California
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09CA001 | 2009 | Antonio Parkway Rehabilitation, Rancho Santa Margarita, CA | $95,000 |
| 09CA002 | 2009 | Aten Road and Old County Road 111 Improvements, Imperial County, CA | $712,500 |
| 09CA003 | 2009 | Branham Lane/Monterey Highway Rail Grade Separation, San Jose, CA | $475,000 |
| 09CA004 | 2009 | Central Expressway Auxiliary Lanes, CA | $475,000 |
| 09CA005 | 2009 | City of San Fernando Downtown Revitalization Project, CA | $285,000 |
| 09CA006 | 2009 | Economic Development/Revitalization of the Rosecrans Corridor, CA | $190,000 |
| 09CA007 | 2009 | Encinas Creek/Pacific Coast Highway 101 Bridge Replacement, CA | $237,500 |
| 09CA008 | 2009 | Golden Gate Bridge Moveable Median Barrier, San Francisco, CA | $950,000 |
| 09CA009 | 2009 | Heim Bridge Replacement, Alameda Corridor Transportation Authority, CA | $380,000 |
| 09CA010 | 2009 | Hwy 50/Missouri Flat - Western Placerville Interchange Improvement/Weber Creek Bridge Upgrade, CA | $570,000 |
| 09CA011 | 2009 | International Drive Extension/Folsom South Canal Bridge, CA | $237,500 |
| 09CA012 | 2009 | Lemon Grove Lighting Project, CA | $285,000 |
| 09CA013 | 2009 | Light Rail Corridor Improvements Study, Chula Vista, CA | $237,500 |
| 09CA014 | 2009 | Los Banos Bypass on State Route 152, CA | $950,000 |
| 09CA015 | 2009 | Metro Gold Line Foothill Extension Transit Oriented Development Project, CA | $237,500 |
| 09CA016 | 2009 | Park Street Pedestrian Safety Transportation Improvements, Alameda, CA | $475,000 |
| 09CA017 | 2009 | Shoal Creek Pedestrian Bridge, CA | $570,000 |
| 09CA018 | 2009 | Sidewalk Construction in Ashland and Cherryland, CA | $475,000 |
| 09CA019 | 2009 | SR 23/US 101 Freeway Interchange Project, CA | $427,500 |
| 09CA020 | 2009 | SR-47 Port Access Expressway, CA | $237,500 |
| 09CA021 | 2009 | SR89 Mousehole Improvement Project, Truckee, CA | $380,000 |
| 09CA022 | 2009 | State Route 180 East, CA | $1,330,000 |
| 09CA023 | 2009 | State Route 71 expansion from SR-60 to I-10, Pomona, CA | $475,000 |
| 09CA024 | 2009 | State Routes 52 and 67 Interchange Improvements, CA | $380,000 |
| 09CA025 | 2009 | Sun Valley Lighting Project, CA | $285,000 |
| 09CA026 | 2009 | Traffic Signal Modernization, City of Lakewood, CA | $475,000 |
| 09CA027 | 2009 | Veterans Boulevard Project, Fresno County, CA | $570,000 |
| 09CA028 | 2009 | West Vista Way Widening (from Melrose Drive to the east of Thunder Drive), Vista, CA | $570,000 |
| 09CA029 | 2009 | I-80 Intermodal Corridor Study - Oakland, CA to Utah Stateline, UT | $950,000 |
| 09CA030 | 2009 | Bluff Top Park Improvements, CA | $95,000 |
| Total: (30 Projects) | $14,012,500 |
Florida
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09FL001 | 2009 | Atlantic Greenway Corridor Network, Miami Beach, FL | $570,000 |
| 09FL002 | 2009 | Belleview Bypass and Baseline Road, Marion County, FL | $475,000 |
| 09FL003 | 2009 | Burnt Store Road Evacuation Route Widening Project Preliminary Design and Environmental Study, FL | $380,000 |
| 09FL004 | 2009 | Design and Construction for the Widening of US 331, Walton County, FL | $237,500 |
