392,000 | | 392,000 | |
GA | GA338 | SR 9 south of Cumming from SR 141 to SR 20, GA | 250,000 | 245,000 | | 245,000 | |
GA | GA339 | State Road 39/State Road 91 and US 84 Improvements, Donalsonville, GA | 750,000 | 735,000 | | 735,000 | |
GA | GA340 | State Road 982/Talbotton Road Improvements, Columbus, GA | 750,000 | 735,000 | | 735,000 | |
GA | GA341 | Terry Creek Bridge Widening, GA | 1,000,000 | 980,000 | | 980,000 | |
Georgia | | | | | 4,704,000 | | 4,704,000 |
ID | ID061 | College of Southern Idaho Student Safety Initiative, ID | 480,000 | 470,400 | | 470,400 | |
ID | ID062 | I-84, Exit 29 (Franklin Road) Local Systems Improvement, ID | 480,000 | 470,400 | | 470,400 | |
ID | ID063 | Lewiston Partnership Project, ID | 240,000 | 235,200 | | 235,200 | |
ID | ID064 | U.S.-95, Thorncreek Road to Moscow, ID | 500,000 | 490,000 | | 490,000 | |
Idaho | | | | | 1,666,000 | | 1,666,000 |
IL | IL551 | Algonquin Road Extension, McHenry County, IL | 250,000 | 245,000 | | 245,000 | |
IL | IL552 | Grand Avenue Underpass, Chicago, IL | 1,340,000 | 1,313,200 | | 1,313,200 | |
IL | IL553 | I-355 Corridor Improvement Project, IL | 435,000 | 426,300 | | 426,300 | |
IL | IL554 | Jack Dame Road Extension, City of Rochelle, IL | 250,000 | 245,000 | | 245,000 | |
IL | IL555 | Lincoln/Belmont/Ashland Streetscape Project, Chicago, IL | 1,250,000 | 1,225,000 | | 1,225,000 | |
IL | IL556 | Milwaukee Avenue Reconstruction Project, Chicago, IL | 1,250,000 | 1,225,000 | | 1,225,000 | |
IL | IL557 | Morgan Street Improvments, City of Elmwood, IL | 250,000 | 245,000 | | 245,000 | |
IL | IL558 | North Seminary Street Railroad Grade Separation Bridge, Galesburg, IL | 500,000 | 490,000 | | 490,000 | |
IL | IL559 | Oak Ridge Cemetery, Springfield, IL | 250,000 | 245,000 | | 245,000 | |
IL | IL560 | Reconstruction of the Wood Dale and Irving Park Rd, IL | 500,000 | 490,000 | | 490,000 | |
IL | IL561 | River Tech Boulevard Road Construction, Moline, IL | 1,200,000 | 1,176,000 | | 1,176,000 | |
IL | IL562 | Sheridan Crossing improvements, North Chicago, IL | 250,000 | 245,000 | | 245,000 | |
IL | IL563 | Southwest Rochelle Truck Loop, Ogle County, IL | 100,500 | 98,490 | | 98,490 | |
IL | IL564 | Street extension, Champaign, IL | 500,000 | 490,000 | | 490,000 | |
IL | IL565 | Twin Bridge Road, Decatur, IL | 500,000 | 490,000 | | 490,000 | |
IL | IL566 | U.S. Rt 40 Water St. to Evergreen Ave, Teutopolis, IL | 400,000 | 392,000 | | 392,000 | |
IL | IL567 | White County, IL | 100,000 | 98,000 | | 98,000 | |
Illinois | | | | | 9,138,990 | | 9,138,990 |
IN | IN240 | 18th Street Corridor and Railroad Crossing Project, Logansport, IN | 350,000 | 343,000 | | 343,000 | |
IN | IN241 | Calumet Avenue and 45th Street Grade Separation, Munster, IN | 1,250,000 | 1,225,000 | | 1,225,000 | |
IN | IN242 | Fort Wayne Clinton Street Bridge Replacement, IN | 1,420,000 | 1,391,600 | | 1,391,600 | |
IN | IN243 | Improve bike trails in Highland, IN | 400,000 | 392,000 | | 392,000 | |
IN | IN244 | Renovation of Monument Circle, Indianapolis, IN | 335,000 | 328,300 | | 328,300 | |
IN | IN245 | Ronald Reagan Parkway, Hendricks County, Indiana | 500,000 | 490,000 | | 490,000 | |
IN | IN246 | State Road 62/337 Construction, Harrison County, IN | 1,250,000 | 1,225,000 | | 1,225,000 | |
IN | IN247 | Study Improvements to 109th Avenue, Winfield, IN | 250,000 | 245,000 | | 245,000 | |
IN | IN248 | U.S. 31 Freeway Upgrade Project in Marshall, Fulton, Miami and Tipton Counties, IN | 350,000 | 343,000 | | 343,000 | |
Indiana | | | | | 5,982,900 | | 5,982,900 |
IA | IA220 | 19th Street SW Grade Separation Mason City, IA | 1,100,000 | 1,078,000 | | 1,078,000 | |
IA | IA221 | CEMAR Trail, IA | 335,000 | 328,300 | | 328,300 | |
IA | IA222 | Cold Storage Spur Line, IA | 1,170,000 | 1,146,600 | | 1,146,600 | |
IA | IA223 | Roger Snedden Drive Grade Separation Boone, IA | 500,000 | 490,000 | | 490,000 | |
