Alabama
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 99AL01 | 1999 | Gainesville Metropolitan region | $150,000 |
| E0AL01 | 2000 | Statewide: Dock Inventory Assessment | $348,400 |
| E0AL02 | 2000 | Florence: Pedestrian and other Transit Improvements | $871,000 |
| E1AL01 | 2001 | Mobile: GM&O Intermodal Center/Amtrak Station | $609,332 |
| E2AL01 | 2002 | Auburn University Dynamic Rollover Laboratory Project | $1,486,961 |
| E2AL02 | 2002 | Cullman County Covered Pedestrian Walkway | $99,131 |
| E2AL03 | 2002 | Eastern Shore Trail Project from USS Alabama to Weeks Bay National Reserve | $1,486,961 |
| E2AL04 | 2002 | Fairhope Multi-Modal Trails | $991,307 |
| E2AL06 | 2002 | The City of Hanceville Downtown Revitalization | $396,523 |
| E2AL08 | 2002 | Mobile Greenways | $1,734,788 |
| E2AL09 | 2002 | Mobile Waterfront Terminal Complex | $4,956,536 |
| E2AL10 | 2002 | Prattville Daniel Pratt Historic District Development | $495,654 |
| E2AL11 | 2002 | Tuscaloosa Riverwalk & Parkway Development | $991,307 |
| E2AL12 | 2002 | University of Alabama Injury Control Research Center | $1,239,134 |
| E2AL13 | 2002 | University of Alabama Transportation Research Institute | $6,939,150 |
| E2AL14 | 2002 | US-98 Highway Lighting | $1,982,615 |
| TC03(001) | 2003 | Five Point Improvement Project | $400,000 |
| TC03(002) | 2003 | Mobile Grade Separation at Intersection of Hamilton Boulevard and CSXT Rail Line Near U.S. 90 | $500,000 |
| TC03(003) | 2003 | Greeno Road Pilot Program | $1,000,000 |
| TC03(004) | 2003 | Downtown Revitalization Project, City of Haleyville | $600,000 |
| TC03(005) | 2003 | Jasper Downtown Revitalization Project | $400,000 |
| TC03(006) | 2003 | Commanders Dr. Relocation and Bay Front Rd. Rehabilitation | $1,000,000 |
| TC03(007) | 2003 | Highway-79 Corridor/Greenway Project | $500,000 |
| TC03(008) | 2003 | Ruffner Mountain Facilities Improvement | $500,000 |
| TC03(009) | 2003 | Riverfront Development | $500,000 |
| TC03(009) | 2003 | Ft. Mitchell Project-Land Mark Site On The Old Federal Road | $1,000,000 |
| 04AL001 | 2004 | Connection of the Alabama Chief Ladiga Trail and the Georgia Silver Comet Trail | $94,042 |
| 04AL002 | 2004 | Highway 79 Corridor/Greenway Project | $705,314 |
| 04AL003 | 2004 | Marion County Alabama Safety, Efficiency, and Trade Highway Improvement Program | $752,335 |
| 04AL004 | 2004 | Town of Clayton Downtown Revitalization, Clayton | $470,209 |
| 05AL001 | 2005 | American Village Citizenship Trust-Transportation Access and Improvement | $848,160 |
| 05AL002 | 2005 | Clayton Core Area Revitalization and Enhancement Program | $212,040 |
| 05AL003 | 2005 | Coosa River Boardwalk | $678,528 |
| 05AL004 | 2005 | Luverne Downtown Revitalization | $424,080 |
| 05AL005 | 2005 | Orange Beach Pedestrian Safety and Lighting Enhancements | $212,040 |
| 05AL006 | 2005 | Bevill State Sidewalk & Lighting Improvements | $339,264 |
| 05AL007 | 2005 | NWR - Wildlife Drive | $212,040 |
| 06AL001 | 2006 | City of Guin Industrial Commercial Park | $129,195 |
| 06AL002 | 2006 | National Guard Armory Road | $318,681 |
| 06AL003 | 2006 | Widening of 20th Street and 20th Avenue | $861,300 |
| 08AL001 | 2008 | Brannon Stand Bridge, AL | $225,645 |
| 08AL002 | 2008 | Red Mountain Park Project, Birmingham, AL | $902,580 |
| 09AL001 | 2009 | Highway 55 Hurricane Evacuation Corridor Study, AL | $533,520 |
| 09AL002 | 2009 | Medical Campus Access Road (from Highway 231 to Wolf Creek Road), Pell City, AL | $444,600 |
| 10AL001 | 2010 | El Camino East/West Corridor, AL | $1,414,828 |
| 10Al002 | 2010 | Main Street Improvements, Springville, AL | $471,609 |
| 10AL003 | 2010 | Pedestrian Safety Project, Russellville, AL | $282,965 |
| 11AL001 | 2011 | North Railroad Avenue Project | $260,880 |
| 12AL001 | 2012 | Samson Main Street Sidewalk Improvements | $187,854 |
| Total: (49 Projects) | $42,160,508 |
California
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 99CA13 | 1999 | Escalon: State Route 120, Miller and Escalon Avenues | $150,000 |
| 99CA45 | 1999 | Mono County, Lee-Vining: US-395, Main Street | $182,000 |
| 99CA64 | 1999 | San Francisco, Mission Street corridor | $177,000 |
| 00CA03 | 2000 | Berkley: Ed Roberts Campus | $300,000 |
| 00CA29 | 2000 | San Joaquin Valley: Creating Transportation Options Through Improved Land Use Patterns | $230,059 |
| 00CA46 | 2000 | San Diego: Pilot Test of Transferable Regional / Local PLACE3S Method & Analytical Tool for CA and National Uses | $180,000 |
| E0CA01 | 2000 | Riverside County: CETAP Program | $435,500 |
| E0CA02 | 2000 | San Francisco: Civic Center Project | $936,325 |
| E1CA01 | 2001 | City of Coronado: Mobility Improvements | $562,460 |
| E1CA02 | 2001 | Sierra Madre: Chantry Flats Road | $562,460 |
| E1CA03 | 2001 | Community and Environmental Transportation Acceptability Process | $937,433 |
| E1CA04 | 2001 | El Segundo: Intermodal Facility Improvements | $937,433 |
| E1CA05 | 2001 | County of Santa Barbara: Elwood Bicycle/Pedestrian Bridge | $234,358 |
| E1CA06 | 2001 | Roseville: Historic District Revitalization Project | $468,717 |
| E2CA01 | 2002 | Artesia Boulevard Improvements | $198,261 |
| E2CA02 | 2002 | Completion of US 101 Regional Bikeway System - Agoura Road Bikeway System | $495,654 |
| E2CA03 | 2002 | BART Fruitvale Station | $1,982,615 |
| E2CA04 | 2002 | Green Airport Initiative | $1,982,615 |
| E2CA05 | 2002 | Lewis Avenue Bridge | $198,261 |
| E2CA06 | 2002 | Los Angeles County Bike Path | $991,307 |
| E2CA07 | 2002 | Los Angeles South LaBrea Avenue and Imperial Highway Improvements | $991,307 |
| E2CA08 | 2002 | Maine Avenue Redesign and Downtown/Civic Center Master Planning Project | $99,131 |
| E2CA09 | 2002 | Ortega Street Pedestrian Over-Crossing Gateway | $123,913 |
| E2CA10 | 2002 | Pasadena Rose Bowl Access Mitigation | $297,392 |
| E2CA11 | 2002 | Redlands Transportation & Community Preservation | $495,654 |
| E2CA12 | 2002 | San Francisco Marin Parklands Visitor Access Improvements | $991,307 |
| E2CA13 | 2002 | Santa Carita Cross Valley Connector | $991,307 |
| E2CA14 | 2002 | SR-25 Safety Improvements | $1,982,615 |
| E2CA15 | 2002 | SR-91 Freeway Corridor Transportation Enhancement | $495,654 |
| E2CA16 | 2002 | Stockton Miracle Mile/Pacific Avenue Resurfacing | $991,307 |
| E2CA17 | 2002 | Tulare County Farm-to-Market Roads | $2,478,268 |
| E2CA18 | 2002 | Walerga Road Bridge Replacement Over Dry Creek | $991,307 |
| TC03(001) | 2003 | Orange County Congestion Program | $1,000,000 |
| TC03(002) | 2003 | Virginia Corridor Greenway Pilot Project | $400,000 |
| TC03(003) | 2003 | Intermodal Urban Transit Village | $1,000,000 |
| TC03(004) | 2003 | San Gabriel Valley/LA/Pasadena Metrolink Gold Line Construction Authority | $2,900,000 |
| TC03(005) | 2003 | San Luis Obispo City to Sea Bike Path | $500,000 |
| TC03(006) | 2003 | Tower Bridge Pedestrian Bikeway Improvements | $900,000 |
| TC03(007) | 2003 | Caltrain Tracking Information System | $250,000 |
| 04CA001 | 2004 | Route 152 Safety Improvements, Santa Clara County | $235,104 |
| 05CA001 | 2005 | Shandon Pedestrian Bridge | $212,040 |
| 05CA002 | 2005 | Pedestrian Safety improvements | $212,040 |
| 05CA003 | 2005 | State Route 52 East from SR125 to SR67 | $848,160 |
| 06CA001 | 2006 | Grand Avenue Traffic Improvements | $258,390 |
| 06CA002 | 2006 | Lemon Grove Lighting Project | $258,390 |
| 06CA003 | 2006 | North Broadway Streetscape Project | $86,130 |
| 06CA004 | 2006 | Pedestrian Walkway Project | $861,300 |
| 06CA005 | 2006 | Santa Monica Boulevard/Westem Intersection Safety Project | $133,502 |
| 06CA006 | 2006 | Walnut Grove Ave Traffic Light | $73,211 |
| 07CA001 | 2007 | Downtown Parking Pricing (On-Street and Off-Street) | $10,000,000 |
| 08CA001 | 2008 | Central Expressway Auxiliary Lanes, Santa Clara County, CA | $451,284 |
| 08CA002 | 2008 | Citracado Parkway Project, CA | $226,135 |
| 08CA003 | 2008 | Fairfield Ranch Road, Chino Hills, CA | $225,645 |
| 08CA004 | 2008 | Friant Road Widening, CA | $1,056,019 |
| 08CA005 | 2008 | Highway 118 Corridor Study, CA | $226,135 |
| 08CA006 | 2008 | La Canada Flintridge, CA I-210 Soundwall, CA | $226,135 |
| 08CA007 | 2008 | Reyes Adobe Road/U.S. 101 Interchange Reconstruction, Agoura Hills, CA | $225,645 |
| 08CA008 | 2008 | School Zone Safety Improvements, Chula Vista, CA | $452,270 |
| 08CA009 | 2008 | State Route 198 Expressway Widening, Kings County, CA | $541,548 |
| 09CA001 | 2009 | Antonio Parkway Rehabilitation, Rancho Santa Margarita, CA | $88,920 |
| 09CA002 | 2009 | Aten Road and Old County Road 111 Improvements, Imperial County, CA | $666,900 |
| 09CA003 | 2009 | Branham Lane/Monterey Highway Rail Grade Separation, San Jose, CA | $444,600 |
| 09CA004 | 2009 | Central Expressway Auxiliary Lanes, CA | $444,600 |
| 09CA005 | 2009 | City of San Fernando Downtown Revitalization Project, CA | $266,760 |
| 09CA006 | 2009 | Economic Development/Revitalization of the Rosecrans Corridor, CA | $177,840 |
| 09CA008 | 2009 | Golden Gate Bridge Moveable Median Barrier, San Francisco, CA | $889,200 |
| 09CA009 | 2009 | Heim Bridge Replacement, Alameda Corridor Transportation Authority, CA | $355,680 |
| 09CA010 | 2009 | Hwy 50/Missouri Flat - Western Placerville Interchange Improvement/Weber Creek Bridge Upgrade, CA | $533,520 |
| 09CA011 | 2009 | International Drive Extension/Folsom South Canal Bridge, CA | $222,300 |
| 09CA012 | 2009 | Lemon Grove Lighting Project, CA | $266,760 |
| 09CA013 | 2009 | Light Rail Corridor Improvements Study, Chula Vista, CA | $222,300 |
| 09CA014 | 2009 | Los Banos Bypass on State Route 152, CA | $889,200 |
| 09CA015 | 2009 | Metro Gold Line Foothill Extension Transit Oriented Development Project, CA | $222,300 |
| 09CA016 | 2009 | Park Street Pedestrian Safety Transportation Improvements, Alameda, CA | $444,600 |
| 09CA017 | 2009 | Shoal Creek Pedestrian Bridge, CA | $533,520 |
| 09CA018 | 2009 | Sidewalk Construction in Ashland and Cherryland, CA | $444,600 |
| 09CA019 | 2009 | SR 23/US 101 Freeway Interchange Project, CA | $400,140 |
| 09CA020 | 2009 | SR-47 Port Access Expressway, CA | $222,300 |
| 09CA021 | 2009 | SR89 Mousehole Improvement Project, Truckee, CA | $355,680 |
| 09CA022 | 2009 | State Route 180 East, CA | $1,244,880 |
| 09CA023 | 2009 | State Route 71 expansion from SR-60 to I-10, Pomona, CA | $444,600 |
| 09CA024 | 2009 | State Routes 52 and 67 Interchange Improvements, CA | $355,680 |
| 09CA025 | 2009 | Sun Valley Lighting Project, CA | $266,760 |
| 09CA026 | 2009 | Traffic Signal Modernization, City of Lakewood, CA | $444,600 |
| 09CA027 | 2009 | Veterans Boulevard Project, Fresno County, CA | $533,520 |
| 09CA028 | 2009 | West Vista Way Widening (from Melrose Drive to the east of Thunder Drive), Vista, CA | $533,520 |
| 09CA030 | 2009 | Bluff Top Park Improvements, CA | $88,920 |