| 09FL005 | 2009 | Design, Right-of-way, and Construction for the Widening of the Choctawhatchee Bay Bridge, FL | $95,000 |
| 09FL006 | 2009 | Downtown Transit Circulator Streetscapes, Fort Lauderdale, FL | $712,500 |
| 09FL007 | 2009 | Hillsborough County Hillsborough Avenue Beautification Project, FL | $237,500 |
| 09FL008 | 2009 | Interstate 75/Collier Boulevard/SR 84 Interchange Improvements, FL | $570,000 |
| 09FL009 | 2009 | Little Venice Road Improvement Project: Phase II, Marathon, FL | $95,000 |
| 09FL010 | 2009 | Manatee-Sarasota Counties Intelligent Transportation System (ITS) Project, FL | $475,000 |
| 09FL011 | 2009 | Melbourne Airport Access Road and Interchange, Melbourne, FL | $1,003,865 |
| 09FL012 | 2009 | Roadway Improvements to Fairchild Road and Hare Street, FL | $95,000 |
| 09FL013 | 2009 | Sidewalk and Street Milling, Repair and Resurfacing, Sweetwater, FL | $475,000 |
| 09FL014 | 2009 | Sistrunk Boulevard Revitalization and Enhancement Project, FL | $475,000 |
| 09FL015 | 2009 | SR 426/CR 419 Improvements, Orlando, FL | $285,000 |
| 09FL016 | 2009 | SR 46 Regional Evacuation Route, FL | $570,000 |
| 09FL017 | 2009 | State Road (SR) 80 in Hendry County, FL | $475,000 |
| 09FL018 | 2009 | State Road 87 PD and E Expansion, FL | $475,000 |
| 09FL019 | 2009 | Street Rehabilitation, Hialeah, FL | $570,000 |
| 09FL020 | 2009 | U.S. 17 Widening, FL | $1,900,000 |
| 09FL021 | 2009 | US 17 Bridge Construction in the Hardee City Line/CR 634 Segment, Hardee Cnty, FL | $332,500 |
| 09FL022 | 2009 | US Hwy 19 Storm water Mitigation Project at Southfork near Homosassa, Citrus Cnty, FL | $380,000 |
| Total: (22 Projects) | $10,883,865 |
Georgia
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09GA001 | 2009 | Butner Road/Stonewall Tell Intersection, GA | $475,000 |
| 09GA002 | 2009 | Cumberland Parkway/US 41 Expansion, GA | $950,000 |
| 09GA003 | 2009 | Newton County Rails to Trails By-Pass Tunnel, GA | $142,500 |
| 09GA004 | 2009 | Newton County Rails to Trails Right of Way Purchase, GA | $622,250 |
| 09GA005 | 2009 | Newton County Rails to Trails Yellow River Bridges, GA | $232,750 |
| 09GA006 | 2009 | Ocmulgee River Corridor, GA | $95,000 |
| 09GA007 | 2009 | Relocation and Widening of SR 113 (from Old Alabama Rd to SR 61South of Cartersville), GA | $190,000 |
| Total: (7 Projects) | $2,707,500 |
Illinois
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09IL001 | 2009 | Busse Woods Trail and IL Route 72 Bicycle Overpass, Elk Grove Village, IL | $475,000 |
| 09IL002 | 2009 | Calhoun County Highway 1 Resurfacing, IL | $475,000 |
| 09IL003 | 2009 | Design, Engineering, Land Acquisition and Planning for the Cross-town Connector Project at US 76, Godfrey, IL | $237,500 |
| 09IL004 | 2009 | Design, Engineering, Land Acquisition and Planning for the Extension of Rt. 162 from Maryville towards Troy, IL | |
| 09IL004 | 2009 | Design, Engineering, Land Acquisition and Planning for the Extension of Rt. 162 from Maryville towards Troy, IL | $95,000 |
| 09IL005 | 2009 | TREC Trails and Pedestrian Bridges | |
| 09IL005 | 2009 | General Dacey Trail Phase VI | |
| 09IL005 | 2009 | Riverfront Trail Phase 2 | |
| 09IL005a | 2009 | Burnham Greenway Gap | $234,000 |