IA | IA224 | Warren County, Southwest Connector Interchange, IA | 550,000 | 539,000 | | 539,000 | |
Iowa | | | | | 3,581,900 | | 3,581,900 |
KS | KS115 | 159th Street bridge replacement, Andover, KS | 1,000,000 | 980,000 | | 980,000 | |
KS | KS116 | 87th Street Parkway Improvements, Lenexa, KS | 250,000 | 245,000 | | 245,000 | |
KS | KS117 | Interchange Construction at US-73 and 20th Street, Leavenworth, KS | 700,000 | 686,000 | | 686,000 | |
KS | KS118 | Intersection Rehabilitation and Improvements, US-24 and Marlatt Avenue, Manhattan, KS | 700,000 | 686,000 | | 686,000 | |
KS | KS119 | Intersection Rehabilitation, US-166 and US-169, Montgomery County, KS | 600,000 | 588,000 | | 588,000 | |
KS | KS120 | Reconstruction of Two Interchanges on I-235, Wichita, KS | 700,000 | 686,000 | | 686,000 | |
KS | KS121 | Reconstruction of US-50 in Gray County, KS | 600,000 | 588,000 | | 588,000 | |
KS | KS122 | Reconstruction of US-50 in Reno County, KS | 500,000 | 490,000 | | 490,000 | |
KS | KS123 | Replacement of the Big River Bridge on US-77, KS | 500,000 | 490,000 | | 490,000 | |
KS | KS124 | U.S. 54 Greenburg, KS | 600,000 | 588,000 | | 588,000 | |
KS | KS125 | U.S. 69 Improvements, Crawford County, KS | 1,000,000 | 980,000 | | 980,000 | |
Kansas | | | | | 7,007,000 | | 7,007,000 |
KY | KY176 | 21st Century Parks Project in Louisville, KY | 6,000,000 | 5,880,000 | | 5,880,000 | |
KY | KY177 | Interstate 66 Pike County, KY | 1,000,000 | 980,000 | | 980,000 | |
KY | KY178 | Interstate 66 Somerset to London, KY | 1,500,000 | 1,470,000 | | 1,470,000 | |
KY | KY179 | Lexington Traffic Movement and Revitalization Study, Lexington, KY | 500,000 | 490,000 | | 490,000 | |
KY | KY180 | Paducah Waterfront Development Project, KY | 4,000,000 | 3,920,000 | | 3,920,000 | |
KY | KY181 | South Airport Connector Road, Boone County, KY | 250,000 | 245,000 | | 245,000 | |
Kentucky | | | | | 12,985,000 | | 12,985,000 |
LA | LA194 | Baton Rouge Riverfront Development and Levee Pedestrian and Bike Path, LA | 1,000,000 | 980,000 | | 980,000 | |
LA | LA195 | Bossier Parish Congestion Relief Program, LA | 1,812,000 | 1,775,760 | | 1,775,760 | |
LA | LA196 | Greater Ouachita Port and Intermodal Facility, LA | 500,000 | 490,000 | | 490,000 | |
LA | LA197 | I-69, LA | 2,800,000 | 2,744,000 | | 2,744,000 | |
LA | LA198 | LA 675 Lane Improvements, Iberia Parish, LA | 500,000 | 490,000 | | 490,000 | |
LA | LA199 | LA-42; Ascension Parish, LA | 250,000 | 245,000 | | 245,000 | |
LA | LA200 | U.S. 11 Corridor Improvements, St. Tammany Parish, LA | 2,000,000 | 1,960,000 | | 1,960,000 | |
LA | LA201 | Widening of LA 16; Livingston Parish, LA | 250,000 | 245,000 | | 245,000 | |
Louisiana | | | | | 8,929,760 | | 8,929,760 |
ME | ME078 | Arnold Bridge Improvement, Willimantic, ME | 500,000 | 490,000 | | 490,000 | |
ME | ME079 | Somerset Street Extension, Portland, ME | 500,000 | 490,000 | | 490,000 | |
Maine | | | | | 980,000 | | 980,000 |
MD | MD157 | Crisfield County Dock, Somerset County, MD | 100,000 | 98,000 | | 98,000 | |
MD | MD158 | Gwynns Falls Trail/CSX Bridge, MD | 335,000 | 328,300 | | 328,300 | |
MD | MD159 | MD 237, Pegg Road to MD 235, St. Mary's County, MD | 1,000,000 | 980,000 | | 980,000 | |
MD | MD160 | MD 246/MD 235 to Saratoga Drive, Lexington Park, MD | 500,000 | 490,000 | | 490,000 | |
MD | MD161 | Route 5 Overpass and River Center, St. Mary's County, MD | 500,000 | 490,000 | | 490,000 | |
MD | MD162 | Suitland Road Gateway Project, Prince George's County, MD | 1,000,000 | 980,000 | | 980,000 | |
MD | MD163 | U.S. 301 Improvement in Charles and Prince George's County, MD | 1,000,000 | 980,000 | | 980,000 | |
Maryland | | | | | 4,346,300 | | 4,346,300 |
MA | MA238 | Blackstone River Canal Replication Project, Worcester, MA | 750,000 | 735,000 | | 735,000 | |
MA | MA239 | Downtown Streetscape Improvements, Framingham, MA | 500,000 | 490,000 | | 490,000 | |