| 10CA001 | 2010 | Autumn Street Parkway, San Jose, CA | $918,694 |
| 10CA002 | 2010 | Bristol Street Widening, Sant Ana, CA | $330,126 |
| 10CA003 | 2010 | California State Route 119 Widening Project, CA | $377,287 |
| 10CA004 | 2010 | Echo Park/Sunset Boulevard Streetscape Beautification, CA | $565,931 |
| 10CA005 | 2010 | El Dorado and Bromwich Sidewalk Improvements, CA | $518,770 |
| 10CA006 | 2010 | I-5 Santa Clarita-Los Angeles Gateway Improvement Project, CA | $707,413 |
| 10CA007 | 2010 | Nordahl Bridge Widening at SR-78, San Marcos , CA | $471,609 |
| 10CA008 | 2010 | Park Street Pedestrian Safety Transportation Improvements, Alameda, CA | $282,965 |
| 10CA009 | 2010 | Rice Avenue Interchange at U.S. Highway 101, Ventura County, CA | $660,253 |
| 10CA010 | 2010 | Rutherford Cross Road Roundabout, CA | $565,931 |
| 10CA011 | 2010 | Sfgo, San Francisco, CA | $240,521 |
| 10CA012 | 2010 | Sidewalk Construction in Ashland, Cherryland Castro Valley Communities in Alameda County, CA | $565,931 |
| 10CA013 | 2010 | State Route 71 expansion from SR-60 to I-10, Pomona, CA | $282,965 |
| 10CA014 | 2010 | State Route 99 Interchange Improvement Project, CA | $471,609 |
| D10CA015 | 2010 | Green Valley at North Shingle Road | $333,062 |
| 11CA003 | 2011 | Transforming El Camino Real from Highway to Complete Street, San Mateo County | $365,232 |
| 11CA032 | 2011 | Intermodal Access Improvements at Henry Mayo Newhall Memorial Center Employment Hub in Santa Clarita | $130,440 |
| 11CA037 | 2011 | Anaheim, CA: Santa Ana River Trail Project | $652,200 |
| 11CA059 | 2011 | Palomar Station Pedestrian Bridge, San Marcos | $782,640 |
| 11CA087 | 2011 | Napa Valley Vine Trail - Solano Avenue Segment | $2,500,000 |
| 11CA096 | 2011 | Pacific Avenue Median Improvements | $391,320 |
| 11CA097 | 2011 | University Miracle Mile Median Improvements | $261,107 |
| 12CA014 | 2012 | I-580 and State Route 84 Community Based Transit Oriented Development Plan | $286,000 |
| 12CA029 | 2012 | US 101 Smith River Regional Mobility Study | $280,000 |
| 12CA068 | 2012 | Fulton Mall and Mariposa Mall Street Reconstruction | $1,000,000 |
| 12CA069 | 2012 | Vallejo Downtown Streetscape
Phase 3 | $1,150,000 |
| Total: (113 Projects) | $73,926,909 |
Florida
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 00FL03 | 2000 | Hillsborough County: Coordinated Linear Infrastructure Projects / CLIPS | $120,000 |
| 00FL12 | 2000 | Martin & St Lucie Counties: Alternative Land Use Assessment | $150,000 |
| 00FL16 | 2000 | St. Lucie County: Teenagers, Transportation Planners and Residents Team Together to Tackle the Treasure Coast Transportation Plan | $117,000 |
| E1FL01 | 2001 | Miami: NW 7th Avenue Corridor Improvement Project | $93,743 |
| E2FL01 | 2002 | Gulf Coast Pedestrian Walkover, Highway 98 | $991,307 |
| E2FL02 | 2002 | HART Bus Tracking | $991,307 |
| E2FL03 | 2002 | Jacksonville Main Street Streetscaping | $495,654 |
| E2FL04 | 2002 | Miami-Dade Multi-Modal Passenger Activity Center | $3,469,575 |
| E2FL05 | 2002 | Riviera Beach Route 710 Connector Improvements and Traffic Calming | $297,392 |
| E2FL06 | 2002 | SR-46 Project Development and Environment Study | $1,189,569 |
| E2FL07 | 2002 | University of South Florida, University of Central Florida I-4 Corridor Project | $1,734,788 |
| E2FL08 | 2002 | US 17-92/Horatio Avenue Intersection Traffic Mitigation | $991,307 |
| E2FL09 | 2002 | Gladsen Widening of County Roads 159, 269, 379 | $743,480 |
| E2FL10 | 2002 | Ybor City Streetcar Intermodal Station | $1,982,615 |
| TC03(001) | 2003 | Bicycle Pedestrian Master Plan - Implementation | $600,000 |
| TC03(002) | 2003 | Traffic Calming and Pedestrian Landscape Improvements | $500,000 |
| TC03(003) | 2003 | Pennsylvania/Lake Sue/Winter Park Road Corridor Enhancement | $500,000 |
| TC03(004) | 2003 | Multilaning US-319 Wakulla County | $150,000 |
| TC03(005) | 2003 | US 441/State Road 7 Corridor Planning Initiative | $1,000,000 |
| 04FL001 | 2004 | Central Avenue Parking Facility and Pedestrian Improvements | $94,042 |
| 04FL002 | 2004 | Central Avenue Parking Facility and Pedestrian Improvements | $376,167 |
| 05FL001 | 2005 | Miami Performing Arts Center Pedestrian Plaza and Traffic Calming | $212,040 |
| 06FL001 | 2006 | Flagler Drive Improvement Project | $1,291,950 |
| 06FL002 | 2006 | Tampa Bay Regional Transportation Vision and Planning for Six County Metro Area | $86,130 |
| 08FL001 | 2008 | Construction of Riverside Multi-use Trailways, Parkland, FL | $226,135 |
| 08FL002 | 2008 | Downtown Transit Circulator Streetscapes, Broward County, FL | $225,645 |
| 08FL003 | 2008 | Expansion of County Line Road--Hernando County FL | $452,270 |
| 08FL004 | 2008 | Heckscher Drive and Bridge Replacement, FL | $902,580 |
| 08FL005 | 2008 | U.S. 441/SR7 Interchange at 11th Street, Lauderhill, Broward County, FL | $678,405 |
| 08FL006 | 2008 | US 98 Six Lane Widening, FL | $678,405 |
| 09FL001 | 2009 | Atlantic Greenway Corridor Network, Miami Beach, FL | $533,520 |
| 09FL002 | 2009 | Belleview Bypass and Baseline Road, Marion County, FL | $444,600 |
| 09FL003 | 2009 | Burnt Store Road Evacuation Route Widening Project Preliminary Design and Environmental Study, FL | $355,680 |
| 09FL004 | 2009 | Design and Construction for the Widening of US 331, Walton County, FL | $222,300 |
| 09FL005 | 2009 | Design, Right-of-way, and Construction for the Widening of the Choctawhatchee Bay Bridge, FL | $88,920 |
| 09FL006 | 2009 | Downtown Transit Circulator Streetscapes, Fort Lauderdale, FL | $666,900 |
| 09FL007 | 2009 | Hillsborough County Hillsborough Avenue Beautification Project, FL | $222,300 |
| 09FL008 | 2009 | Interstate 75/Collier Boulevard/SR 84 Interchange Improvements, FL | $533,520 |
| 09FL009 | 2009 | Little Venice Road Improvement Project: Phase II, Marathon, FL | $88,920 |
| 09FL010 | 2009 | Manatee-Sarasota Counties Intelligent Transportation System (ITS) Project, FL | $444,600 |
| 09FL011 | 2009 | Melbourne Airport Access Road and Interchange, Melbourne, FL | $939,618 |
| 09FL012 | 2009 | Roadway Improvements to Fairchild Road and Hare Street, FL | $88,920 |
| 09FL013 | 2009 | Sidewalk and Street Milling, Repair and Resurfacing, Sweetwater, FL | $444,600 |
| 09FL014 | 2009 | Sistrunk Boulevard Revitalization and Enhancement Project, FL | $444,600 |
| 09FL015 | 2009 | SR 426/CR 419 Improvements, Orlando, FL | $266,760 |
| 09FL016 | 2009 | SR 46 Regional Evacuation Route, FL | $533,520 |
| 09FL017 | 2009 | State Road (SR) 80 in Hendry County, FL | $444,600 |
| 09FL018 | 2009 | State Road 87 PD and E Expansion, FL | $444,600 |
| 09FL019 | 2009 | Street Rehabilitation, Hialeah, FL | $533,520 |
| 09FL020 | 2009 | U.S. 17 Widening, FL | $1,778,400 |
| 09FL021 | 2009 | US 17 Bridge Construction in the Hardee City Line/CR 634 Segment, Hardee Cnty, FL | $311,220 |
| 09FL022 | 2009 | US Hwy 19 Storm water Mitigation Project at Southfork near Homosassa, Citrus Cnty, FL | $355,680 |
| 10FL001 | 2010 | Access Road to Melbourne International Airport, FL | $734,955 |
| 10FL002 | 2010 | Beckett Bascule Bridge Replacement-Pinellas Country, FL | $282,965 |
| 10Fl003 | 2010 | Belleview Bypass and Baseline Road, Marion County, FL | $471,609 |
| 10FL004 | 2010 | Intelligent Transportation System (ITS), Bradenton and Sarasota, FL | $471,609 |
| 10FL005 | 2010 | Interstate 75/Collier Boulevard/SR 84 Interchange Improvement, FL | $754,574 |
| 10FL006 | 2010 | PJ Adams Road Improvement, FL | $235,804 |
| 10FL007 | 2010 | State Road (SR) 80, FL | $754,574 |
| 10FL008 | 2010 | U.S. 98 Improvements, FL | $471,609 |
| D10FL009 | 2010 | Tampa Riverwalk, Borien Street Underpass | $125,000 |
| D10FL010 | 2010 | Pedestrain Safety Improvements | $85,000 |
| 11FL010 | 2011 | Sarasota County Advanced Traffic Management System (ATMS) | $2,608,800 |
| 11FL015 | 2011 | Tamiami Canal Historic Swing Bridge | $978,300 |
| 12FL001 | 2012 | Hillsborough Community College Leroy Ave. Entrance Improvements | $602,354 |
| 12FL009 | 2012 | Broward County School Zone Pedestrian Safety and Preservation Program | $600,000 |
| 12FL010 | 2012 | Tampa Riverwalk Segment 13 | $217,750 |
| 12FL051 | 2012 | Education Corridor Pompano Beach Transit Related Improvements and Transit Systems Study | $968,948 |
| Total: (68 Projects) | $41,892,655 |
Georgia
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 00GA01 | 2000 | Athens to Atlanta: Livable Communities Planning Model Multimodal Transportation Corridor | $168,549 |
| E2GA01 | 2002 | Atlanta Peachtree Corridor Project Phase I | $5,947,843 |
| E2GA02 | 2002 | Macon Community Preservation and Redevelopment (Cherry Street Plaza) | $198,261 |
| 04GA001 | 2004 | Riverfront Battle Property Trail | $235,105 |
| 04GA002 | 2004 | Streetscape Initiative Phase II Northwest Moultrie | $470,209 |
| 05GA001 | 2005 | Paulding Business and Technology Park | $848,160 |
| 05GA002 | 2005 | Paulding County Business and Technology Park Roadway Improvement | $848,160 |
| 06GA001 | 2006 | Columbus Train Depot* | $215,325 |
| 06GA002 | 2006 | Pedestrian Tunnel and Trail* | $456,489 |
| 06GA003 | 2006 | SR-154 Memorial Drive, Construct Sidewalks* | $430,650 |
| 06GA004 | 2006 | Columbus Rail Yards Relocation Study | $215,327 |
| 08GA001 | 2008 | Downtown Development Authority District Streetscape, Dahlonega GA | $293,976 |
| 08GA002 | 2008 | Extension of the Cobb Parkway, Marietta, GA | $429,657 |
| 08GA003 | 2008 | I-75/Bruton Smith Pkwy Interchange Improvement, GA | $226,135 |
| 08GA004 | 2008 | New interchange & road relocation, I-85 & CR 98, GA | $225,645 |
| 08GA005 | 2008 | Ocmulgee Heritage Trail, Bibb County, GA | $361,816 |
| 08GA006 | 2008 | Rails to Trails/Civic Center Project, Covington, GA | $452,270 |
| 08GA007 | 2008 | Silver Comet Trail Atlanta Road Connector, GA | $226,135 |
| 08GA008 | 2008 | State Route 24 Widening, Sandersville, Washington County, GA | $452,270 |
| 08GA009 | 2008 | State Route 67 Widening from I-16 to Statesboro bypass, GA | $452,270 |
| 08GA010 | 2008 | Union Grove Interchange, Gordon County, GA | $226,135 |
| 09GA001 | 2009 | Butner Road/Stonewall Tell Intersection, GA | $444,600 |
| 09GA002 | 2009 | Cumberland Parkway/US 41 Expansion, GA | $889,200 |
| 09GA003 | 2009 | Newton County Rails to Trails By-Pass Tunnel, GA | $133,380 |
| 09GA004 | 2009 | Newton County Rails to Trails Right of Way Purchase, GA | $582,426 |
| 09GA005 | 2009 | Newton County Rails to Trails Yellow River Bridges, GA | $217,854 |
| 09GA006 | 2009 | Ocmulgee River Corridor, GA | $88,920 |
| 09GA007 | 2009 | Relocation and Widening of SR 113 (from Old Alabama Rd to SR 61South of Cartersville), GA | $177,840 |
| 10GA001 | 2010 | Downtown Development Authority Streetscape, Dahlonega, CA | $369,741 |
| 10GA002 | 2010 | RiverwalkTrail-Mile Branch River Park, Hawkinsville, GA | $84,890 |