| 09IL005f | 2009 | Rock Island Corridor Trail Project, Chicago land | $46,800 |
| 09IL006 | 2009 | Improving the West Bank River Front, IL | $475,000 |
| 09IL007 | 2009 | Intersection Safety Improvements, Olympia Fields, IL | $475,000 |
| 09IL007 | 2009 | Governors Highway & 207th Street/Scott Drive Intersection Improvement | $444,600 |
| 09IL008 | 2009 | Meacham Road Toll-way Access Ramps, Schaumburg, IL | $475,000 |
| 09IL009 | 2009 | Miller Road Widening, McHenry, IL | $475,000 |
| 09IL010 | 2009 | Milwaukee Avenue Revitalization Program, IL | $475,000 |
| 09IL011 | 2009 | Mt. Erie-Golden Gate Rd Resurfacing and Expansion, Wayne County, IL | $190,000 |
| 09IL012 | 2009 | Reconstruction of Roosevelt Road, Village of Broadview, IL | $570,000 |
| 09IL013 | 2009 | Route 120 Corridor, Lake County, IL | $950,000 |
| 09IL014 | 2009 | University of Illinois at Urbana-Champaign Campus Street Extension, IL | $570,000 |
| 09IL015 | 2009 | US Highway 30 Improvements, Whiteside County, IL | $475,000 |
| 09IL016 | 2009 | Widening of Rakow Road, McHenry County, IL | $570,000 |
| Total: (18 Projects) | $7,707,900 |
Indiana
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09IN001 | 2009 | 7th Road Extension, Marshall County, IN | $665,000 |
| 09IN002 | 2009 | B-Line Trail Phase II, IN | $950,000 |
| 09IN003 | 2009 | Campus Perimeter Transit System, Vanderburgh County, IN | $522,500 |
| 09IN004 | 2009 | Downtown Transportation Improvements, City of Indianapolis, IN | $475,000 |
| 09IN005 | 2009 | Interchange Planning and Design at I-65/County Road and 750 North, Johnson County, IN | $237,500 |
| 09IN006 | 2009 | McKinley/Riverside Avenues Safety Improvement Project, Muncie, IN | $950,000 |
| 09IN007 | 2009 | Park Avenue and Markland Avenue Intersection Improvement Project, Kokomo, IN | $1,235,000 |
| 09IN008 | 2009 | Ronald Reagan Parkway (Middle and Southern segments), Boone County, IN | $570,000 |
| 09IN009 | 2009 | University Parkway, Vanderburgh County, IN | $760,000 |
| Total: (9 Projects) | $6,365,000 |
Iowa
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09IA001 | 2009 | 19th Avenue North Extension Project, Clinton, IA | $475,000 |
| 09IA002 | 2009 | 24thSt/23rd Ave Corridor Improvement, Council Bluffs, IA | $237,500 |
| 09IA003 | 2009 | 4-Laning of US 20 from the Sac-Calhoun County, Iowa line to Moville, IA | $570,000 |
| 09IA004 | 2009 | Delaware Avenue Bridge, IA | $475,000 |
| 09IA005 | 2009 | Mississippi Drive Corridor, Muscatine, IA | $475,000 |
| 09IA006 | 2009 | U.S. 61 Fort Madison Bypass Interchange at Highway J40, IA | $950,000 |
| 09IA007 | 2009 | US 34 Bridge, Mills County, IA | $427,500 |
| 09IA008 | 2009 | Whiterock Sustainable Trail, Guthrie County, IA | $380,000 |
| Total: (8 Projects) | $3,990,000 |
Louisiana
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09LA001 | 2009 | Alemedia Road (LA 50) Intersection Improvements, St. Charles Parish, LA | $285,000 |
| 09LA002 | 2009 | Baton Rouge Riverfront Redevelopment Transportation Improvements, LA | $950,000 |
| 09LA003 | 2009 | Clearview Parkway at Earhart Expressway Transportation and Drainage Upgrades, Jefferson Parish, LA | $356,250 |