MA | MA240 | Edwards Street Improvement, Springfield, MA | 750,000 | 735,000 | | 735,000 | |
MA | MA241 | Holy Cross Road Safety Project, Worcester, MA | 750,000 | 735,000 | | 735,000 | |
MA | MA242 | Massachusetts Avenue Design and Recontruction, Arlington, MA | 750,000 | 735,000 | | 735,000 | |
MA | MA243 | Massachusetts Landscape Connectivity Study, MA | 200,000 | 196,000 | | 196,000 | |
MA | MA244 | Northern Avenue Bridge Revitilzation, MA | 1,000,000 | 980,000 | | 980,000 | |
MA | MA245 | Pittsfield Downtown Streetscape, MA | 1,500,000 | 1,470,000 | | 1,470,000 | |
MA | MA246 | Reconstruction of Commonwealth Avenue, Boston, MA | 1,000,000 | 980,000 | | 980,000 | |
MA | MA247 | Route 116 and Bay Road Intersection and Road Improvements, Amherst, MA | 1,500,000 | 1,470,000 | | 1,470,000 | |
MA | MA248 | Route 195/Coggeshall Street Interchange, New Bedford, MA | 500,000 | 490,000 | | 490,000 | |
MA | MA249 | Community Transportation Association of America, Nationwide Joblinks | 882,000 | 882,000 | | 882,000 | |
Massachusetts | | | | | 9,016,000 | | 9,016,000 |
MI | MI297 | Belleville Road/Ecorse Road Intersection, Wayne County, MI | 750,000 | 735,000 | | 735,000 | |
MI | MI298 | Greenway Path and Bridge, Southgate, Wayne County, MI | 250,000 | 245,000 | | 245,000 | |
MI | MI299 | Maple Rd. SCATS signals; Bloomfield Twp. 6 miles, MI | 1,000,000 | 980,000 | | 980,000 | |
MI | MI300 | Maple Rd. widening; 1.5 Miles; Walled Lake City, MI | 500,000 | 490,000 | | 490,000 | |
MI | MI301 | Northwestern Corridor Roundabouts; ROW and Construction, MI | 1,000,000 | 980,000 | | 980,000 | |
MI | MI302 | Pinnacle Aeropark, Wayne County, MI | 670,000 | 656,600 | | 656,600 | |
MI | MI303 | Port Huron, NAFTA Corridor Congestion Mitigation Project, Phase I, MI | 670,000 | 656,600 | | 656,600 | |
MI | MI304 | Walton Boulevard Bridge widening, MI | 500,000 | 490,000 | | 490,000 | |
Michigan | | | | | 5,233,200 | | 5,233,200 |
MN | MN247 | Blue Earth CSAH 12 Extension/TH 14 Interchange, MN | 1,340,000 | 1,313,200 | | 1,313,200 | |
MN | MN248 | Cambridge-Isanti Bike/Walk Trail, MN | 700,000 | 686,000 | | 686,000 | |
MN | MN249 | Highway 610 Corridor, MN | 500,000 | 490,000 | | 490,000 | |
MN | MN250 | Snelling Avenue/University Avenue Intersection Redesign, St. Paul, MN | 500,000 | 490,000 | | 490,000 | |
Minnesota | | | | | 2,979,200 | | 2,979,200 |
MS | MS192 | East Brandon Bypass, MS | 750,000 | 735,000 | | 735,000 | |
MS | MS193 | East Metropolitan Corridor, MS | 3,000,000 | 2,940,000 | | 2,940,000 | |
MS | MS194 | Highway 9 4-Lane Corridor, MS | 3,000,000 | 2,940,000 | | 2,940,000 | |
MS | MS195 | Hugh White State Park Access Road, Grenada, MS | 1,000,000 | 980,000 | | 980,000 | |
MS | MS196 | I-55/Gluckstadt Interchange Improvements, MS | 1,500,000 | 1,470,000 | | 1,470,000 | |
MS | MS197 | Martin Bluff Road, MS | 1,700,000 | 1,666,000 | | 1,666,000 | |
MS | MS198 | Northside Drive, Clinton, MS | 3,250,000 | 3,185,000 | | 3,185,000 | |
MS | MS199 | Star Landing Road Corridor, DeSoto County, MS | 2,400,000 | 2,352,000 | | 2,352,000 | |
MS | MS200 | U.S. Highway 49/Highway 7 Connector, MS | 2,750,000 | 2,695,000 | | 2,695,000 | |
MS | MS201 | Urban Collector Road, Jackson and Harrison Counties, MS | 2,000,000 | 1,960,000 | | 1,960,000 | |
Mississippi | | | | | 20,923,000 | | 20,923,000 |
MO | MO201 | Grant City Downtown Square Street Improvments, MO | 375,000 | 367,500 | | 367,500 | |
MO | MO202 | Heart of America Bicycle/Pedestrian Bridge, MO | 562,500 | 551,250 | | 551,250 | |
MO | MO203 | Highway 13 at Broadmoor Intersection in Springfield, MO | 375,000 | 367,500 | | 367,500 | |
MO | MO204 | Highway 13 Bypass, MO | 2,250,000 | 2,205,000 | | 2,205,000 | |
MO | MO205 | Improvements to Route 266 and Interchange with Interstate 44, MO | 2,250,000 | 2,205,000 | | 2,205,000 | |
MO | MO206 | Joe Dice Suspension Bridge, MO | 562,500 | 551,250 | | 551,250 | |
MO | MO207 | MO 740 (Stadium Boulevard) Extension, MO | 300,000 | 294,000 | | 294,000 | |