| 10GA003 | 2010 | State Road 133 From Albany to Moultrie, GA | $754,574 |
| 10GA004 | 2010 | US 41/Cobb Parkway Expansion and Bridge Replacemnt, GA | $471,609 |
| 11GA003 | 2011 | Atlanta Beltline City Hall East Bike and Pedestrian Bridge | $782,640 |
| 12GA001 | 2012 | Southwest Georgia Rural Information, Coordination, and Asset Preservation | $479,102 |
| Total: (34 Projects) | $18,857,163 |
Illinois
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 00IL11 | 2000 | McHenry County: A Sustainable Transportation and Land Use Plan for the Route 47 Kishwaukee River Corridor Developed with a Watershed-based Approach through Community Consensus | $198,500 |
| E0IL01 | 2000 | DuPage County: Transportation Alternatives Study | $653,250 |
| E1IL01 | 2001 | Quincy: 18th Street Bridge Project | $281,230 |
| E1IL02 | 2001 | Chicago: Walkable Edgewater Initiative | $93,743 |
| E1IL03 | 2001 | Heritage Corridor Project Study | $187,487 |
| E2IL01 | 2002 | Improvements to Bandyville Road | $520,436 |
| E2IL02 | 2002 | Broadway Armory Parking Facility | $743,480 |
| E2IL03 | 2002 | East Branch DuPage River Greenway Trail Plan | $74,348 |
| E2IL04 | 2002 | Galesburg Railroad Relocation Study | $148,696 |
| E2IL05 | 2002 | City of Havana Infrastructure Maintenance | $1,486,961 |
| E2IL06 | 2002 | Museum Campus Trolleys Expanded Service | $495,654 |
| E2IL07 | 2002 | Robbins Commuter Rail Station Upgrade | $247,827 |
| E2IL08 | 2002 | South Com Regional Dispatch Center | $168,522 |
| E2IL09 | 2002 | Stearns Road Corridor Multi-Use Trails | $991,307 |
| E2IL10 | 2002 | US-51 Widening | $1,486,961 |
| E2IL11 | 2002 | I-74 Mississippi River Bridge | $1,982,615 |
| TC03(001) | 2003 | Lansing Greenway Project | $100,000 |
| TC03(002) | 2003 | Southeast Service Project | $100,000 |
| TC03(003) | 2003 | Blind Man's Y Project | $200,000 |
| TC03(004) | 2003 | Museum Campus Chicago Trolleys | $500,000 |
| TC03(005) | 2003 | Dempster Steet Commercial Corridor Reconstruction | $1,000,000 |
| 04IL001 | 2004 | Homewood Illinois Railroad Station/Platform Acquisition and Improvement | $188,084 |
| 04IL002 | 2004 | Village of Glencoe Illinois Green Bay Trail--North Branch Trail Connection | $188,084 |
| 06IL001 | 2006 | Intersection Improvements Near Piano Extension Center | $650,282 |
| 06IL002 | 2006 | Park Forest Street Lighting | $215,325 |
| 06IL003 | 2006 | U.S. Route 150 Entrance Galesburg Logistics | $344,520 |
| 08IL001 | 2008 | Butterfield Road, Illinois Route 60/Canadian National Railroad Grade Separation, Lake County, IL | $226,135 |
| 08IL002 | 2008 | Illinois Route 120 Corridor, Lake County, IL | $904,540 |
| 08IL003 | 2008 | Illinois Trails, IL - Great River Trail Near Savanna | $252,722 |
| 08IL003 | 2008 | Illinois Trails, IL - Harrisburg to Eldorado Bike Trail | $261,748 |
| 08IL003 | 2008 | Illinois Trails, IL - General Dacey Trail-Phase II | $261,748 |
| 08IL003 | 2008 | Illinois Trails, IL - SIU-Edwardsvile Morris Bike Trail | $252,722 |
| 08IL003 | 2008 | Illinois Trails, IL - Village of Manteno Greenways Trail System | $315,903 |
| 08IL003 | 2008 | Illinois Trails, IL - Urbana to Danville Trail | $252,722 |
| 08IL003 | 2008 | Illinois Trails, IL - Springfield Bike Trail | $315,903 |
| 08IL003 | 2008 | Illinois Trails, IL - Cal-Sag Greenway Bike Trail | $261,748 |
| 08IL003 | 2008 | Illinois Trails, IL - Grand Illinois Trail, Village of Carbon Cliff | $261,748 |
| 08IL003 | 2008 | Illinois Trails, IL - Aurora Bike Trail | $270,774 |
| 08IL004 | 2008 | Meacham Road Tollway Access Ramp, Schaumburg, IL | $226,135 |
| 08IL005 | 2008 | Miller Road Widening, McHenry County, IL | $226,135 |
| 08IL006 | 2008 | Red Gate Road Bridge, St. Charles, IL | $452,270 |
| 08IL007 | 2008 | Street Improvements in Burnham, IL | $361,032 |
| 08IL008 | 2008 | Street Improvements in Thornton, IL | $361,032 |
| 09IL001 | 2009 | Busse Woods Trail and IL Route 72 Bicycle Overpass, Elk Grove Village, IL | $444,600 |
| 09IL002 | 2009 | Calhoun County Highway 1 Resurfacing, IL | $444,600 |
| 09IL003 | 2009 | Design, Engineering, Land Acquisition and Planning for the Cross-town Connector Project at US 76, Godfrey, IL | $222,300 |
| 09IL004 | 2009 | Design, Engineering, Land Acquisition and Planning for the Extension of Rt. 162 from Maryville towards Troy, IL | $88,920 |
| 09IL005 | 2009 | Riverfront Trail Phase 2 | $439,920 |
| 09IL005 | 2009 | TREC Trails and Pedestrian Bridges | $327,600 |
| 09IL005 | 2009 | General Dacey Trail Phase VI | $224,640 |
| 09IL005a | 2009 | Burnham Greenway Gap | $234,000 |
| 09IL005f | 2009 | Rock Island Corridor Trail Project, Chicago land | $46,800 |
| 09IL007 | 2009 | Governors Highway & 207th Street/Scott Drive Intersection Improvement | $444,600 |
| 09IL008 | 2009 | Meacham Road Toll-way Access Ramps, Schaumburg, IL | $444,600 |
| 09IL009 | 2009 | Miller Road Widening, McHenry, IL | $444,600 |
| 09IL010 | 2009 | Milwaukee Avenue Revitalization Program, IL | $444,600 |
| 09IL011 | 2009 | Mt. Erie-Golden Gate Rd Resurfacing and Expansion, Wayne County, IL | $177,840 |
| 09IL012 | 2009 | Reconstruction of Roosevelt Road, Village of Broadview, IL | $533,520 |
| 09IL013 | 2009 | Route 120 Corridor, Lake County, IL | $889,200 |
| 09IL014 | 2009 | University of Illinois at Urbana-Champaign Campus Street Extension, IL | $533,520 |
| 09IL016 | 2009 | Widening of Rakow Road, McHenry County, IL | $533,520 |
| 10IL001 | 2010 | City of Urbana Goodwin Street Expansion, IL | $707,413 |
| 10IL002 | 2010 | Harrisburg Missouri Street Hospital Access Project , IL | $377,287 |
| 10IL003 | 2010 | Montrose Avenue Repaving--Harlem to Confield, IL | $330,126 |
| 10IL004 | 2010 | Rakow Road widening in McHenry County, IL | $707,413 |
| D10IL005 | 2010 | Fairview Drive Bikepath | $168,000 |
| 11IL003 | 2011 | Oak Forest Station Facility Redevelopment | $1,304,400 |
| 11IL025 | 2011 | North Main Street Reconstruction | $163,050 |
| 11IL036 | 2011 | State Street Resurfacing/Reconstruction Project | $260,880 |
| 11IL040 | 2011 | Veterans Memorial Trail - Phase II Engineering | $652,200 |
| 12IL031 | 2012 | Oak Park Marion South Transit Gateway Project | $1,127,240 |
| 12IL045 | 2012 | South Main Street Reconstruction | $300,000 |
| Total: (72 Projects) | $31,729,718 |
Indiana
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 00IN02 | 2000 | Madison County: I-69 Corridor Preservation Initiative - Livable Communities & Edge Growth | $500,000 |
| E0IN01 | 2000 | Muncie: Community Connectors | $217,750 |
| E1IN01 | 2001 | City of Angola and Steuben City: Bike Path | $304,666 |
| E1IN02 | 2001 | West Baden Springs: Preservation Project | $937,433 |
| E2IN01 | 2002 | Central Business District Trail Link Prairie Duneland and Iron Horse Heritage | $961,568 |
| E2IN02 | 2002 | East Chicago Railroad Avenue Project | $991,307 |
| E2IN03 | 2002 | McKinley/ Riverside Avenue Safety Improvements | $1,234,178 |
| E2IN04 | 2002 | Road 200 South Improvement Project | $693,915 |
| TC03(001) | 2003 | Industrial Park South Bend Studebaker Corridor | $500,000 |
| 05IN001 | 2005 | INAAP Re-use Authority Project | $848,160 |
| 07IN001 | 2007 | I-70 Truck Lane Study | $3,000,000 |
| 08IN001 | 2008 | Campus Perimeter Transportation, Vanderburgh, IN | $316,589 |
| 08IN002 | 2008 | Connersville Intermodal Study, Connersville, IN | $316,589 |
| 08IN003 | 2008 | Pigeon Creek Greenway Passage: Phase I, Evansville, IN | $604,729 |
| 08IN004 | 2008 | University Parkway Construction, Vanderburgh County, IN | $315,903 |
| 09IN001 | 2009 | 7th Road Extension, Marshall County, IN | $622,440 |
| 09IN002 | 2009 | B-Line Trail Phase II, IN | $889,200 |
| 09IN003 | 2009 | Campus Perimeter Transit System, Vanderburgh County, IN | $489,060 |
| 09IN004 | 2009 | Downtown Transportation Improvements, City of Indianapolis, IN | $444,600 |
| 09IN005 | 2009 | Interchange Planning and Design at I-65/County Road and 750 North, Johnson County, IN | $222,300 |
| 09IN006 | 2009 | McKinley/Riverside Avenues Safety Improvement Project, Muncie, IN | $889,200 |
| 09IN007 | 2009 | Park Avenue and Markland Avenue Intersection Improvement Project, Kokomo, IN | $1,155,960 |
| 09IN008 | 2009 | Ronald Reagan Parkway (Middle and Southern segments), Boone County, IN | $533,520 |
| 09IN009 | 2009 | University Parkway, Vanderburgh County, IN | $711,360 |
| 10IN001 | 2010 | 6th Street Grade Separation, Vincennes, IN | $660,253 |
| 10IN002 | 2010 | Dunes Kankakee Trail, Porter County, IN | $471,609 |
| 10IN003 | 2010 | Prairie Street Grade Separation, Elkhart, IN | $660,253 |
| 10IN004 | 2010 | Riggin Road at the Walnut Street Intersection, IN | $943,218 |
| 11IN001 | 2011 | I-94/US 421 Economic Development Area Infrastructure Investment | $1,304,400 |
| 11IN002 | 2011 | Prairie Street Grade Separation | $1,956,601 |
| 12IN001 | 2012 | Sherman Minton Bridge Rehabilitation | $3,466,250 |
| 12IN004 | 2012 | Indianapolis Smart Growth Redevelopment District Community Preservation | $74,880 |
| Total: (32 Projects) | $27,237,891 |
Iowa
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 00IA02 | 2000 | Hoeven Valley: Transportation Systems and Community Sustainability Initiative | $175,000 |
| E2IA01 | 2002 | Cedar Rapids Edgewood Road Project | $2,973,922 |
| TC03(001) | 2003 | 19th Avenue North Extension/Reconstruction | $750,000 |
| 08IA001 | 2008 | Construct Four Lane Highway 20 West of U.S. 71, IA | $452,270 |
| 08IA002 | 2008 | Scott Community College Campus Access Road, Davenport, IA | $452,270 |
| 08IA003 | 2008 | Southeast Connector Extension from SE 6th Street to SE 14th Street, IA | $2,116,550 |
| 08IA004 | 2008 | University Boulevard Widening, Clive, IA | $315,903 |
| 08IA005 | 2008 | US Highway 63 Reconstruction, Waterloo, IA | $316,589 |
| 09IA001 | 2009 | 19th Avenue North Extension Project, Clinton, IA | $444,600 |
| 09IA002 | 2009 | 24thSt/23rd Ave Corridor Improvement, Council Bluffs, IA | $222,300 |
| 09IA003 | 2009 | 4-Laning of US 20 from the Sac-Calhoun County, Iowa line to Moville, IA | $533,520 |
| 09IA004 | 2009 | Delaware Avenue Bridge, IA | $444,600 |
| 09IA005 | 2009 | Mississippi Drive Corridor, Muscatine, IA | $444,600 |
| 09IA006 | 2009 | U.S. 61 Fort Madison Bypass Interchange at Highway J40, IA | $889,200 |
| 09IA007 | 2009 | US 34 Bridge, Mills County, IA | $400,140 |
| 09IA008 | 2009 | Whiterock Sustainable Trail, Guthrie County, IA | $355,680 |
| 10IA001 | 2010 | Iowa Highway 100 Extension and Improvements, Cedar Rapids, IA | $471,609 |
| 11IA008 | 2011 | Loras College Parkway | $489,150 |
| 12IA009 | 2012 | Improving Access, Enhancing Lives | $600,000 |
| Total: (19 Projects) | $12,847,903 |
Kentucky
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 99KY01 | 1999 | Lexington, Bluegrass Region | $435,000 |
| 00KY01 | 2000 | Southern Versailles: Community and Transportation System Plan | $85,000 |