| 09LA004 | 2009 | I-10 New Orleans East Upgrades, LA | $190,000 |
| 09LA005 | 2009 | I-10 Pecue Lane Interchange, Baton Rouge, LA | $475,000 |
| 09LA006 | 2009 | I-10 Southwest Frontage Road Design and Construction (between LA 433 and US 190B), LA | $175,750 |
| 09LA007 | 2009 | I-12 Interchange at LA 1088, St. Tammany Parish, LA | $237,500 |
| 09LA008 | 2009 | I-12 Interchange at LA-16, Denham Springs, LA | $950,000 |
| 09LA009 | 2009 | I-49 South, LA | $1,900,000 |
| 09LA010 | 2009 | I-69, Shreveport, LA | $1,900,000 |
| 09LA011 | 2009 | LA-1 Goldenmeadow to Port Fourchon, LA | $1,021,250 |
| 09LA012 | 2009 | Red Town Road/U.S. 171 Intersection Realignment, Leesville (Vernon Parish), LA | $570,000 |
| 09LA013 | 2009 | US 190 (US 11 to LA 433) Widening, Slidell, LA | $237,500 |
| Total: (13 Projects) | $9,248,250 |
Maryland
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09MD001 | 2009 | Construction of a Full-Grade Separated Urban Diamond Interchange at US 15 and Christopher's Crossing/Monocacy Blvd, MD | $285,000 |
| 09MD002 | 2009 | Eastern Boulevard Widening and Grade Separation (from MD Rt. 64 to Antietam Drive), MD | $380,000 |
| 09MD003 | 2009 | Hagerstown Area Northeast By-Pass Project, MD | $95,000 |
| 09MD004 | 2009 | Maryland Scenic Byways, MD | $118,750 |
| 09MD005 | 2009 | Midtown Cultural District Streetscape, Baltimore, MD | $475,000 |
| 09MD006 | 2009 | US 113 Safety and Traffic Improvements, Worcester County, MD | $237,500 |
| Total: (6 Projects) | $1,591,250 |
Michigan
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09MI001 | 2009 | 4-Laning of Baldwin Road to the I-75 Interchange, Oakland County, MI | $237,500 |
| 09MI002 | 2009 | Access Ramps and Widening of Latson Road, Livingston County, MI | $570,000 |
| 09MI003 | 2009 | Buena Vista Township, Michigan-Town Center Infrastructure and Streetscape, MI | $237,500 |
| 09MI004 | 2009 | Construction of a Bicycle Path Between Lexington and Port Sanilac, Sanilac County, MI | $475,000 |
| 09MI005 | 2009 | Croix Street, City of Negaunee, MI | $570,000 |
| 09MI006 | 2009 | Expansion of Southfield Road, Southfield, MI | $522,500 |
| Total: (6 Projects) | $2,612,500 |
Mississippi
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09MS001 | 2009 | Barnes Crossing Road/Natchez Trace Parkway Bridge, MS | $475,000 |
| 09MS002 | 2009 | Capitol Street Renaissance Project, MS | $2,850,000 |
| 09MS003 | 2009 | Dentville - Jack Road Project, Copiah County, MS | $475,000 |
| 09MS004 | 2009 | East Metropolitan Corridor, Rankin County, MS | $237,500 |
| 09MS005 | 2009 | Hattiesburg 4th Street Improvements, MS | $1,900,000 |
| 09MS006 | 2009 | I-20/59 Interchange, Lauderdale County, MS | $570,000 |
| 09MS007 | 2009 | Town of Sherman Roadway and Traffic Improvements, MS | $950,000 |
| 09MS008 | 2009 | Urban Collector Project, MS | $475,000 |
| 09MS009 | 2009 | Urban Collector Road along I-10 North, MS | $1,900,000 |
| 09MS010 | 2009 | US Hwy 49/82 Mississippi Hwy 7 Connector Road Project, Greenwood, MS | $380,000 |
| Total: (10 Projects) | $10,212,500 |
Missouri
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09MO001 | 2009 | Brush Creek at Troost Improvements, MO | $475,000 |