MO | MO208 | Nash Road/Route AB, Cape Girardeau County, MO | 800,000 | 784,000 | | 784,000 | |
MO | MO209 | New Alignment South Bridge, MO | 2,125,000 | 2,082,500 | | 2,082,500 | |
MO | MO210 | Paseo Street Corridor Improvements, MO | 562,500 | 551,250 | | 551,250 | |
MO | MO211 | Route 221, St. Francois and Iron Counties, MO | 250,000 | 245,000 | | 245,000 | |
MO | MO212 | Route 63, Howell/Oregon Counties, MO | 250,000 | 245,000 | | 245,000 | |
MO | MO213 | Route Y, Stoddard County MO | 500,000 | 490,000 | | 490,000 | |
MO | MO214 | Rt. 47 and Warrior Ave., Warrenton, MO | 200,000 | 196,000 | | 196,000 | |
MO | MO215 | U.S. 54 Corridor Expansion, MO | 750,000 | 735,000 | | 735,000 | |
MO | MO216 | U.S. 60 Corridor Improvements, MO | 562,500 | 551,250 | | 551,250 | |
MO | MO217 | U.S. 63 and Gans Road Overpass, MO | 750,000 | 735,000 | | 735,000 | |
MO | MO218 | Upgrade and partly relocate MO Rt 141, St L County, MO | 250,000 | 245,000 | | 245,000 | |
MO | MO219 | Upgrade MO Rt 94 (Page Ext Ph 2), St Chas Cnty, MO | 250,000 | 245,000 | | 245,000 | |
MO | MO220 | Uptown St. Joseph Transportation District, MO | 1,500,000 | 1,470,000 | | 1,470,000 | |
Missouri | | | | | 15,116,500 | | 15,116,500 |
MT | MT061 | Bridge over Broadway, Missoula to Rattlesnake National Recreation Area, MT | 670,000 | 656,600 | | 656,600 | |
MT | MT062 | Kalispell Bypass, MT | 4,020,000 | 3,939,600 | | 3,939,600 | |
MT | MT063 | Shiloh Road Corridor, Billings, MT | 4,690,000 | 4,596,200 | | 4,596,200 | |
Montana | | | | | 9,192,400 | | 9,192,400 |
NE | NE093 | Antelope Valley Transportation Improvements, NE | 500,000 | 490,000 | | 490,000 | |
NE | NE094 | Realignment of Saddle Creek Road, NE | 1,340,000 | 1,313,200 | | 1,313,200 | |
NE | NE095 | U.S. 30, Columbus Viaduct Replacement, NE | 500,000 | 490,000 | | 490,000 | |
Nebraska | | | | | 2,293,200 | 0 | 2,293,200 |
NV | NV082 | Boulder City Bypass Project, NV | 250,000 | 245,000 | | 245,000 | |
NV | NV083 | Henderson Lake Mead Parkway, NV | 200,000 | 196,000 | | 196,000 | |
NV | NV084 | Mountain Edge Parkway Environmental Assessment, Las Vegas, NV | 750,000 | 735,000 | | 735,000 | |
NV | NV085 | Reno Rail Access Corridor Enhancements, NV | 500,000 | 490,000 | | 490,000 | |
Nevada | | | | | 1,666,000 | | 1,666,000 |
NH | NH077 | Chocorua Village Safety Improvement Project, Tamworth, NH | 500,000 | 490,000 | | 490,000 | |
NH | NH078 | Downtown Franklin Revitalization, Franklin, NH | 800,000 | 784,000 | | 784,000 | |
NH | NH079 | Granite Street Reconstruction Project, NH | 1,700,000 | 1,666,000 | | 1,666,000 | |
NH | NH080 | Little Bay Bridges/Spaulding Turnpike, NH | 1,750,000 | 1,715,000 | | 1,715,000 | |
New Hampshire | | | | | 4,655,000 | | 4,655,000 |
NJ | NJ285 | Battleship New Jersey Access Road (Clinton Street) Repaving Project, NJ | 422,100 | 413,658 | | 413,658 | |
NJ | NJ286 | Bridge Street, Clay Street, Jackson Street Bridges, Essex County, NJ | 1,000,000 | 980,000 | | 980,000 | |
NJ | NJ287 | Downtown Streetscape Project, New Providence, NJ | 250,000 | 245,000 | | 245,000 | |
NJ | NJ288 | Route 22 Sustainable Corridor, Somerset County, NJ | 4,000,000 | 3,920,000 | | 3,920,000 | |
NJ | NJ289 | Route 29 Boulevard Conversion Project from Memorial Drive to Route 1 Bridge, Trenton, NJ | 750,000 | 735,000 | | 735,000 | |
NJ | NJ290 | Route 537/State Route 34 Intersection Monmouth, NJ | 250,000 | 245,000 | | 245,000 | |
NJ | NJ291 | Rte 295/42/I-76, Direct Connection, Camden County, NJ | 500,000 | 490,000 | | 490,000 | |
New Jersey | | | | | 7,028,658 | | 7,028,658 |
NM | NM082 | Bridge Replacements, McKinley County, NM | 300,000 | 294,000 | | 294,000 | |
NM | NM083 | Design, engineering, environmental assessment and initial constructions of East Aztec Arterial Route, NM | 600,000 | 588,000 | | 588,000 | |
NM | NM084 | Hobbs East Bypass Project, NM | 600,000 | 588,000 | | 588,000 | |