| E1KY01 | 2001 | Lake Cumberland Trail: Pedestrian Improvements | $93,743 |
| E1KY02 | 2001 | Bowling Green: Riverfront Development Transportation Enhancements | $937,433 |
| E1KY03 | 2001 | Clay/Leslie County | $1,874,866 |
| E1KY04 | 2001 | Owensboro Riverfront Development Project | $281,230 |
| E2KY01 | 2002 | Estill County Bypass Lighting Around Irvine | $49,565 |
| E2KY02 | 2002 | Estill County Access Road to Industrial Park off Irvine Bypass | $297,392 |
| E2KY03 | 2002 | Fegenbush Lane Bridge at Fern Creek | $396,523 |
| E2KY04 | 2002 | Henderson Riverfront Project Phase II | $991,307 |
| E2KY05 | 2002 | Highway 61 From KY-487 to Columbia PE/Design | $991,307 |
| E2KY06 | 2002 | Johnsontown Road | $793,046 |
| E2KY07 | 2002 | US 421 (Leestown Road) Widening | $495,654 |
| E2KY08 | 2002 | Louisville Waterfront/River Rd Pedestrian Islands Improvement and Park Entry Preston St. Project | $991,307 |
| E2KY09 | 2002 | Median on US-42 from Harrods Creek to River Road | $594,784 |
| E2KY10 | 2002 | Owensboro Riverfront Redevelopment Project | $1,784,353 |
| E2KY11 | 2002 | Park City Sidewalk Reconstruction | $42,230 |
| E2KY12 | 2002 | Somerset Downtown Revitalization | $1,982,615 |
| E2KY13 | 2002 | Somerset Southern Bypass Around the Southwestern Portion | $6,542,627 |
| E2KY14 | 2002 | Statewide Regional Trail Improvements | $2,329,572 |
| E2KY15 | 2002 | Vine Grove Sidewalk Construction | $123,913 |
| TC03(001) | 2003 | KY 115 @KY 911 Intersection Reconstruction | $750,000 |
| TC03(002) | 2003 | Owensboro Waterfront Development Project | $750,000 |
| TC03(003) | 2003 | Resurfacing and Some Reconstruction of Stone Coal Road | $400,000 |
| TC03(004) | 2003 | Pennyrile Parkway Improvements | $800,000 |
| TC03(005) | 2003 | Johnsontown Road Project | $1,000,000 |
| TC03(006) | 2003 | Kentucky Trimodal Transpark Access Road | $1,700,000 |
| TC03(007) | 2003 | Louisville Waterfront/Frankfort Avenue Historical Entryway | $530,000 |
| TC03(008) | 2003 | Morgan, Menifee, Rowan County (MMRC) Regional Business Park Access Road | $250,000 |
| TC03(009) | 2003 | Pine Mountain Industrial Park Access Road | $1,500,000 |
| TC03(010) | 2003 | Somerset Pedestrian Overpass | $1,200,000 |
| TC03(011) | 2003 | Somerset Downtown Revitalization | $1,800,000 |
| TC03(012) | 2003 | Bowling Green Riverfront Project | $4,500,000 |
| 04KY001 | 2004 | Downtown Revitalization Project, Somerset | $1,645,733 |
| 04KY002 | 2004 | Henderson County Port Authority Project | $940,419 |
| 04KY003 | 2004 | Owensboro Waterfront Development Project | $1,880,837 |
| 06KY001 | 2006 | Construction on Watterson Trail and Plantside Drive | $602,910 |
| 06KY002 | 2006 | Honeybranch Industrial Park Road | $344,520 |
| 06KY003 | 2006 | Olmsted Parks Historic Bridges | $172,260 |
| 06KY004 | 2006 | Extension of River Road | $430,650 |
| 08KY001 | 2008 | Fort Knox Park & Ride Express on US 31W, KY | $315,903 |
| 08KY002 | 2008 | Kentucky River Palisades Land Preservation, Lexington, KY | $452,270 |
| 09KY001 | 2009 | Boone County Gunpowder Creek Trail System, KY | $400,140 |
| 09KY002 | 2009 | Locust Creek Bridge Replacement (at Hwy 36 West), Carroll County, KY | $88,920 |
| 09KY003 | 2009 | Western Kentucky University (WKU), University-Community Bikeway Project, KY | $889,200 |
| 10KY001 | 2010 | Lexington-Fayette Legacy Trail, KY | $471,609 |
| 10KY002 | 2010 | Scoping Study on Audubon and Natcher Parkways Western Kentucky, KY | $353,707 |
| 11KY006 | 2011 | Shelbyville Road Old US 60 Bridge Study | $100,000 |
| 12KY002 | 2012 | Bluegrass Commerce Park | $477,750 |
| 12KY003 | 2012 | Louisville Metro Strategic
Multimodal Transportation Plan | $600,000 |
| Total: (50 Projects) | $47,460,295 |
Louisiana
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 99LA01 | 1999 | New Orleans Metropolitan Region | $450,000 |
| 00LA01 | 2000 | River Parishes: Transit Authority Transportation Coordination Plan | $143,000 |
| 00LA03 | 2000 | New Orleans: International Technology Center: An Integrated "Hub and Spoke" Transportation and Neighborhood Revitalization Strategy | $225,000 |
| E1LA01 | 2001 | Lincoln Parish Transportation Plan | $1,406,150 |
| E1LA02 | 2001 | New Orleans: Intermodal Transportation Research | $890,561 |
| E2LA01 | 2002 | Ascension Parish St. Landry Road Extension & I-10 Link Study | $495,654 |
| E2LA02/04 | 2002 | Crowley Historic Parkerson Avenue Redevelopment and Streetscape Improvements | $659,220 |
| E2LA03 | 2002 | Downtown Development District - Urban Graphics Plan | $495,654 |
| TC03(001) | 2003 | Third Street Downtown Streetscape Project | $250,000 |
| 06LA001 | 2006 | New Orleans City Park Roadway Improvements | $861,300 |
| 08LA001 | 2008 | Interstate 10 Service Road Corridor, Lake Charles, LA | $1,809,080 |
| 08LA002 | 2008 | Signal Synchronization System; Baton Rouge, LA | $316,589 |
| 08LA003 | 2008 | U.S. 190/Collin Blvd. Widening, LA | $452,270 |
| 09LA001 | 2009 | Alemedia Road (LA 50) Intersection Improvements, St. Charles Parish, LA | $266,760 |
| 09LA002 | 2009 | Baton Rouge Riverfront Redevelopment Transportation Improvements, LA | $889,200 |
| 09LA003 | 2009 | Clearview Parkway at Earhart Expressway Transportation and Drainage Upgrades, Jefferson Parish, LA | $333,450 |
| 09LA004 | 2009 | I-10 New Orleans East Upgrades, LA | $177,840 |
| 09LA005 | 2009 | I-10 Pecue Lane Interchange, Baton Rouge, LA | $444,600 |
| 09LA006 | 2009 | I-10 Southwest Frontage Road Design and Construction (between LA 433 and US 190B), LA | $164,502 |
| 09LA007 | 2009 | I-12 Interchange at LA 1088, St. Tammany Parish, LA | $222,300 |
| 09LA008 | 2009 | I-12 Interchange at LA-16, Denham Springs, LA | $889,200 |
| 09LA009 | 2009 | I-49 South, LA | $1,778,400 |
| 09LA010 | 2009 | I-69, Shreveport, LA | $1,778,400 |
| 09LA011 | 2009 | LA-1 Goldenmeadow to Port Fourchon, LA | $955,890 |
| 09LA012 | 2009 | Red Town Road/U.S. 171 Intersection Realignment, Leesville (Vernon Parish), LA | $533,520 |
| 09LA013 | 2009 | US 190 (US 11 to LA 433) Widening, Slidell, LA | $222,300 |
| 10LA001 | 2010 | Belle Chasse Bridge, Belle Chasse, Plaquemines Parish, LA | $471,609 |
| 10LA002 | 2010 | New Orleans City Park Infrastructure Improvements, New Orleans, LA | $1,837,390 |
| 12LA005 | 2012 | North Boulevard Promenade | $1,144,547 |
| Total: (29 Projects) | $20,564,386 |
Michigan
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 99MI05 | 1999 | Saginaw Metropolitan Region | $48,000 |
| 99MI12 | 1999 | Lansing, Tri-County Region | $355,000 |
| E0MI01 | 2000 | Northwest Michigan Transportation Use Initiative | $108,875 |
| E1MI01 | 2001 | City of Ferndale: Traffic Signals | $46,872 |
| E1MI02 | 2001 | Flint: Transportation Planning and Origin & Destination Shipping Study | $140,615 |
| E1MI03 | 2001 | Detroit: Lodge Freeway Pedestrian Overpass | $843,690 |
| E2MI01 | 2002 | Eastern Market Pedestrian Overpass Park | $495,654 |
| E2MI02 | 2002 | White Lake Road | $991,307 |
| TC03(001) | 2003 | Detroit Streetscape Improvements | $350,000 |
| TC03(002) | 2003 | Detroit Area Regional Transportation Authority (DARTA) | $500,000 |
| TC03(003) | 2003 | Farmington Hills Living Wall Project | $200,000 |
| 04MI001 | 2004 | Woodward Avenue Livable Community Project | $197,488 |
| 06MI001 | 2006 | Snow Plows for the Mackinac Island State Park Commission | $193,793 |
| 09MI001 | 2009 | 4-Laning of Baldwin Road to the I-75 Interchange, Oakland County, MI | $222,300 |
| 09MI002 | 2009 | Access Ramps and Widening of Latson Road, Livingston County, MI | $533,520 |
| 09MI003 | 2009 | Buena Vista Township, Michigan-Town Center Infrastructure and Streetscape, MI | $222,300 |
| 09MI004 | 2009 | Construction of a Bicycle Path Between Lexington and Port Sanilac, Sanilac County, MI | $444,600 |
| 09MI006 | 2009 | Expansion of Southfield Road, Southfield, MI | $489,060 |
| 10MI001 | 2010 | Bike Path between Lexington and Port Sanilac, MI | $235,804 |
| 10MI002 | 2010 | Mount Clemens non-motorized trail along North-bound Gratiot, Mount Clemens, MI | $542,350 |
| 10MI003 | 2010 | Pedestrian Path for the City of New Baltimore, MI | $235,804 |
| 11MI009 | 2011 | Reo Town Complete Streets Project | $326,100 |
| 11MI021 | 2011 | Detroit Region Aerotropolis Development Corporation Transportation Planning Project | $260,880 |
| 12MI001 | 2012 | WALLY (Washentaw and Livingston Line) Commuter Rail | $640,000 |
| 12MI003 | 2012 | Michigan Flyer New I-96 Route | $595,680 |
| 12MI011 | 2012 | Buena Vista Town Center Transportation Upgrade | $500,000 |
| Total: (26 Projects) | $9,719,692 |
Mississippi
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| E0MS01 | 2000 | Jackson: Pearl River Airport Connector Study | $871,000 |
| E1MS01 | 2001 | Claiborne County: Access Road From US 61 to New Port Facility | $374,973 |
| E1MS02 | 2001 | Jackson: Traffic Congestion Mitigation Planning | $562,460 |
| E2MS01 | 2002 | Jackson Traffic Calming Program | $1,982,615 |
| E2MS02 | 2002 | Roadway Expansion, East Metropolitan Business Park (EMC Parkway Extension No. 2) | $1,982,615 |
| E2MS03 | 2002 | Port of Vicksburg Study | $396,523 |
| E2MS04 | 2002 | Lowndes County Highway 45 | $1,982,615 |
| TC03(001) | 2003 | Clinton Northside Drive Corridor Design | $500,000 |
| 04MS001 | 2004 | U.S. 49 from Florence, Mississippi to I-20 | $752,335 |
| 05MS001 | 2005 | Hattiesburg Rail-Roadway Intersection Congestion Study | $254,448 |
| 06MS001 | 2006 | Choctaw Roads | $2,583,900 |
| 06MS002 | 2006 | Natchez Historical Trail | $172,260 |
| 08MS001 | 2008 | East Metropolitan Corridor-- Rankin County, MS | $226,135 |
| 08MS002 | 2008 | Hwy 27 Hurricane Evacuation Route, MS | $90,454 |
| 09MS001 | 2009 | Barnes Crossing Road/Natchez Trace Parkway Bridge, MS | $444,600 |
| 09MS002 | 2009 | Capitol Street Renaissance Project, MS | $2,667,600 |
| 09MS003 | 2009 | Dentville - Jack Road Project, Copiah County, MS | $444,600 |
| 09MS004 | 2009 | East Metropolitan Corridor, Rankin County, MS | $222,300 |
| 09MS005 | 2009 | Hattiesburg 4th Street Improvements, MS | $1,778,400 |
| 09MS006 | 2009 | I-20/59 Interchange, Lauderdale County, MS | $533,520 |
| 09MS007 | 2009 | Town of Sherman Roadway and Traffic Improvements, MS | $889,200 |
| 09MS008 | 2009 | Urban Collector Project, MS | $444,600 |
| 09MS009 | 2009 | Urban Collector Road along I-10 North, MS | $1,778,400 |
| 09MS010 | 2009 | US Hwy 49/82 Mississippi Hwy 7 Connector Road Project, Greenwood, MS | $355,680 |
| 10MS001 | 2010 | US 78 Upgrade to Interstate Standards, MS | $943,218 |
| 12MS004 | 2012 | Mill Street Bridge on Woodrow Wilson Ave | $1,000,000 |
| Total: (26 Projects) | $24,234,451 |
Missouri
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 99MO06 | 1999 | Kansas City Metropolitan Region | $600,000 |
| 00MO01 | 2000 | St Louis: Initiative for a Metropolitan Community | $300,000 |