| 09MO002 | 2009 | City of Ashland Main Street Redevelopment Project, MO | $475,000 |
| 09MO003 | 2009 | COLT Railroad Overpass at U.S. 63, Columbia, MO | $475,000 |
| 09MO004 | 2009 | Construction of Lafayette Interchange, MO | $950,000 |
| 09MO005 | 2009 | Extension of MO-740 to the I-70/Lake of the Woods Interchange, Columbia, MO | $237,500 |
| 09MO006 | 2009 | Maintenance of the Washington Bridge (Rt. 47 Bridge) over the Missouri River, Washington, MO | $285,000 |
| 09MO007 | 2009 | Mexico Technology Park, MO | $950,000 |
| 09MO008 | 2009 | Preliminary Design and Environmental Study for US 63 Improvements (Osage, Maries, and Phelps Counties), MO | $332,500 |
| 09MO009 | 2009 | River Des Peres Boulevard Improvements, St. Louis, MO | $237,500 |
| 09MO010 | 2009 | Route 32 Safety Improvements in Cedar County, MO | $475,000 |
| 09MO011 | 2009 | Route 61 Corridor Study and Engineering, Lincoln and St. Charles Counties, MO | $190,000 |
| 09MO012 | 2009 | State Route 13 from Route 24 to County Road 113, Lafayette County, MO | $475,000 |
| 09MO013 | 2009 | Tucker Boulevard Bridge, MO | $332,500 |
| 09MO014 | 2009 | U.S. 61 Bypass, Hannibal, MO | $237,500 |
| 09MO015 | 2009 | Upgrade and Partly Relocate MO Rt 141, St Louis County, MO | $237,500 |
| Total: (15 Projects) | $6,365,000 |
New Jersey
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09NJ001 | 2009 | Bellmawr Borough/Route 42 Culvert Replacement Project, NJ | $285,000 |
| 09NJ002 | 2009 | College Avenue Bus Shelter Redesign | |
| 09NJ002 | 2009 | College Avenue Redesign, New Brunswick, NJ | $950,000 |
| 09NJ003 | 2009 | Egg Harbor City Transit Hub, NJ | $237,500 |
| 09NJ004 | 2009 | Extension of the Lawrence-Hopewell Trail, Pennington, NJ | $285,000 |
| 09NJ005 | 2009 | Finnegans Lane, North Brunswick Township, NJ | $332,500 |
| 09NJ006 | 2009 | Hudson River Waterfront Walkway, NJ | $475,000 |
| 09NJ007 | 2009 | I-295/76/42 Direct Connection, NJ | $2,850,000 |
| 09NJ008 | 2009 | Kapkowski Road Transportation Planning Area/North Avenue Corridor, NJ | $380,000 |
| 09NJ009 | 2009 | Signalization Improvements, Elizabeth, NJ | $475,000 |
| Total: (9 Projects) | $6,270,000 |
New Mexico
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09NM001 | 2009 | City of Hobbs, East Bypass, NM | $95,000 |
| 09NM002 | 2009 | East Aztec Arterial Route, NM | $308,750 |
| 09NM003 | 2009 | Main Street Improvements and Downtown Revitalization, Las Cruces, NM | $522,500 |
| 09NM004 | 2009 | Northwest Loop Access Road, Sandoval County, NM | $617,500 |
| 09NM005 | 2009 | Pinon Hills Boulevard East and Animas River Bridge, NM | $895,375 |
| 09NM006 | 2009 | Sunport Extension to Broadway Blvd, Albuquerque, NM | $95,000 |
| Total: (6 Projects) | $2,534,125 |
New York
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09NY001 | 2009 | BNMC Infrastructure Improvements Program, Buffalo, NY | $237,500 |
| 09NY002 | 2009 | Conversion of Outboard Detour Roadway to a Bikeway, Esplanade, NY | $475,000 |
| 09NY003 | 2009 | Design, Engineering, and Construction of the Glen Cove Connector Road, Glen Cove, NY | $570,000 |
| 09NY004 | 2009 | Downtown Revitalization, Village of Melverne, NY | $380,000 |