NM | NM085 | Las Cruces Downtown Revitalization, NM | 1,200,000 | 1,176,000 | | 1,176,000 | |
NM | NM086 | Northwest Loop Access Road, Sandoval County, NM | 975,000 | 955,500 | | 955,500 | |
NM | NM087 | Pinon Hills Boulevard East and Animus River Bridge, NM | 900,000 | 882,000 | | 882,000 | |
NM | NM088 | San Juan County Road 3900, NM | 600,000 | 588,000 | | 588,000 | |
NM | NM089 | San Juan County Road Bridge #567, NM | 500,000 | 490,000 | | 490,000 | |
NM | NM090 | San Juan County Road CR 7500, NM | 300,000 | 294,000 | | 294,000 | |
NM | NM091 | Village Plaza Streets and Drainage, Village of Angel Fire, NM | 120,000 | 117,600 | | 117,600 | |
NM | NM092 | West Lea Street Improvements, Carlsbad, NM | 180,000 | 176,400 | | 176,400 | |
New Mexico | | | | | 6,149,500 | | 6,149,500 |
NY | NY723 | Commack Road Bypass Study, Suffolk County, NY | 500,000 | 490,000 | | 490,000 | |
NY | NY724 | Construction/Enhancement of Motts Lane, Penfield, NY | 100,000 | 98,000 | | 98,000 | |
NY | NY725 | Design & construction of Glen Cove Connector Road, NY | 100,000 | 98,000 | | 98,000 | |
NY | NY726 | Downtown Parking Improvements, Ossining, NY | 175,000 | 171,500 | | 171,500 | |
NY | NY727 | Eastern Hills Corridor, Clarence, NY | 250,000 | 245,000 | | 245,000 | |
NY | NY728 | Environmental Shield, Queens, NY | 750,000 | 735,000 | | 735,000 | |
NY | NY729 | Fruit Belt Redevelopment Plan, Buffalo, NY | 1,600,000 | 1,568,000 | | 1,568,000 | |
NY | NY730 | Grand Avenue Improvements, City of Poughkeepsie, NY | 1,000,000 | 980,000 | | 980,000 | |
NY | NY731 | Highway-Rail Grade Crossing Bypass, Silver Springs, NY | 300,000 | 294,000 | | 294,000 | |
NY | NY732 | Hylan Drive, Henrietta, NY | 850,000 | 833,000 | | 833,000 | |
NY | NY733 | Library Lane-Coles Lane Improvements, Bronx, NY | 1,000,000 | 980,000 | | 980,000 | |
NY | NY734 | Murray Athletic Center, NY | 100,000 | 98,000 | | 98,000 | |
NY | NY735 | North Main Street Corridor Master Plan, Freeport, NY | 200,000 | 196,000 | | 196,000 | |
NY | NY736 | Parking Expansion, Dobbs Ferry, NY | 250,000 | 245,000 | | 245,000 | |
NY | NY737 | Prospect and Gowanus Expressways ITS Deployment, NY | 1,000,000 | 980,000 | | 980,000 | |
NY | NY738 | Reconstruct Route 6, Town of Cortlandt, NY | 2,000,000 | 1,960,000 | | 1,960,000 | |
NY | NY739 | Revitalization and redevelopment of the Hamlet of Brewerton, NY | 780,000 | 764,400 | | 764,400 | |
NY | NY740 | Safety and Traffic Improvements, Ardsley, NY | 150,000 | 147,000 | | 147,000 | |
NY | NY741 | South Bronx Greenway, Hunts Point Landing, NY | 500,000 | 490,000 | | 490,000 | |
NY | NY742 | South Bronx Greenway, Randall's Island Connector, NY | 500,000 | 490,000 | | 490,000 | |
NY | NY743 | Streetscape Improvements, Eastchester, NY | 300,000 | 294,000 | | 294,000 | |
NY | NY744 | Walden Trail Connection, Town of Montgomery, NY | 351,000 | 343,980 | | 343,980 | |
New York | | | | | 12,500,880 | | 12,500,880 |
NC | NC187 | I-540 Western Wake Freeway, NC | 1,000,000 | 980,000 | | 980,000 | |
NC | NC188 | Tenth St. Connector, Greenville, NC | 250,000 | 245,000 | | 245,000 | |
NC | NC189 | U.S. 17 in Craven County, NC | 250,000 | 245,000 | | 245,000 | |
NC | NC190 | U.S. 74 Interchange at NC 211, Brunswick County, NC | 500,000 | 490,000 | | 490,000 | |
NC | NC191 | Walker Street Grade Separation, Town of Cary, NC | 1,000,000 | 980,000 | | 980,000 | |
North Carolina | | | | | 2,940,000 | | 2,940,000 |
OH | OH379 | Chesapeake By-Pass, Lawrence County, OH | 750,000 | 735,000 | | 735,000 | |
OH | OH380 | Diley Road Widening, City of Pickerington, OH | 500,000 | 490,000 | | 490,000 | |
OH | OH381 | East Market Street Widen/Improve Design, Akron, OH | 500,000 | 490,000 | | 490,000 | |
OH | OH382 | Fulton Dr. and Wales Ave. Intersection Improvement, OH | 600,000 | 588,000 | | 588,000 | |
OH | OH383 | Harrison County Road 29, OH | 1,000,000 | 980,000 | | 980,000 | |