| E1MO01 | 2001 | Kansas City: Illus Davis Mall Enhancements | $328,102 |
| E1MO02 | 2001 | St. Louis: South Kings Highway Business District Pilot Program | $93,743 |
| E1MO03 | 2001 | Springfield: Center City Plan | $703,075 |
| E2MO01 | 2002 | Missouri Highway 21 - Resurface Roadway & Rehab Bridge Over Sandy Creek | $6,939,150 |
| E2MO02 | 2002 | Springfield Center City Streetscape Improvements (Phase 3) | $991,307 |
| E2MO03 | 2002 | Cross County Corridor Study | $495,654 |
| TC03(001) | 2003 | I-55/Main St. Intersection | $100,000 |
| TC03(002) | 2003 | Riverfront Heritage Trail, Segment 4F-East-West Connector | $400,000 |
| 05MO001 | 2005 | Lakeview Park trail | $318,060 |
| 06MO001 | 2006 | City of Clinton Downtown Revitalization | $430,650 |
| 06MO002 | 2006 | Richmond Downtown Revitalization | $861,300 |
| 06MO003 | 2006 | SI. Louis Central Business District Street Improvements | $215,325 |
| 06MO004 | 2006 | SLU Streetscape Improvements | $1,291,950 |
| 06MO005 | 2006 | Springfield Downtown Streetscape Improvements | $861,300 |
| 06MO006 | 2006 | West City Park Road Resurfacing | $137,808 |
| 08MO001 | 2008 | Brush Creek Beautification, Kansas City, MO | $904,540 |
| 08MO002 | 2008 | Highway N Improvements, Platte County, MO | $452,270 |
| 09MO001 | 2009 | Brush Creek at Troost Improvements, MO | $444,600 |
| 09MO002 | 2009 | City of Ashland Main Street Redevelopment Project, MO | $444,600 |
| 09MO003 | 2009 | COLT Railroad Overpass at U.S. 63, Columbia, MO | $444,600 |
| 09MO004 | 2009 | Construction of Lafayette Interchange, MO | $889,200 |
| 09MO005 | 2009 | Extension of MO-740 to the I-70/Lake of the Woods Interchange, Columbia, MO | $222,300 |
| 09MO006 | 2009 | Maintenance of the Washington Bridge (Rt. 47 Bridge) over the Missouri River, Washington, MO | $266,760 |
| 09MO007 | 2009 | Mexico Technology Park, MO | $889,200 |
| 09MO008 | 2009 | Preliminary Design and Environmental Study for US 63 Improvements (Osage, Maries, and Phelps Counties), MO | $311,220 |
| 09MO009 | 2009 | River Des Peres Boulevard Improvements, St. Louis, MO | $222,300 |
| 09MO010 | 2009 | Route 32 Safety Improvements in Cedar County, MO | $444,600 |
| 09MO011 | 2009 | Route 61 Corridor Study and Engineering, Lincoln and St. Charles Counties, MO | $177,840 |
| 09MO012 | 2009 | State Route 13 from Route 24 to County Road 113, Lafayette County, MO | $444,600 |
| 09MO013 | 2009 | Tucker Boulevard Bridge, MO | $311,220 |
| 09MO014 | 2009 | U.S. 61 Bypass, Hannibal, MO | $222,300 |
| 09MO015 | 2009 | Upgrade and Partly Relocate MO Rt 141, St Louis County, MO | $222,300 |
| 10MO001 | 2010 | Bridge Replacement, MO 79 at Sandy Creek, Lincoln County, MO | $377,287 |
| 10MO002 | 2010 | River Des Peres Boulevard Improvements, MO | $188,644 |
| 11MO022 | 2011 | US 71 Corridor Transportation Alternatives Analysis | $652,200 |
| 12MO015 | 2012 | Access Improvements at St. Joseph Medical Center Employment Hub, Kansas City, Missouri | $240,000 |
| 12MO020 | 2012 | Northside Livability Initiative | $600,000 |
| Total: (39 Projects) | $24,440,005 |
New Jersey
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 99NJ14
99NJ14 | 1999 | Newark, northern area of State | $700,000 |
| 99NJ34 | 1999 | NJ Transit accessed communities | $535,000 |
| E0NJ01 | 2000 | Monmouth County: Pedestrian Improvements | $261,300 |
| E0NJ02 | 2000 | Montclair: Transit Project | $217,750 |
| E0NJ03 | 2000 | North Jersey Transportation Planning Authority | $696,800 |
| E0NJ04 | 2000 | South Amboy: Multimodal Transportation Initiative | $217,750 |
| E1NJ01 | 2001 | Hudson River Waterfront Walkway | $1,874,866 |
| E1NJ02 | 2001 | Borough of Flemington: Park Avenue Realignment | $1,101,484 |
| E1NJ03 | 2001 | Town of South Brunswick: Route 522 Construction | $234,358 |
| E1NJ04 | 2001 | City of Bedminster: Bike Path | $468,717 |
| E2NJ01 | 2002 | Lodi Project Improvements to Route 46 | $991,307 |
| E2NJ02 | 2002 | Hopewell Borough Street Flooding Project | $297,392 |
| E2NJ03 | 2002 | Lambertville Street Flooding Improvements | $297,392 |
| E2NJ04 | 2002 | Land Use Municipal Resource Center | $1,982,615 |
| E2NJ05 | 2002 | Manalapan Township Woodward Road Reconstruction | $247,827 |
| E2NJ06 | 2002 | Oceanport Road Flooding Improvements | $297,392 |
| E2NJ07 | 2002 | Paramus & Hackensack Route 17 and Essex Street Congestion Alleviation | $297,392 |
| E2NJ08 | 2002 | Raritan Township Clover Hill Road Reconstruction | $991,307 |
| E2NJ09 | 2002 | South Amboy Regional Intermodal Transportation Initiative | $991,307 |
| E2NJ10 | 2002 | West Deptford Riverwinds Project | $495,654 |
| E2NJ11 | 2002 | West Windsor Township Bicycle Path | $198,261 |
| TC03(001) | 2003 | Pedestrian Overpass Project | $250,000 |
| TC03(002) | 2003 | Traffic Signalization Improvement Project | $1,000,000 |
| TC03(003) | 2003 | Passaic Street at Route 17 Project | $100,000 |
| TC03(004) | 2003 | West Amwell Connaught Avenue Street Drainage Project | $100,000 |
| TC03(005) | 2003 | Intersection Improvements and Signalization of Schoolhouse and Perrineville Roads | $100,000 |
| TC03(006) | 2003 | MVC Agency Video Survelance Initiative | $1,000,000 |
| TC03(007) | 2003 | Marlboro Township Traffic Improvement Project | $100,000 |
| TC03(008) | 2003 | North-South Connection Glassboro High Street Commercial Corridor and Rowan University | $588,000 |
| 04NJ001 | 2004 | Route 29 Recreational Bike and Pedestrian Path Mercer* | $940,419 |
| 05NJ001 | 2005 | Hammonton Pedestrian Downtown Improvements | $169,632 |
| 08NJ001 | 2008 | Newark Downtown Core Redevelopment District, NJ | $606,042 |
| 08NJ002 | 2008 | Route 46, Main Street, Lodi | $225,645 |
| 08NJ003 | 2008 | South Orange Avenue Roadway Improvements, Essex County, NJ | $226,135 |
| 09NJ001 | 2009 | Bellmawr Borough/Route 42 Culvert Replacement Project, NJ | $266,760 |
| 09NJ002 | 2009 | College Avenue Bus Shelter Redesign | $889,200 |
| 09NJ003 | 2009 | Egg Harbor City Transit Hub, NJ | $222,300 |
| 09NJ004 | 2009 | Extension of the Lawrence-Hopewell Trail, Pennington, NJ | $266,760 |
| 09NJ005 | 2009 | Finnegans Lane, North Brunswick Township, NJ | $311,220 |
| 09NJ006 | 2009 | Hudson River Waterfront Walkway, NJ | $444,600 |
| 09NJ007 | 2009 | I-295/76/42 Direct Connection, NJ | $2,667,600 |
| 09NJ008 | 2009 | Kapkowski Road Transportation Planning Area/North Avenue Corridor, NJ | $355,680 |
| 09NJ009 | 2009 | Signalization Improvements, Elizabeth, NJ | $444,600 |
| 10NJ001 | 2010 | 7th Street Gateway Streetscape Enhancement Project , NJ | $459,347 |
| 10NJ002 | 2010 | Camden Waterfront Neighborhood Development Initiative, NJ | $459,347 |
| 10NJ003 | 2010 | Replacement of Storm Sewer Adjacent Route 42, Bellmawr, NJ | $471,609 |
| 11NJ002 | 2011 | Planning for Emerging Centers | $130,440 |
| 11NJ006 | 2011 | Bloomfield Center Intersection Improvement Project | $847,860 |
| 12NJ002 | 2012 | The Oranges Freeway Drive Transportation Improvement Project | $286,400 |
| 12NJ004 | 2012 | Passaic County Morris Canal Greenway Project | $532,566 |
| Total: (50 Projects) | $27,858,033 |
New Mexico
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 00NM04 | 2000 | Santa Fe: Solana Neighborhood Center - A Model for Growth without Sprawl | $200,000 |
| E0NM01 | 2000 | Albuquerque: Transportation Management Program | $522,600 |
| E0NM02 | 2000 | Raton: Historic Rehabilitation Project | $522,600 |
| E1NM01 | 2001 | Clovis: Street Revitalization | $703,075 |
| E1NM02 | 2001 | Albuquerque: High Capacity Transportation System Study | $468,717 |
| E1NM03 | 2001 | Las Cruces: Railroad and Transportation Museum | $187,487 |
| E1NM04 | 2001 | Raton: Rail Depot/Intermodal Center Redevelopment | $703,075 |
| E1NM05 | 2001 | Uptown Transportation Management Program | $468,717 |
| E2NM01 | 2002 | Isleta Boulevard Improvement Project | $4,956,536 |
| TC03(001) | 2003 | Moriarity Old Route 66 Streetscape | $400,000 |
| 04NM001 | 2004 | Hobbs Industrial Air Park Roads | $94,042 |
| 05NM001 | 2005 | Fairgrounds Road in Alamagordo* | $339,264 |
| 05NM002 | 2005 | Resurfacing Diaz Avenue in Hurley | $84,816 |
| 06NM001 | 2006 | Resurface San Juan County Road 4990 | $495,248 |
| 08NM001 | 2008 | U.S. 550 Improvements, Bernalillo, NM | $452,270 |
| 09NM001 | 2009 | City of Hobbs, East Bypass, NM | $88,920 |
| 09NM002 | 2009 | East Aztec Arterial Route, NM | $288,990 |
| 09NM003 | 2009 | Main Street Improvements and Downtown Revitalization, Las Cruces, NM | $489,060 |
| 09NM004 | 2009 | Northwest Loop Access Road, Sandoval County, NM | $577,980 |
| 09NM005 | 2009 | Pinon Hills Boulevard East and Animas River Bridge, NM | $838,071 |
| 09NM006 | 2009 | Sunport Extension to Broadway Blvd, Albuquerque, NM | $88,920 |
| 11NM003 | 2011 | University of New Mexico/ Central New Mexico Community College Area Transit and Land Use Project | $326,100 |
| 12NM001 | 2012 | Santa Fe County Pavement Preservation Program | $657,488 |
| 12NM003 | 2012 | East Main Street Corridor Traffic Signal Improvement Project | $400,000 |
| Total: (24 Projects) | $14,353,976 |
New York
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 99NY02 | 1999 | South Troy waterfront | $70,000 |
| 00NY02 | 2000 | Hamilton Arterial Access Management, Local Street Network and Land Development Interface Plan | $80,000 |
| E0NY01 | 2000 | New Rochelle: Intermodal Center | $435,500 |
| E0NY02 | 2000 | White Plains: TRANSCENTER Pedestrian Improvements | $871,000 |
| E1NY01 | 2001 | Bronx: Soundview Greenway | $937,433 |
| E1NY02 | 2001 | Greenport: Mitchell Marina Development | $234,358 |
| E2NY01 | 2002 | Bronx River Greenway Concrete Plant | $743,480 |
| E2NY02 | 2002 | Brooklyn Bridge Park Development Corporation Study | $991,307 |
| E2NY03 | 2002 | Buffalo Inner Harbor & Waterfront Development | $1,556,352 |
| E2NY04 | 2002 | Green Island Road and Infrastructure Project | $2,577,399 |
| E2NY05 | 2002 | Historic Erie Canal Aqueduct Redevelopment, NW | $1,090,438 |
| E2NY06 | 2002 | Lindenhurst River Street and Prairie Lane Coastal Zone Road Raising & Drainage Improvement Project | $495,654 |
| E2NY07 | 2002 | Lindenhurst Shore Road and South Bay Street Coastal Zone Road Raising and Drainage Improvement Project | $495,654 |
| E2NY08 | 2002 | Lindenhurst South 7th St Road Raising and Drainage Improvement Project | $247,827 |
| E2NY09 | 2002 | Mamaroneck Pedestrian Improvements (Myrtle Boulevard) | $123,913 |
| E2NY10 | 2002 | Mount Vernon Commuter Rail Station Improvements | $991,307 |
| E2NY11 | 2002 | New Rochelle North Avenue Pedestrian Street Improvements | $991,307 |
| E2NY12 | 2002 | Niagara Frontier Transportation Authority (NFTA) Development Plan | $99,131 |
| E2NY13 | 2002 | Queens Boulevard Pedestrian Improvements | $495,654 |
| E2NY14 | 2002 | Queens Atlantic Avenue Extension | $1,982,615 |
| E2NY15 | 2002 | Route 22/Mill Road Pedestrian Street Improvements | $743,480 |