| 09NY005 | 2009 | Green County Route 9W/81 Intersection Rehabilitation and Traffic Reduction Project, NY | $712,500 |
| 09NY006 | 2009 | High Line Project, New York, NY | $237,500 |
| 09NY007 | 2009 | I-278 Environmental Shield, NY | $475,000 |
| 09NY008 | 2009 | Main Street Multimodal Access and Revitalization Project, NY | $950,000 |
| 09NY009 | 2009 | Murray Athletic Center at Elmira College Access Road Improvements, Chemung County, NY | $570,000 |
| 09NY010 | 2009 | Nellie Hill Bridge Replacement, Dover, NY | $237,500 |
| 09NY011 | 2009 | Revitalization and Development of the General Business District, Inc. Village of Cedarhurst, NY | $142,500 |
| 09NY012 | 2009 | Route 6 Improvements, Peekskill, NY | $665,000 |
| 09NY013 | 2009 | Safe Routes for Seniors and Kids Programs, NY | $712,500 |
| 09NY014 | 2009 | Traffic Signal Modernization, Utica, NY | $475,000 |
| Total: (14 Projects) | $6,840,000 |
North Carolina
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09NC001 | 2009 | Garden Parkway, Gaston County, NC | $380,000 |
| 09NC002 | 2009 | High Point Greenways Project, High Point, NC | $95,000 |
| 09NC003 | 2009 | Universal Street Railroad Overpass Project, NC | $950,000 |
| 09NC004 | 2009 | US 74 Monroe Bypass, Mecklenburg and Union Counties, NC | $237,500 |
| 09NC005 | 2009 | US-401 Widening in Cumberland, Harnett, and Wake Counties, NC | $237,500 |
| 09NC006 | 2009 | Widen SR 1306 and SR 1363 (Mebane Street) from SR 1158 to NC 54, Burlington, NC | $427,500 |
| Total: (6 Projects) | $2,327,500 |
Ohio
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09OH001 | 2009 | 11th Street Revitalization Project, Canton, OH | $380,000 |
| 09OH002 | 2009 | Central Riverfront Street Grid: Mehring Way Relocation, Cincinnati, OH | $475,000 |
| 09OH003 | 2009 | Chesapeake By-Pass, OH | $475,000 |
| 09OH004 | 2009 | Detroit Avenue Public Right-of-Way Improvements, OH | $332,500 |
| 09OH005 | 2009 | Eastgate Area Improvements, Clermont County, OH | $570,000 |
| 09OH006 | 2009 | Martha Ave/I-76 Connector, Akron, OH | $1,187,500 |
| 09OH007 | 2009 | Massillon Road Bridge Improvement, Summit County, OH | $475,000 |
| 09OH008 | 2009 | Pedestrian/Bicycle Recreation Trail Over the Tuscarwaras River Along the Ohio and Erie Canalway Recreation Trails, Stark Cnty, OH | $475,000 |
| 09OH009 | 2009 | Street Widening, Grandview Heights, OH | $237,500 |
| 09OH010 | 2009 | Upgrade of Alum Creek Drive at I-270 and at Groveport Road, Franklin County, OH | $570,000 |
| 09OH011 | 2009 | Warren, OH Greenway Bike Trail, OH | $332,500 |
| 09OH012 | 2009 | Widening of Route 50 , Ross County, OH | $475,000 |
| 09OH013 | 2009 | Zanesville State Street Bridge Renovation and Repair Project, OH | $475,000 |
| Total: (13 Projects) | $6,460,000 |
Oklahoma
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09OK001 | 2009 | Extend Falcon Road from Park Lane to Veterans Drive, Altus, OK | $427,500 |
| 09OK002 | 2009 | Reconstruction and Replacement of the I-244 Bridge over the Arkansas River, Tulsa, OK | $380,000 |
| 09OK003 | 2009 | Reconstruction of the I-44 Bridge Over 163rd Street (Including the Interchange), Tulsa, OK | $570,000 |
| 09OK004 | 2009 | Salt Fork of the Red River Bridge Martha Crossing, OK | $1,425,000 |