OH | OH384 | Holmes County Trail: Phase 5 Holmes County, OH | 750,000 | 735,000 | | 735,000 | |
OH | OH385 | Mahoning Avenue Improvements, Youngstown, OH | 500,000 | 490,000 | | 490,000 | |
OH | OH386 | Quadral Drive extension, Wadsworth, OH | 900,000 | 882,000 | | 882,000 | |
OH | OH387 | Rickenbacker Rail Spur, Pickaway and Franklin Counties, OH | 500,000 | 490,000 | | 490,000 | |
OH | OH388 | State Route 794 Relocation Initiative, OH | 1,000,000 | 980,000 | | 980,000 | |
OH | OH389 | U.S. 20 Southwyck Corridor Improvements, OH | 750,000 | 735,000 | | 735,000 | |
Ohio | | | | | 7,595,000 | | 7,595,000 |
OK | OK147 | Downtown Revitalization Project, Lawton, OK | 250,000 | 245,000 | | 245,000 | |
Oklahoma | | | | | 245,000 | 0 | 245,000 |
OR | OR185 | 19th Street Extension at Deschutes Junction, OR | 500,000 | 490,000 | | 490,000 | |
OR | OR186 | Brewery Grade/Highway 30 Intersection and Flour Mill Property Redevelopment, OR | 670,000 | 656,600 | | 656,600 | |
OR | OR187 | Highway 217, Beaverton-Hillsday Highway to Allen Boulevard, Washington County, OR | 750,000 | 735,000 | | 735,000 | |
Oregon | | | | | 1,881,600 | | 1,881,600 |
PA | PA695 | American Parkway, PA | 2,100,000 | 2,058,000 | | 2,058,000 | |
PA | PA696 | Bridge Over Brandywine Creek, Downingtown, PA | 500,000 | 490,000 | | 490,000 | |
PA | PA697 | Chicora Bridge Safety Improvements, Butler, PA | 250,000 | 245,000 | | 245,000 | |
PA | PA698 | Dillerville Rail Yard Relocation, PA | 1,385,000 | 1,357,300 | | 1,357,300 | |
PA | PA699 | East Carson Street Widening, PA | 1,250,000 | 1,225,000 | | 1,225,000 | |
PA | PA700 | Freedom Crider Road Upgrade, Beaver County, PA | 750,000 | 735,000 | | 735,000 | |
PA | PA701 | I-81 Rebuild/Expansion, PA | 1,400,000 | 1,372,000 | | 1,372,000 | |
PA | PA702 | Martinsburg Borough Streetscape Project, PA | 100,000 | 98,000 | | 98,000 | |
PA | PA703 | Memorial Park Drive in Upper Moreland Township, PA | 300,000 | 294,000 | | 294,000 | |
PA | PA704 | Reading Lighting and Streetscape Enhancement Initiative, PA | 167,500 | 164,150 | | 164,150 | |
PA | PA705 | Regional Telecommunications System on Pennsylvania Turnpike, PA | 500,000 | 490,000 | | 490,000 | |
PA | PA706 | Rehabilitation of the Martin's Mill Covered Bridge, PA | 250,000 | 245,000 | | 245,000 | |
PA | PA707 | Route 60/422 Interchange, Union Township, PA | 750,000 | 735,000 | | 735,000 | |
PA | PA708 | State Route 21 Improvements and Upgrades, Fayette County, PA | 1,500,000 | 1,470,000 | | 1,470,000 | |
PA | PA709 | State Route 21 Intersection at Junction Deli, Green County, PA | 1,090,000 | 1,068,200 | | 1,068,200 | |
PA | PA710 | Stoopville Road Improvements, PA | 500,000 | 490,000 | | 490,000 | |
PA | PA711 | U.S. 422 River Crossing Complex Projects, PA | 750,000 | 735,000 | | 735,000 | |
PA | PA712 | U.S. Route 30/Harrisburg Pike Gateway Interchange Project, PA | 1,400,000 | 1,372,000 | | 1,372,000 | |
PA | PA713 | Upgrade signalized intersections, Allentown, PA | 500,000 | 490,000 | | 490,000 | |
PA | PA714 | Valley View Business Park Access Road, PA | 670,000 | 656,600 | | 656,600 | |
Pennsylvania | | | | | 15,790,250 | | 15,790,250 |
RI | RI087 | RI Bridge and Tunnel Authority EZPass Project for Claiborne Pell Bridge, RI | 500,000 | 490,000 | | 490,000 | |
Rhode Island | | | | | 490,000 | | 490,000 |
SC | SC137 | Greene Street/Williams Street connector, SC | 500,000 | 490,000 | | 490,000 | |
SC | SC138 | Phase 2 road improvements for Tri-County Technical, SC | 300,000 | 294,000 | | 294,000 | |
SC | SC139 | SC 9 Improvements, SC | 500,000 | 490,000 | | 490,000 | |
SC | SC140 | U.S. 278 Corridor, Beaufort County, SC | 500,000 | 490,000 | | 490,000 | |
South Carolina | | | | | 1,764,000 | | 1,764,000 |
SD | SD178 | SD 11 and SD 42 in Sioux Falls, SD | 2,310,000 | 2,263,800 | | 2,263,800 | |
SD | SD179 | South Dakota School of Mines and Technology Connector Road, SD | 390,000 | 382,200 | | 382,200 | |
South Dakota | | | | | 2,646,000 | | 2,646,000 |