| E2NY16 | 2002 | Syracuse Lakefront Project | $1,486,961 |
| E2NY17 | 2002 | Tioughnioga Waterfront Development | $495,654 |
| E2NY18 | 2002 | Tompkins County Strategic Initiative | $128,870 |
| E2NY19 | 2002 | Wyandanch Traffic Signals, Sidewalks and Improvements | $396,523 |
| TC03(001) | 2003 | Frink Park Pier Project | $250,000 |
| TC03(002) | 2003 | Ulster County Visitor Center | $1,000,000 |
| TC03(003) | 2003 | Copeland Covered Bridge | $28,000 |
| TC03(004) | 2003 | Syracuse Lakefront Project | $1,400,000 |
| TC03(005) | 2003 | Amsterdam Waterfront Revitalization Project | $500,000 |
| TC03(006) | 2003 | Bronx Center Transportation Project - Section II | $700,000 |
| TC03(007) | 2003 | Bronx Center Transportation Project (East 161st Street), Streetscape Improvement Between Park & 3rd Avenue | $300,000 |
| TC03(008) | 2003 | Bronx River Greenway-Bruckner to Hunts Point Riverside Park | $700,000 |
| 04NY001 | 2004 | Briarcliff Manor Union Free School District Traffic Light | $141,063 |
| 04NY002 | 2004 | Regional Plan Association Willimasburg/Navy Yard/Vinegar Hill Corridor Access | $188,084 |
| 04NY002 | 2004 | Civic Center Streetscape Improvement | $470,208 |
| 04NY004 | 2004 | High Line Project, New York City | $470,208 |
| 05NY001 | 2005 | New Cassel Revitalization Project | $848,160 |
| 06NY001 | 2006 | Brooklyn Queens Express Mitigation Study* | $258,390 |
| 06NY002 | 2006 | Cambridge Rail Yard Revitalization | $516,780 |
| 06NY003 | 2006 | City of Newburgh | $301,455 |
| 06NY004 | 2006 | Clean Fuel Service Station | $275,616 |
| 06NY005 | 2006 | North Hempstead Hybrid Vehicle Fleet | $236,858 |
| 06NY006 | 2006 | Old Montauk Highway | $258,390 |
| 06NY007 | 2006 | Syracuse Connective Corridor | $1,722,600 |
| 08NY001 | 2008 | Hofstra University's Safe and Sustainable Campus Plan, NY | $705,541 |
| 08NY002 | 2008 | Lincoln Center Corridor Redevelopment Project, NY | $451,290 |
| 08NY003 | 2008 | Little Neck Quiet Zone, NY | $226,135 |
| 08NY004 | 2008 | Main Street Streetscape, Haverstraw, NY | $158,295 |
| 08NY005 | 2008 | New York State Routes 5, 8, 12 Viaduct and Route 5A and 5S, Utica, NY | $678,405 |
| 09NY001 | 2009 | BNMC Infrastructure Improvements Program, Buffalo, NY | $222,300 |
| 09NY002 | 2009 | Conversion of Outboard Detour Roadway to a Bikeway, Esplanade, NY | $444,600 |
| 09NY003 | 2009 | Design, Engineering, and Construction of the Glen Cove Connector Road, Glen Cove, NY | $533,520 |
| 09NY004 | 2009 | Downtown Revitalization, Village of Melverne, NY | $355,680 |
| 09NY005 | 2009 | Green County Route 9W/81 Intersection Rehabilitation and Traffic Reduction Project, NY | $666,900 |
| 09NY006 | 2009 | High Line Project, New York, NY | $222,300 |
| 09NY007 | 2009 | I-278 Environmental Shield, NY | $444,600 |
| 09NY008 | 2009 | Main Street Multimodal Access and Revitalization Project, NY | $889,200 |
| 09NY009 | 2009 | Murray Athletic Center at Elmira College Access Road Improvements, Chemung County, NY | $533,520 |
| 09NY010 | 2009 | Nellie Hill Bridge Replacement, Dover, NY | $222,300 |
| 09NY011 | 2009 | Revitalization and Development of the General Business District, Inc. Village of Cedarhurst, NY | $133,380 |
| 09NY012 | 2009 | Route 6 Improvements, Peekskill, NY | $622,440 |
| 09NY013 | 2009 | Safe Routes for Seniors and Kids Programs, NY | $666,900 |
| 09NY014 | 2009 | Traffic Signal Modernization, Utica, NY | $444,600 |
| 10NY001 | 2010 | Completion of future I-99, US Route 15 in Steuben County, NY | $918,694 |
| 10NY002 | 2010 | County Rails-to-trails Economic Development and Tourism Project, NY | $94,322 |
| 10NY003 | 2010 | Midtown Transportation Infrastructure, NY | $1,286,173 |
| 10NY004 | 2010 | New York City Commerical Vehicle Monitoring and Enforcement Program, NY | $471,609 |
| 10NY005 | 2010 | Pearl River Downtown Revitalization, NY | $188,644 |
| 10NY006 | 2010 | Pedestrian Safety Improvement Project. NY | $275,608 |
| 10NY007 | 2010 | Pedestrian walkway and waterfront access, Roosevelt Island, NY | $471,609 |
| 10NY008 | 2010 | Road Reconstruction, Village of Rockville Centre, NY | $471,609 |
| 10NY009 | 2010 | Van Cortlandt Trails Restoration, NY | $169,779 |
| D10NY010 | 2010 | Poughkeepsie TOD Conceptual Plan | $95,000 |
| 11NY032 | 2011 | Route 248 Sidewalk Project | $391,320 |
| 11NY042 | 2011 | Wyandanch Intermodal Plaza and Roadway Network Construction (New York) | $1,956,601 |
| 12NY001 | 2012 | I-787 Livable Corridor Planning Initiative | $240,000 |
| 12NY003 | 2012 | Broad Street Two-Way Conversion Project | $400,000 |
| 12NY011 | 2012 | Fonda Connector Study | $400,000 |
| Total: (79 Projects) | $45,780,503 |
North Carolina
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 99NC06 | 1999 | Research Triangle Region | $450,000 |
| 00NC03 | 2000 | Bethania: Comprehensive Transportation Study | $150,000 |
| E2NC01 | 2002 | Cabarrus Avenue Gateway to Center City | $2,775,660 |
| E2NC02 | 2002 | Charlotte Neighborhood Connections for Non-Motorized Travel | $198,261 |
| E2NC03 | 2002 | Charlotte Extend and Integrate the Existing Freeway Communication System | $991,307 |
| E2NC04 | 2002 | Henderson Downtown Street Widening (The Embassy Project) | $991,307 |
| E2NC05 | 2002 | Hillsborough Weigh Station | $346,958 |
| TC03(001) | 2003 | The American Tobacco Trail Project | $600,000 |
| 06NC001 | 2006 | Pembroke Rail Feasibility Study | $129,195 |
| 06NC002 | 2006 | Robeson County Rail Spur Feasibility Study | $172,260 |
| 07NC001 | 2007 | Interstate Congestion Detection System | $800,000 |
| 08NC001 | 2008 | Clayton Pedestrian Grade Separation, Johnston County, NC | $331,698 |
| 08NC002 | 2008 | US 17 in Beaufort County, NC | $338,468 |
| 09NC001 | 2009 | Garden Parkway, Gaston County, NC | $355,680 |
| 09NC002 | 2009 | High Point Greenways Project, High Point, NC | $88,920 |
| 09NC003 | 2009 | Universal Street Railroad Overpass Project, NC | $889,200 |
| 09NC004 | 2009 | US 74 Monroe Bypass, Mecklenburg and Union Counties, NC | $222,300 |
| 09NC005 | 2009 | US-401 Widening in Cumberland, Harnett, and Wake Counties, NC | $222,300 |
| 09NC006 | 2009 | Widen SR 1306 and SR 1363 (Mebane Street) from SR 1158 to NC 54, Burlington, NC | $400,140 |
| 10NC001 | 2010 | 10th St. Connector--To extend 10th Street Dickinson Avenue to Stantonsburg Road, Greenville, NC | $471,609 |
| 10NC002 | 2010 | Improvements to US 74/76, Columbus County, NC | $330,126 |
| 10NC003 | 2010 | Mingo Creek Greenway, Knightdale, NC | $235,804 |
| 10NC004 | 2010 | New Hanover Greenway System, NC | $229,674 |
| 10NC005 | 2010 | U. S. 401 Widening Project, NC | $565,931 |
| 11NC002 | 2011 | Matthews-Mint Hill Road and NC 51 Roundabout | $526,027 |
| 11NC007 | 2011 | Sweetwater Road Extension | $978,300 |
| 11NC011 | 2011 | South Tar River Greenway | $907,609 |
| 12NC003 | 2012 | Concord Traffic Management System | $1,000,000 |
| 12NC008 | 2012 | Carthage Road and Water Street Improvements Project | $556,000 |
| Total: (29 Projects) | $16,254,734 |
Ohio
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 99OH10 | 1999 | Woodmere Village, Chagrin Boulevard, Cleveland | $195,000 |
| 99OH12 | 1999 | Dayton, downtown industrial area | $300,000 |
| 00OH03 | 2000 | Cleveland: Restoring Urban Livability- Neighborhood Solutions to Intrusive Commuter Traffic | $259,000 |
| E1OH01 | 2001 | Toledo: Buckeye Greenbelt Parkway Beautification | $234,358 |
| E1OH02 | 2001 | Dayton: Huffman Prairie Flying Field Pedestrian and Multimodal Gateway Entrance | $656,203 |
| E1OH03 | 2001 | Ohio and Erie Canal Corridor Trail Development | $937,433 |
| E2OH01 | 2002 | Stark and Mahoning Counties US 62-39 Improvements | $1,982,615 |
| E2OH02 | 2002 | Dayton Huffman Prairie Flying Field Pedestrian & Multimodal Gateway Entrance | $1,486,961 |
| E2OH03 | 2002 | National Underground Railroad Freedom Center | $2,973,922 |
| E2OH04 | 2002 | NE Ohio & Erie Canal Corridor | $991,307 |
| TC03(001) | 2003 | Ohio River Trail--Salem to Downtown | $150,000 |
| TC03(002) | 2003 | Interstate 70 at State Route 202 Interchange | $750,000 |
| TC03(003) | 2003 | Gasholder House Restoration/Multi-Modal Welcome | $200,000 |
| TC03(004) | 2003 | Phase 1 & 4 Multi-Purpose Buggy and Recreational Trail | $520,000 |
| TC03(005) | 2003 | Simon Kenton Trail | $1,500,000 |
| TC03(006) | 2003 | Bagley Road Modification Project | $1,300,000 |
| TC03(007) | 2003 | Comprehensive Transportation Impact Study | $300,000 |
| 04OH001 | 2004 | Riverwalk Warren, Ohio | $470,209 |
| 04OH002 | 2004 | Uptown Crossings Vine Street Improvement Project | $940,419 |
| 06OH001 | 2006 | Clark County Fairgrounds Improvements | $387,585 |
| 06OH002 | 2006 | Holmes County Trail Enhancements | $215,325 |
| 08OH001 | 2008 | City of Northwood, OH Wales Road Grade Separation | $452,270 |
| 08OH002 | 2008 | Eastgate Area Improvements, OH | $226,135 |
| 08OH003 | 2008 | Flats Eastbank Project, City of Cleveland, OH | $768,859 |
| 08OH004 | 2008 | Mehring Way Street Grid East, Cincinnati, OH | $180,908 |
| 08OH005 | 2008 | Scioto Mile River Level Park Project, Columbus, OH | $451,290 |
| 08OH006 | 2008 | White Pond Drive Expansion, OH | $606,042 |
| 09OH001 | 2009 | 11th Street Revitalization Project, Canton, OH | $355,680 |
| 09OH002 | 2009 | Central Riverfront Street Grid: Mehring Way Relocation, Cincinnati, OH | $444,600 |
| 09OH003 | 2009 | Chesapeake By-Pass, OH | $444,600 |
| 09OH004 | 2009 | Detroit Avenue Public Right-of-Way Improvements, OH | $311,220 |
| 09OH005 | 2009 | Eastgate Area Improvements, Clermont County, OH | $533,520 |
| 09OH006 | 2009 | Martha Ave/I-76 Connector, Akron, OH | $1,111,500 |
| 09OH007 | 2009 | Massillon Road Bridge Improvement, Summit County, OH | $444,600 |
| 09OH008 | 2009 | Pedestrian/Bicycle Recreation Trail Over the Tuscarwaras River Along the Ohio and Erie Canalway Recreation Trails, Stark Cnty, OH | $444,600 |
| 09OH009 | 2009 | Street Widening, Grandview Heights, OH | $222,300 |
| 09OH010 | 2009 | Upgrade of Alum Creek Drive at I-270 and at Groveport Road, Franklin County, OH | $533,520 |
| 09OH011 | 2009 | Warren, OH Greenway Bike Trail, OH | $311,220 |
| 09OH012 | 2009 | Widening of Route 50 , Ross County, OH | $444,600 |
| 09OH013 | 2009 | Zanesville State Street Bridge Renovation and Repair Project, OH | $444,600 |
| 10OH001 | 2010 | Tri-State Outerbelt (State Route 7/Chesapeake By-Pass), OH | $660,253 |
| 11OH002 | 2011 | Warrensville/Van Aken Intersection Reconfiguration | $453,804 |
| 12OH010 | 2012 | State Road Improvements | $1,135,000 |
| Total: (43 Projects) | $27,731,458 |
Oklahoma
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 00OK01 | 2000 | Oklahoma City: OKC Water Transportation System | $178,000 |
| E1OK01 | 2001 | Tulsa/Sapula Union Railroad Overpass at Oakridge Elementary School | $374,973 |
| E2OK01 | 2002 | Great Lake Recreation Area Traffic Study | $247,827 |