| 09OK005 | 2009 | SW 9th Avenue Widening--Main St. to US69/75, Durant, OK | $380,000 |
| 09OK006 | 2009 | Traffic Light - Piedmont Road and Edmond Road, OK | $95,000 |
| Total: (6 Projects) | $3,277,500 |
Pennsylvania
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09PA001 | 2009 | Avenue of the Arts Revitalization and Streetscaping Project, PA | $475,000 |
| 09PA002 | 2009 | Bethlehem Pike Roadway and Streetscape Improvements, Springfield Township, PA | $475,000 |
| 09PA003 | 2009 | Bridge over Brandywine Creek, PA | $712,500 |
| 09PA004 | 2009 | Construction of Bridge Over Valley Creek for Loop Trail at Valley Forge Park, King of Prussia, PA | $142,500 |
| 09PA005 | 2009 | Grove Road Bridge Replacement, Castle Shannon, PA | $570,000 |
| 09PA006 | 2009 | Main Street Streetscape Improvements Project, Boyertown, PA | $475,000 |
| 09PA007 | 2009 | Old Allentown Streetscape Improvements, PA | $475,000 |
| 09PA008 | 2009 | PA 924 and Interstate 81 Interchange Improvements, PA | $950,000 |
| 09PA009 | 2009 | Parking and Street Enhancements at Historic Yellow Springs, Chester Springs, PA | $142,500 |
| 09PA010 | 2009 | Pedestrian and School Children Safety Project, PA | $190,000 |
| 09PA011 | 2009 | Pennsylvania High-Speed Maglev Development Program, PA | $950,000 |
| 09PA012 | 2009 | Perry Square Streetscaping, Erie, PA | $380,000 |
| 09PA013 | 2009 | Prophecy Creek Park Entrance Project, PA | $237,500 |
| 09PA014 | 2009 | Route 8, Duncan Avenue to Wildwood Road, PA | $950,000 |
| 09PA015 | 2009 | Thorn Run Road Interchange Upgrade, Moon Township, PA | $95,000 |
| 09PA016 | 2009 | US 422 River Crossing Complex Project, King of Prussia, PA | $237,500 |
| 09PA017 | 2009 | Veteran's Memorial Bridge, Fallston Bridge, PA | $475,000 |
| Total: (17 Projects) | $7,932,500 |
South Carolina
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09SC001 | 2009 | Environmental Impact Statement for Southern Evacuation Lifeline (SELL)/US 701 Project, Georgetown and Horry Counties, SC | $237,500 |
| 09SC002 | 2009 | I-95/U.S. Highway 301 Interchange Project, Orangeburg County, SC | $95,000 |
| 09SC003 | 2009 | Roadway Improvements for the Clemson University Advanced Materials Center, Anderson County, SC | $285,000 |
| 09SC004 | 2009 | Salters Road Expansion Along I-85, Greenville, SC | $95,000 |
| 09SC005 | 2009 | SC 9 Interchange Improvements, Spartanburg, SC | $285,000 |
| 09SC006 | 2009 | SC Hwy 98 and SC Hwy 160 Connector, SC | $712,500 |
| 09SC007 | 2009 | Widen US 17 in Charleston County from the Isle of Palms Connector to a point at or near Darrell Creek Trail, Mt. Pleasant, SC | $380,000 |
| 09SC008 | 2009 | Widening of US Hwy 221 Between Hunter/Fleming-Smith Industrial City of the City of Laurens, Laurens, SC | $285,000 |
| Total: (8 Projects) | $2,375,000 |
Texas
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09TX001 | 2009 | 4-Laning of Texas SH 24 (from I-30 to the Oklahoma State Line), Paris, TX | $95,000 |
| 09TX002 | 2009 | Big Creek Mitigation Plan for Highway 36, TX | $475,000 |
| 09TX003 | 2009 | Feasibility Study, Sullivan City, TX | $95,000 |
| 09TX004 | 2009 | Galveston Seawall, TX | $95,000 |