TN | TN272 | Interstate 69, TN | 2,100,000 | 2,058,000 | | 2,058,000 | |
TN | TN273 | State Route 218 Extension, Henry County, TN | 750,000 | 735,000 | | 735,000 | |
TN | TN274 | State Route 437 By-Pass in Bedford County, TN | 700,000 | 686,000 | | 686,000 | |
TN | TN275 | Upgrade S.R. 31 in Mooresburg, Hawkins County, TN | 500,000 | 490,000 | | 490,000 | |
Tennessee | | | | | 3,969,000 | | 3,969,000 |
TX | TX421 | Alsbury Boulevard Extension, Burleson, TX | 600,000 | 588,000 | | 588,000 | |
TX | TX422 | Austin Intelligent Transportation Systems, TX | 250,000 | 245,000 | | 245,000 | |
TX | TX423 | Brazos Valley Transportation Management Center, TX | 600,000 | 588,000 | | 588,000 | |
TX | TX424 | Collard Street Reconstruction, Madisonville, TX | 200,000 | 196,000 | | 196,000 | |
TX | TX425 | CR 172 Improvements, Grimes County, TX | 400,000 | 392,000 | | 392,000 | |
TX | TX426 | Dallas Woodall Rodgers Freeway Deck Plaza, TX | 100,000 | 98,000 | | 98,000 | |
TX | TX427 | Del Rio Roadway Construction, Val Verde County, TX | 1,000,000 | 980,000 | | 980,000 | |
TX | TX428 | East Loop, TX | 420,000 | 411,600 | | 411,600 | |
TX | TX429 | East Texas Higher Speed Rail Feasibility Study, TX | 455,000 | 445,900 | | 445,900 | |
TX | TX430 | FM 3503 Relocation Improvements, TX | 500,000 | 490,000 | | 490,000 | |
TX | TX431 | FM509 Extension, TX | 700,000 | 686,000 | | 686,000 | |
TX | TX432 | I-69, US-77 Upgrades from Harlingen to I-37, TX | 525,000 | 514,500 | | 514,500 | |
TX | TX433 | IH30 Interchange at Monty Stratton Pkwy-Greenville, TX | 250,000 | 245,000 | | 245,000 | |
TX | TX434 | Lake Ridge Parkway Extension in Grand Prairie, TX | 500,000 | 490,000 | | 490,000 | |
TX | TX435 | Memorial Drive Feasibility Study, Beverly Hill, TX | 300,000 | 294,000 | | 294,000 | |
TX | TX436 | Northeast Inner Loop intersection Improvements, TX | 350,000 | 343,000 | | 343,000 | |
TX | TX437 | Port of Orange Intermodal Project, Orange, Texas | 500,000 | 490,000 | | 490,000 | |
TX | TX438 | Reconstruction of Long Point Road in Houston, TX | 750,000 | 735,000 | | 735,000 | |
TX | TX439 | SH66 from SH205 to FM 549, Rockwall TX | 250,000 | 245,000 | | 245,000 | |
TX | TX440 | Thomas Road Project, McAllen, TX | 700,000 | 686,000 | | 686,000 | |
TX | TX441 | Trinity River Vision Bridges, Ft Worth, TX | 1,750,000 | 1,715,000 | | 1,715,000 | |
TX | TX442 | U.S. 290/S.H. 36 Improvements, TX | 250,000 | 245,000 | | 245,000 | |
TX | TX443 | White Bluff Intersection Widening Project, White Bluff, TX | 200,000 | 196,000 | | 196,000 | |
TX | TX444 | Widening Loop 281, Longview, TX | 500,000 | 490,000 | | 490,000 | |
Texas | | | | | 11,809,000 | | 11,809,000 |
UT | UT121 | 500 South, I-15 to Redwood Road, UT | 600,000 | 588,000 | | 588,000 | |
UT | UT122 | Geneva RD & Provo Center ST, UT | 250,000 | 245,000 | | 245,000 | |
UT | UT123 | I-15 Auxiliary Lanes, Kaysville to 31st Street, UT | 1,200,000 | 1,176,000 | | 1,176,000 | |
Utah | | | | | 2,009,000 | 0 | 2,009,000 |
VT | VT066 | Chittenden County Road Improvement Projects in Colchester (VT Route 15/Campus Road) and Essex Junction (VT Route 15), VT | 1,675,000 | 1,641,500 | | 1,641,500 | |
VT | VT067 | Streetscape Improvement Project, Bennington, VT | 500,000 | 490,000 | | 490,000 | |
VT | VT068 | Vermont Downtown Streetscape and Sidewalk Improvements in Springfield and Bristol, VT | 670,000 | 656,600 | | 656,600 | |
Vermont | | | | | 2,788,100 | | 2,788,100 |
VA | VA252 | Ft. Lee Access Points, Prince George, VA | 750,000 | 735,000 | | 735,000 | |
VA | VA253 | Streetscape Project--Town of Scottsville, VA | 400,000 | 392,000 | | 392,000 | |
VA | VA254 | US Route 1/SR 123 Interchange Improvements, Prince William County, VA | 2,010,000 | 1,969,800 | | 1,969,800 | |
VA | VA255 | Vienna Sidewalk construction, VA | 100,000 | 98,000 | | 98,000 | |
VA | VA256 | Widen Route 10, Chesterfield, VA | 250,000 | 245,000 | | 245,000 | |