| E2OK02 | 2002 | Midwest City Downtown Revitalization Project | $991,307 |
| E2OK03 | 2002 | Navajo Gateway Project | $198,261 |
| TC03(001) | 2003 | I-40 and Avenue "F" Ramp Project | $500,000 |
| TC03(002) | 2003 | Oklahoma Transportation Center | $350,000 |
| TC03(003) | 2003 | Broken Arrow South Loop Trail-161st to NSU Campus | $1,250,000 |
| 04OK001 | 2004 | Road Construction for Industial Park for City of Vinita | $94,042 |
| 04OK002 | 2004 | Rockford Road, Ardmore | $658,293 |
| 05OK001 | 2005 | Midwest City Hudiburg Drive Improvements | $742,140 |
| 05OK002 | 2005 | Mingo Trail Construction | $169,632 |
| 05OK003 | 2005 | Norman Railroad Grade Separations | $848,160 |
| 08OK001 | 2008 | Robinson Grade Separation, City of Norman, OK | $315,903 |
| 08OK002 | 2008 | US 169 Highway Widening Environmental Assessment, City of Owasso, OK | $316,589 |
| 09OK001 | 2009 | Extend Falcon Road from Park Lane to Veterans Drive, Altus, OK | $400,140 |
| 09OK002 | 2009 | Reconstruction and Replacement of the I-244 Bridge over the Arkansas River, Tulsa, OK | $355,680 |
| 09OK003 | 2009 | Reconstruction of the I-44 Bridge Over 163rd Street (Including the Interchange), Tulsa, OK | $533,520 |
| 09OK004 | 2009 | Salt Fork of the Red River Bridge Martha Crossing, OK | $1,333,800 |
| 09OK005 | 2009 | SW 9th Avenue Widening--Main St. to US69/75, Durant, OK | $355,680 |
| 09OK006 | 2009 | Traffic Light - Piedmont Road and Edmond Road, OK | $88,920 |
| 10OK001 | 2010 | Chapman Road Reconstruction Project, OK | $377,287 |
| 10OK002 | 2010 | US 60, widen between Bartlesville and Pawhuska, Osage County, OK | $377,287 |
| 10OK003 | 2010 | US Highway 169 Widening Project, OK | $471,609 |
| 11OK001 | 2011 | Oklahoma City Sky Dance Pedestrian Bridge | $1,304,400 |
| 12OK001 | 2012 | Pedestrian Accessibility Improvements Project 1 | $525,000 |
| 12OK002 | 2012 | Intermodal Transportation Hub Access | $750,000 |
| Total: (27 Projects) | $14,108,450 |
Pennsylvania
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 99PA05 | 1999 | Centre County, I-99 | $500,000 |
| 99PA08 | 1999 | Philadelphia and Schuylkill Valley | $665,600 |
| 00PA02 | 2000 | York Township: Innovation Through Sustainable Transportation and Land Use | $185,000 |
| 00PA05 | 2000 | Altoona: 1-99 Corridor Community and System Preservation Initiative | $200,000 |
| E1PA01 | 2001 | Pittsburgh: Roberto Clemente Park Pedestrian Improvements | $562,460 |
| E1PA02 | 2001 | Johnstown: Pedestrian and Streetscape Improvements | $374,973 |
| E2PA01 | 2002 | Access Improvements to Rostraver Industrial Park | $495,654 |
| E2PA02 | 2002 | Chester Waterfront Development Streetscape | $495,654 |
| E2PA03 | 2002 | Goucher Wheel and Walk Way | $991,307 |
| E2PA04 | 2002 | Philadelphia Schuylkill Valley Metro Feasibility Study | $495,654 |
| TC03(001) | 2003 | Bike and Pedestrian Improvements Linking Center City to University District | $100,000 |
| TC03(002) | 2003 | Pine Creek Rail-Trail Bridge Rehabilitation | $200,000 |
| TC03(003) | 2003 | Convention Center Riverfront Park | $1,200,000 |
| 04PA001 | 2004 | Miller Farm Bridge | $470,209 |
| 04PA002 | 2004 | Scranton Nay Aug Park Enhancement Project | $376,167 |
| 04PA003 | 2004 | US-222 Kutztown Bypass | $470,209 |
| 04PA004 | 2004 | US30 Bypass-PA10 to US30 Business | $470,209 |
| 05PA001 | 2005 | AltaVista Business Park Entrance | $2,120,400 |
| 05PA002 | 2005 | Philadelphia Port-Access Enhancement Plan | $424,080 |
| 06PA001 | 2006 | Design and Construction of Portzer Road Connector | $387,585 |
| 06PA002 | 2006 | Greenville Borough Streetscape Enhancements | $1,722,600 |
| 06PA003 | 2006 | Hummelstown East Main Street and Walton Avenue Improvements | $645,975 |
| 06PA004 | 2006 | Reading River Road Extension | $344,520 |
| 06PA005 | 2006 | Philmont Avenue Improvements Project | $94,743 |
| 06PA006 | 2006 | Street Road P A Route 132 Expansion Project* | $387,585 |
| 06PA007 | 2006 | Swamp Road Improvement Project | $775,170 |
| 08PA001 | 2008 | Baptist and Broughton Road Intersection, PA | $452,270 |
| 08PA002 | 2008 | High Priority Corridor 31 of the National Highway System in southwestern, PA | $604,729 |
| 08PA003 | 2008 | PUP Ride Share Program, Philadelphia, PA | $902,580 |
| 09PA001 | 2009 | Avenue of the Arts Revitalization and Streetscaping Project, PA | $444,600 |
| 09PA002 | 2009 | Bethlehem Pike Roadway and Streetscape Improvements, Springfield Township, PA | $444,600 |
| 09PA003 | 2009 | Bridge over Brandywine Creek, PA | $666,900 |
| 09PA004 | 2009 | Construction of Bridge Over Valley Creek for Loop Trail at Valley Forge Park, King of Prussia, PA | $133,380 |
| 09PA005 | 2009 | Grove Road Bridge Replacement, Castle Shannon, PA | $533,520 |
| 09PA006 | 2009 | Main Street Streetscape Improvements Project, Boyertown, PA | $444,600 |
| 09PA007 | 2009 | Old Allentown Streetscape Improvements, PA | $444,600 |
| 09PA008 | 2009 | PA 924 and Interstate 81 Interchange Improvements, PA | $889,200 |
| 09PA009 | 2009 | Parking and Street Enhancements at Historic Yellow Springs, Chester Springs, PA | $133,380 |
| 09PA010 | 2009 | Pedestrian and School Children Safety Project, PA | $177,840 |
| 09PA011 | 2009 | Pennsylvania High-Speed Maglev Development Program, PA | $889,200 |
| 09PA012 | 2009 | Perry Square Streetscaping, Erie, PA | $355,680 |
| 09PA013 | 2009 | Prophecy Creek Park Entrance Project, PA | $222,300 |
| 09PA014 | 2009 | Route 8, Duncan Avenue to Wildwood Road, PA | $889,200 |
| 09PA015 | 2009 | Thorn Run Road Interchange Upgrade, Moon Township, PA | $88,920 |
| 09PA016 | 2009 | US 422 River Crossing Complex Project, King of Prussia, PA | $222,300 |
| 09PA017 | 2009 | Veteran's Memorial Bridge, Fallston Bridge, PA | $444,600 |
| 10PA001 | 2010 | Craighead Bridge Replacement, PA | $707,413 |
| 10PA002 | 2010 | Downtown Streetscape Expansion Lansdale, PA | $471,609 |
| 10PA003 | 2010 | Interstate 579 'Cap'--Urban Green Space & Park, Plaza, Pittsburgh, PA | $918,694 |
| 10PA004 | 2010 | Lower Bucks County Waterfront Redevelopment and Access Project, PA | $471,609 |
| 10PA005 | 2010 | US 422 Schuylkill River Crossing Complex, PA | $660,253 |
| D10PA006 | 2010 | CSP Elizabethtown Regional Traffic Signal Synchronization | $233,600 |
| 11PA006 | 2011 | Traffic Signal Upgrades to Improve Mobility and Safety | $3,261,000 |
| 12PA006 | 2012 | Chester Transportation Business Center and Historical District | $1,000,000 |
| 12PA007 | 2012 | Ohio River Bike and Pedestrian Trail Phase I | $200,000 |
| Total: (55 Projects) | $32,464,331 |
South Carolina
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 99SC01 | 1999 | Berkeley, Charleston, Dorchester Region | $300,000 |
| 00SC01 | 2000 | Statewide: Integrated Infrastructure Planning, Model Plan and Process | $423,000 |
| E2SC01 | 2002 | Colombia Harden Street Improvements | $4,956,536 |
| E2SC02 | 2002 | Dillon County, SC-38/I-95 Interchange Improvements | $1,486,961 |
| E2SC03 | 2002 | Mount Pleasant Intersection Improvements SC-41 and US-17 | $495,654 |
| E2SC04 | 2002 | SC-277 Pedestrian Walkway | $991,307 |
| E2SC05 | 2002 | Southern Rural Transportation Center | $8,921,764 |
| TC03(001) | 2003 | Rail Relocation Project | $250,000 |
| 05SC001 | 2005 | Feasibility Study for Norfolk Southern Railroad Crossing | $745,654 |
| 06SC001 | 2006 | I-73 | $1,076,625 |
| 06SC002 | 2006 | Harden Street | $86,130 |
| 09SC001 | 2009 | Environmental Impact Statement for Southern Evacuation Lifeline (SELL)/US 701 Project, Georgetown and Horry Counties, SC | $222,300 |
| 09SC002 | 2009 | I-95/U.S. Highway 301 Interchange Project, Orangeburg County, SC | $88,920 |
| 09SC003 | 2009 | Roadway Improvements for the Clemson University Advanced Materials Center, Anderson County, SC | $266,760 |
| 09SC004 | 2009 | Salters Road Expansion Along I-85, Greenville, SC | $88,920 |
| 09SC005 | 2009 | SC 9 Interchange Improvements, Spartanburg, SC | $266,760 |
| 09SC006 | 2009 | SC Hwy 98 and SC Hwy 160 Connector, SC | $666,900 |
| 09SC007 | 2009 | Widen US 17 in Charleston County from the Isle of Palms Connector to a point at or near Darrell Creek Trail, Mt. Pleasant, SC | $355,680 |
| 09SC008 | 2009 | Widening of US Hwy 221 Between Hunter/Fleming-Smith Industrial City of the City of Laurens, Laurens, SC | $266,760 |
| 10SC001 | 2010 | Blufton Parkway Phases 6/7, SC | $471,609 |
| 10SC002 | 2010 | Parker Bowie Road Bridge Replacement and Widening, Anderson County, SC | $377,287 |
| 10SC003 | 2010 | Salters Road Expansion Along I-85, Greenville, SC | $282,965 |
| 10SC004 | 2010 | Town of Lexington United Traffic Plan, Phase I, SC | $1,229,957 |
| 10SC005 | 2010 | Widening of SC Highway 225, Greenwood, SC | $377,287 |
| 11SC005 | 2011 | Beaufort Rail Trail (Green Corridor) in Beaufort, SC | $1,043,520 |
| 12SC001 | 2012 | US 17 Median Consolidation Project | $1,000,000 |
| Total: (26 Projects) | $26,739,256 |
Texas
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 99TX14 | 1999 | Houston Main Street corridor | $500,000 |
| E0TX01 | 2000 | Houston: Main Street Redevelopment | $435,500 |
| E0TX02 | 2000 | Fort Worth: Corridor Redevelopment | $1,306,500 |
| E0TX03 | 2000 | Lufkin: Livability Demonstration Project | $348,400 |
| E1TX01 | 2001 | Houston: Main Street Connectivity Project | $703,075 |
| E1TX02 | 2001 | Fort Worth: Trolley Study | $703,075 |
| E1TX03 | 2001 | Houston: Main Street Connectivity Project (Omnibus Appropriation) | $1,696,260 |
| E2TX01 | 2002 | Austin Bicycle Commuting Project | $371,740 |
| E2TX02 | 2002 | FM-494 Widening from US-83 to FM-1016 | $991,307 |
| E2TX03 | 2002 | Fort Worth Lancaster Avenue Improvements | $1,486,961 |
| E2TX04 | 2002 | City of Frisco | $991,307 |
| E2TX05 | 2002 | Harris County 911 Emergency Network | $495,654 |
| E2TX06 | 2002 | Highway 24 Segment Completion | $991,307 |
| E2TX07 | 2002 | Houston Main Street Corridor Pilot Project Implementation | $495,654 |
| E2TX08 | 2002 | Pharr Bridge Toll System Replacement | $411,393 |
| E2TX09 | 2002 | Sunland Park Drive Extension | $495,654 |
| TC03(001) | 2003 | City of Fort Worth Corridor Redevelopment Program | $795,000 |
| TC03(002) | 2003 | Trinity River Visions | $500,000 |
| TC03(003) | 2003 | Corpus Christi Ferry Terminal | $500,000 |
| 04TX001 | 2004 | Clarksville Square, Clarksville | $235,105 |
| 04TX002 | 2004 | Trinity River Visions Neighborhood Linkage | $470,209 |
| 06TX001 | 2006 | Houston Computerized Traffic Signal System | $1,291,950 |
| 06TX002 | 2006 | Texas Medical Center Emergency Services Access | $645,975 |
| 06TX003 | 2006 | US 90 Beautification Project | $129,195 |
| 08TX001 | 2008 | Lane expansion of RM 1431, TX | $451,290 |
| 08TX002 | 2008 | Port Road Expansion and Improvements, TX | $452,270 |
| 09TX001 | 2009 | 4-Laning of Texas SH 24 (from I-30 to the Oklahoma State Line), Paris, TX | $88,920 |