| 09TX005 | 2009 | IH 30 at SH 34 and Monty Stratton Parkway Initiative, TX | $570,000 |
| 09TX006 | 2009 | Mile 1 from Bus 83 to Mile 8, Hidalgo County, TX | $665,000 |
| 09TX007 | 2009 | NETEX Rail Rehabilitation Initiative, TX | $95,000 |
| 09TX008 | 2009 | Reconstruction and Widening of SH-349, Martin and Dawson Counties, TX | $475,000 |
| 09TX009 | 2009 | Relocation of Intersection FM 359 and Mason Road, TX | $475,000 |
| 09TX010 | 2009 | Road Construction, Hidalgo County, TX | $522,500 |
| 09TX011 | 2009 | Robstown Trade Processing and Inland Center, Robstown, TX | $237,500 |
| 09TX012 | 2009 | SH 171 and FM 2231 Traffic Signal, TX | $118,750 |
| 09TX013 | 2009 | NETEX Rail Rehabilitation Initiative, TX | $95,000 |
| Total: (13 Projects) | $4,013,750 |
Virginia
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09VA002 | 2009 | Extension of the Riverwalk Trail, City of Danville, VA | $95,000 |
| 09VA003 | 2009 | Gilmerton Bridge Replacement, VA | $237,500 |
| 09VA004 | 2009 | Hwy 29 at Elizabeth Street Interchange Construction, Danville, VA | $95,000 |
| 09VA005 | 2009 | I-295/Meadowville Road Interchange, VA | $475,000 |
| 09VA006 | 2009 | Multi-use Recreational Trail at High Bridge State Park in Prince Edward County, VA | $237,500 |
| 09VA007 | 2009 | Preliminary Engineering for the Interstate 95/ US Route 17 Interchange Project, Spotsylvania County, VA | $95,000 |
| 09VA008 | 2009 | US 17/Dominion Blvd Widening (Cedar Rd to Great Bridge Blvd) and Drawbridge Replacement (over Atlantic Intercoastal Waterway), Chesapeake, VA | $237,500 |
| 09VA009 | 2009 | Vienna Sidewalk Construction, Vienna, VA | $237,500 |
| Total: (8 Projects) | $1,710,000 |
Washington
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09WA001 | 2009 | A-B Street Corridor Connector Project, WA | $1,900,000 |
| 09WA002 | 2009 | Aurora Corridor Improvements - Phase 2, WA | $475,000 |
| 09WA003 | 2009 | Downtown Waterfront Redevelopment Access Project in Vancouver, WA | $237,500 |
| 09WA004 | 2009 | North Parkway Safety Improvement Project, WA | $475,000 |
| 09WA005 | 2009 | Puyallup Shaw Road Extension Project, Puyallup, WA | $237,500 |
| 09WA006 | 2009 | U.S. 101 Safety Improvements at Deer Park, WA | $931,000 |
| 09WA007 | 2009 | U.S. 12 Safety Improvements, WA | $2,850,000 |
| 09WA008 | 2009 | University Place Pedestrian Overpass, WA | $475,000 |
| 09WA009 | 2009 | Woodland Trail Project, WA | $475,000 |
| Total: (9 Projects) | $8,056,000 |
West Virginia
| Project Number |
Fiscal Year |
Project Description |
Designated Amount |
| 09WV001 | 2009 | Elkins Railyard Project, WV | $950,000 |
| 09WV002 | 2009 | Kanawha Trestle Rail-Trail Project, WV | $1,900,000 |
| 09WV003 | 2009 | Potomac Street Improvement, WV | $1,425,000 |
| 09WV004 | 2009 | Raleigh County Airport, WV | $1,045,000 |
| 09WV005 | 2009 | Slide Repair Work along US 60 in Eastern Kanawha County, WV | $4,750,000 |
| 09WV006 | 2009 | Tabler Station Business Park: Utilities, Transportation and Technology Infrastructure, WV | $332,500 |
| 09WV007 | 2009 | West Virginia Route 10, WV | $4,750,000 |
| 09WV008 | 2009 | West Virginia Route 9, WV | $6,650,000 |
| Total: (8 Projects) | $21,802,500 |