Virginia | | | | | 3,439,800 | | 3,439,800 |
WA | WA286 | A-B Street Corridor Connector, WA | 1,260,000 | 1,234,800 | | 1,234,800 | |
WA | WA287 | Beaudry Road Crossing and Pathway, Yakima Co. WA | 200,000 | 196,000 | | 196,000 | |
WA | WA288 | Big Pasco Industrial Center Intermodal Project, Phase 4, WA | 900,000 | 882,000 | | 882,000 | |
WA | WA289 | City of Granite Falls Freight Access Project, WA | 1,050,000 | 1,029,000 | | 1,029,000 | |
WA | WA290 | Coal Creek Parkway Corridor Completion Project, WA | 700,000 | 686,000 | | 686,000 | |
WA | WA291 | FAST Corridor Grade Separations, WA | 500,000 | 490,000 | | 490,000 | |
WA | WA292 | Hanford Reach National Monument Transportation Improvements, WA | 700,000 | 686,000 | | 686,000 | |
WA | WA293 | Icicle Station Project, Leavenworth, WA | 300,000 | 294,000 | | 294,000 | |
WA | WA294 | Implementing Red Mountain Area Plan, Benton Co. WA | 300,000 | 294,000 | | 294,000 | |
WA | WA295 | Lincoln Avenue Grade Separation Project, WA | 1,050,000 | 1,029,000 | | 1,029,000 | |
WA | WA296 | Post Street Centennial Trail and Utility Bridge, WA | 1,400,000 | 1,372,000 | | 1,372,000 | |
WA | WA297 | South Lake Union Streetcar Project Capital Improvements, WA | 805,000 | 788,900 | | 788,900 | |
WA | WA298 | Tacoma Rail Mountain Division Track Improvements, WA | 770,000 | 754,600 | | 754,600 | |
WA | WA299 | U.S. 2 Safety Improvements, WA | 650,000 | 637,000 | | 637,000 | |
WA | WA300 | U.S. 395, North Spokane Corridor, WA | 500,000 | 490,000 | | 490,000 | |
WA | WA301 | West Vancouver Freight Access Project, WA | 1,400,000 | 1,372,000 | | 1,372,000 | |
Washington | | | | | 12,235,300 | | 12,235,300 |
WV | WV085 | Coalfields Expressway, WV | 4,000,000 | 3,920,000 | | 3,920,000 | |
WV | WV086 | Friends of Cheat Rails-to-Trails program, WV | 300,000 | 294,000 | | 294,000 | |
WV | WV087 | Interstate 68 Access Road--Monongalia County, WV | 2,000,000 | 1,960,000 | | 1,960,000 | |
WV | WV088 | King Coal Highway, WV | 4,000,000 | 3,920,000 | | 3,920,000 | |
WV | WV089 | Paw Paw Bends Trail, Morgan County, WV | 1,000,000 | 980,000 | | 980,000 | |
WV | WV090 | Raleigh Street Extension, WV | 500,000 | 490,000 | | 490,000 | |
WV | WV091 | Route 10 Upgrade from I-64 to Corridor G, WV | 1,000,000 | 980,000 | | 980,000 | |
WV | WV092 | West Virginia Route 2 Improvements, WV | 7,643,100 | 7,490,238 | | 7,490,238 | |
WV | WV093 | West Virginia Route 9, WV | 8,000,000 | 7,840,000 | | 7,840,000 | |
West Virginia | | | | | 27,874,238 | | 27,874,238 |
WI | WI157 | 1/2 Street, Town of Turtle Lake, WI | 350,000 | 343,000 | | 343,000 | |
WI | WI158 | College Avenue Bridge Project, Appleton, WI | 500,000 | 490,000 | | 490,000 | |
WI | WI159 | County Highway C Road Improvements, Bayfield County, WI | 1,750,000 | 1,715,000 | | 1,715,000 | |
WI | WI160 | County Highway F Reconstruction, Douglas County, WI | 1,500,000 | 1,470,000 | | 1,470,000 | |
WI | WI161 | Engineering Project for NFDL Railyard Crossing, WI | 600,000 | 588,000 | | 588,000 | |
WI | WI162 | State Highway 53 Improvements, Barron County, WI | 1,000,000 | 980,000 | | 980,000 | |
WI | WI163 | STH 44--Oshkosh, WI | 400,000 | 392,000 | | 392,000 | |
WI | WI164 | U.S. Highway 10 Improvements between Marshfield and Stevens Point, WI | 2,500,000 | 2,450,000 | | 2,450,000 | |
WI | WI165 | U.S. Highway 41 Construction Project from Oconto, WI, to Peshtigo, WI | 1,000,000 | 980,000 | | 980,000 | |
WI | WI166 | Wisconsin State Highway 57 Expansion from Dyckesville to Sturgeon Bay, WI | 500,000 | 490,000 | | 490,000 | |
Wisconsin | | | | | 9,898,000 | | 9,898,000 |
State Total | | | 331,374,700 | | 324,747,206 | | 324,747,206 |
| | Denali Commission, Alaska for transportation infrastructure projects throughout rural Alaska, AK | 7,500,000 | | | | |
| | Community Transportation Association of America, Nationwide Joblinks | 900,000 | | | | |
Grand Total | | | 339,774,700 | | 324,747,206 | | 324,747,206 |