| 09TX002 | 2009 | Big Creek Mitigation Plan for Highway 36, TX | $444,600 |
| 09TX003 | 2009 | Feasibility Study, Sullivan City, TX | $88,920 |
| 09TX005 | 2009 | IH 30 at SH 34 and Monty Stratton Parkway Initiative, TX | $533,520 |
| 09TX006 | 2009 | Mile 1 from Bus 83 to Mile 8, Hidalgo County, TX | $622,440 |
| 09TX008 | 2009 | Reconstruction and Widening of SH-349, Martin and Dawson Counties, TX | $444,600 |
| 09TX009 | 2009 | Relocation of Intersection FM 359 and Mason Road, TX | $444,600 |
| 09TX010 | 2009 | Road Construction, Hidalgo County, TX | $489,060 |
| 09TX011 | 2009 | Robstown Trade Processing and Inland Center, Robstown, TX | $222,300 |
| 09TX012 | 2009 | SH 171 and FM 2231 Traffic Signal, TX | $111,150 |
| 09TX013 | 2009 | NETEX Rail Rehabilitation Initiative, TX | $95,000 |
| 10TX001 | 2010 | FM 493, Hidalgo County, TX | $282,965 |
| 10TX002 | 2010 | Hays-Travis Trail System, TX | $282,965 |
| 10TX003 | 2010 | Loop 82 Railroad Overpass, TX | $660,253 |
| 10TX004 | 2010 | Robstown Inland Port-Street Improvement, TX | $282,965 |
| D10TX005 | 2010 | Dallas Complete Streets initiative | $400,000 |
| 11TX002 | 2011 | The San Antonio Trade Corridor | $1,742,609 |
| 12TX001 | 2012 | Missouri Kansas Texas Trail Spur Connector | $800,000 |
| 12TX002 | 2012 | Bridge of the Americas Improvements | $400,000 |
| Total: (45 Projects) | $26,331,648 |
Virginia
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 99VA03 | 1999 | Charlottesville, Jefferson Area | $517,920 |
| 00VA04 | 2000 | Northern Virginia: Phase II Impact Assessment of the Virginia Railway Express Commuter Rail on Land Use Development Patterns study | $150,441 |
| E0VA01 | 2000 | Arlington County: Pedestrian, Bicycle Access & Other Transit Improvements | $435,500 |
| E0VA02 | 2000 | Richmond: Main Street Intermodal Facility | $1,524,250 |
| E1VA01 | 2001 | Fairfax County: Cross County Trail/Potomac National Heritage Scenic Trail | $468,717 |
| E1VA02 | 2001 | Virginia Beach: Bike Trail | $374,973 |
| E1VA03 | 2001 | Weigh Stations | $937,433 |
| E2VA01 | 2002 | Springfield Metro/VRE Pedestrian Access Improvements | $495,654 |
| E2VA02 | 2002 | Tidewater Great Dismal Swamp Corridor Master Plan | $178,435 |
| E2VA03 | 2002 | Virginia Beach Atlantic Avenue Trail Extension Project | $793,046 |
| E2VA04 | 2002 | Waterford National Historic District | $991,307 |
| TC03(001) | 2003 | Virginia Beach Virginia Providence Road Trail Project | $150,000 |
| TC03(002) | 2003 | Yorktown Revitalization Projects | $500,000 |
| TC03(003) | 2003 | Campaign to Save Oatland's Scenic Vistas | $500,000 |
| TC03(004) | 2003 | Eisenhower Avenue Greenway, Phase II | $100,000 |
| TC03(005) | 2003 | Route 50 Traffic Calming, Loudoun and Fauquier Counties | $700,000 |
| TC03(006) | 2003 | Transportation Impact Study for the National Air and Space Museum-Under Hazy Center | $50,000 |
| TC03(007) | 2003 | 14th Street Bridge Corridor | $2,000,000 |
| TC03(008) | 2003 | Arlington Boulevard Design Enhancements | $100,000 |
| 05VA001 | 2005 | Culpeper Regional Airport Road Project | $932,976 |
| 06VA001 | 2006 | Fort Eustis Gateway Improvments* | $732,105 |
| 08VA001 | 2008 | Jefferson Park Avenue Project, Charlottesville, VA | $270,774 |
| 09VA002 | 2009 | Extension of the Riverwalk Trail, City of Danville, VA | $88,920 |
| 09VA003 | 2009 | Gilmerton Bridge Replacement, VA | $222,300 |
| 09VA004 | 2009 | Hwy 29 at Elizabeth Street Interchange Construction, Danville, VA | $88,920 |
| 09VA005 | 2009 | I-295/Meadowville Road Interchange, VA | $444,600 |
| 09VA006 | 2009 | Multi-use Recreational Trail at High Bridge State Park in Prince Edward County, VA | $222,300 |
| 09VA007 | 2009 | Preliminary Engineering for the Interstate 95/ US Route 17 Interchange Project, Spotsylvania County, VA | $88,920 |
| 09VA008 | 2009 | US 17/Dominion Blvd Widening (Cedar Rd to Great Bridge Blvd) and Drawbridge Replacement (over Atlantic Intercoastal Waterway), Chesapeake, VA | $222,300 |
| 09VA009 | 2009 | Vienna Sidewalk Construction, Vienna, VA | $222,300 |
| 12VA003 | 2012 | Luray Main Street Bridge Rehabilitation and Repair | $1,620,341 |
| 12VA005 | 2012 | Walk to Downtown Vienna Initiative | $800,000 |
| Total: (32 Projects) | $16,924,432 |
Washington
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 99WA02 | 1999 | Seattle, Central Puget Sound Region | $400,000 |
| 00WA02 | 2000 | Whatcom County: Chain of Trails | $126,000 |
| 00WA05 | 2000 | Clark County: Balancing Transportation Concurrency and Growth Management - Developing effective short-term strategies to implement long range transportation and land use plans | $380,000 |
| E1WA01 | 2001 | Grays Harbor: Satsop Development Park Road Improvements | $1,593,636 |
| E1WA02 | 2001 | Shoreline: SR 99 Corridor Improvements | $937,433 |
| E1WA03 | 2001 | Olympic Discovery Trail | $543,711 |
| E1WA04 | 2001 | Puget Sound Freight Mobility Systems Team Project | $18,749 |
| E2WA01 | 2002 | Clallam County Olympic Discovery Trail-Lake Crescent/Sol Duc River Bypass Segment | $1,586,092 |
| E2WA02 | 2002 | Everett Development Project Track Relocation | $3,667,837 |
| E2WA03 | 2002 | I-5/SR 432 Interchange Access | $991,307 |
| E2WA04 | 2002 | Grays Harbor Satsop Development Park Improvements | $1,486,961 |
| E2WA05 | 2002 | SR-520 Convening with Communities: Implementing Land Use and Other TDM Strategies in Two Intersecting Major Transportation Corridors | $991,307 |
| E2WA06 | 2002 | Tukwila Longacres Station Transit Oriented Development Project | $1,486,961 |
| TC03(001) | 2003 | Shoreline Interurban Trail | $400,000 |
| TC03(002) | 2003 | Tacoma Thea Foss Waterway Environmental Protection and Transportation Impact Study | $500,000 |
| TC03(003) | 2003 | Olympic Discovery Trail-Sequim to Blyn Segment | $1,000,000 |
| TC03(004) | 2003 | Central Avenue W/O Prospect | $250,000 |
| TC03(005) | 2003 | City of Aberdeen, Washington Downtown Revitalization | $100,000 |
| 04WA001 | 2004 | Bellingham Coast Millennium Trail--South Bay Taylor Dock Project | $470,209 |
| 05WA001 | 2005 | Henry M. Jackson Pedestrian and Bicycle Bridge and Snohomish River Shoreline Trail Project | $424,080 |
| 05WA002 | 2005 | US-2 Development Plan | $424,080 |
| 06WA001 | 2006 | Bridge for Kids, Carbon River Pedestrian Bridge | $645,975 |
| 06WA002 | 2006 | Historic District Streetscape and Transportation Improvements | $430,650 |
| 06WA003 | 2006 | Reconstruction of Main Street | $215,325 |
| 06WA004 | 2006 | Washington State Transit Car Sharing Job Access Project | $430,650 |
| 07WA001 | 2007 | SR 520 Innovative Storm Water Quality Protection | $2,000,000 |
| 07WA002 | 2007 | Congestion Reduction in the Lake Washington - Lake Washington Urban Partnership | $22,000,000 |
| 08WA001 | 2008 | Des Moines Creek Trail Access Project, WA | $451,290 |
| 08WA002 | 2008 | Olympic Discovery Trail/Elwha River Pedestrian Bridge, WA | $518,984 |
| 09WA001 | 2009 | A-B Street Corridor Connector Project, WA | $1,778,400 |
| 09WA002 | 2009 | Aurora Corridor Improvements - Phase 2, WA | $444,600 |
| 09WA003 | 2009 | Downtown Waterfront Redevelopment Access Project in Vancouver, WA | $222,300 |
| 09WA004 | 2009 | North Parkway Safety Improvement Project, WA | $444,600 |
| 09WA005 | 2009 | Puyallup Shaw Road Extension Project, Puyallup, WA | $222,300 |
| 09WA006 | 2009 | U.S. 101 Safety Improvements at Deer Park, WA | $871,416 |
| 09WA007 | 2009 | U.S. 12 Safety Improvements, WA | $2,667,600 |
| 09WA008 | 2009 | University Place Pedestrian Overpass, WA | $444,600 |
| 09WA009 | 2009 | Woodland Trail Project, WA | $444,600 |
| 10WA001 | 2010 | Beaudry Road Crossing and Pathway Project, WA | $551,217 |
| 10WA002 | 2010 | Fish Lake Trail Completion, WA | $1,837,390 |
| 10WA003 | 2010 | Hamilton Street Overpass Safety Project, WA | $918,694 |
| D10WA004 | 2010 | Bellevue ITS/Advance Traffic Management System | $360,000 |
| D10WA005 | 2010 | Puyallup Tribe Admin Building Safety Project | $269,219 |
| 11WA001 | 2011 | Downtown Tacoma Streetscape Project | $978,300 |
| 11WA012 | 2011 | South 200th Street Intermodal Station | $1,304,400 |
| 11WA026 | 2011 | Cushman Trail - Phase 3 | $652,200 |
| 11WA035 | 2011 | Joint Base Lewis-McChord (JBLM) / I-5 Congestion Relief Action Plan | $439,362 |
| 12WA003 | 2012 | Vancouver Waterfront Trail | $750,000 |
| 12WA005 | 2012 | Tacoma's T-13 Corridor for Active Transportation and Safety Project | $1,000,000 |
| Total: (49 Projects) | $61,072,435 |
West Virginia
| Project Number |
Fiscal Year |
Project Description |
Award Amount |
| 99WV01 | 1999 | Berkeley County, George Washington Heritage Trail | $300,000 |
| E0WV01 | 2000 | Putnam County: Rt. 35 Management Plan | $391,950 |
| E1WV01 | 2001 | Charleston: Kanawha Boulevard Walkway Project | $1,874,866 |
| E1WV02 | 2001 | Ellenboro and Harrisville: Route 16 Improvements | $234,358 |
| E1WV03 | 2001 | Wheeling: Victorian Village Transportation Initiative | $468,717 |
| E2WV01 | 2002 | Charles Town Streetscape Improvements & Welcome Center - Washington Corridor Revitalization Project | $396,523 |
| TC03(001) | 2003 | Railroad Bridge and Elkins Heritage Square Visitor Center Project | $600,000 |
| TC03(002) | 2003 | Charles Town Gateway Revitalization Project | $450,000 |
| TC03(003) | 2003 | Charleston Renaissance Gateway Project | $950,000 |
| 04WV001 | 2004 | Lewisburg Comprehensive Transportation Plan Lewisburg | $79,936 |
| 04WV002 | 2004 | Weston Streetscape Renewal | $188,084 |
| 06WV001 | 2006 | City of Parsons Streetscape Improvements | $1,309,176 |
| 06WV002 | 2006 | Martinsburg Roundhouse Center | $585,684 |
| 06WV003 | 2006 | Mason County Tourism Mural Project | $86,130 |
| 06WV004 | 2006 | Sidewalk Enhancement, Buckhannon | $43,065 |
| 08WV001 | 2008 | Fairmont Gateway Connector, WV | $1,353,870 |
| 08WV002 | 2008 | US Route 35, WV | $361,032 |
| 09WV001 | 2009 | Elkins Railyard Project, WV | $889,200 |
| 09WV002 | 2009 | Kanawha Trestle Rail-Trail Project, WV | $1,778,400 |
| 09WV003 | 2009 | Potomac Street Improvement, WV | $1,333,800 |
| 09WV004 | 2009 | Raleigh County Airport, WV | $978,120 |
| 09WV005 | 2009 | Slide Repair Work along US 60 in Eastern Kanawha County, WV | $4,446,000 |
| 09WV006 | 2009 | Tabler Station Business Park: Utilities, Transportation and Technology Infrastructure, WV | $311,220 |
| 09WV007 | 2009 | West Virginia Route 10, WV | $4,446,000 |
| 09WV008 | 2009 | West Virginia Route 9, WV | $6,224,400 |
| 10WV001 | 2010 | Monongalia Health Systems Access Road, WV | $918,694 |
| 10WV002 | 2010 | Wetzel Street Bridge Replacement, WV | $459,347 |
| D10WV003 | 2010 | West Virginia Bicycle Route System | $80,000 |
| 11WV005 | 2011 | Phase 1 Slack Plaza Multimodal Improvement | $652,200 |
| 12WV002 | 2012 | South Chestnut Street Slip Repairs and Widening and Realignment | $1,000,000 |
| Total: (30 Projects) | $33,190,772 |