QUALITY ASSURANCE CHECKLIST

The FHWA Risk Management Plan identifies the major risk areas in implementing the American Recovery and Reinvestment Act of 2009 (Recovery Act).  For the consideration of the Division Offices, example checklists have been developed for use in “visible monitoring” efforts.  The Quality Assurance Checklist provides inspection guidelines in regard to materials testing/acceptance and project inspection.

PROJECT DATA

Date  
Federal Project Number:  
State Project Number:  
Project Name/Route
Number, Section and Mileposts
 
County  
Project Description  
Percent Work Complete  
Percent Time Elapsed  
Original Contract Completion Date  
Current Contract Completion Date  
Award Amount  
Current Contract Estimate  

GENERAL REFERENCES

Regulations and Guidance
23 CFR 630 Subpart J - Work Zone Safety and Mobility
23 CFR 635.105 – Supervising Agency
23 CFR 637 - Construction Inspection and Approval
29 CFR 1926 – Safety and Health Regulations for Construction Construction Program Management and Inspection Guide
https://www.fhwa.dot.gov/construction/cpmi04tc.cfm
Questions and Answers on 23 CFR 637
https://www.fhwa.dot.gov/pavement/materials/qanda637.cfm
Federal-Aid Policy Guide, NS 23 CFR 637B, transmittal #36, published July 19, 2006.
https://www.fhwa.dot.gov/legsregs/directives/fapg/0637bsup.htm
Technical Advisory T 6120.3 Use of Contractor Test Results in the Acceptance Decision, Recommended Quality Measures, and the Identification of Contractor/Department Risks, published on August 9, 2004.
https://www.fhwa.dot.gov/legsregs/directives/techadvs/t61203.htm
Quality Assurance Stewardship Review - Summary Report for Fiscal Years 2003 through 2006
https://www.fhwa.dot.gov/pavement/materials/stewardreview2007.cfm

STAFFING

Reference Item Yes No N/A
635.105 Full time State Engineer in responsible charge of the construction work      
635.105 Staffing is adequate      
  Field staff has all equipment required to perform necessary inspections and materials tests      
637.209 Material testers are certified      
Comments:



WORKMANSHIP

Reference Item Yes No N/A
General
637.207 Quality control plan has been prepared for the project      
637.207 Contractor is undertaking processes included in approved QC plan      
637.209 Personnel performing inspection work are qualified per the approved qualification program, or otherwise suitably experienced to perform successfully      
637.207 State is conducting sampling and testing to verify contractor data as defined in the state quality assurance program.      
637.209 Testing to accept materials are conducted in a certified laboratory as required in the state's quality assurance program.      
         
Environmental
  Erosion and sediment control devices are installed properly and are well maintained      
  Contract specific environmental requirements are in compliance      
  Inspections are conducted in accordance with contract requirements      
  Environmental permits are available onsite      
         
Earthwork
  Fill placement complies with contract requirements      
  Compaction test results are satisfactory      
  Sampling and testing (frequency/location) are conducted in accordance with contract requirements      
Structures
  Pile Driving records are on file (including welder certifications and procedures)      
  Placement, tying, and cover of reinforcing steel comply with contract requirements      
  Bolt certifications are on file along with test results      
  Curing process complies with specifications      
  Sampling and testing (frequency/location) are conducted in accordance with contract requirements      
Asphalt
  Base is in good condition      
  Mix is delivered at proper temperature      
  Tacking complies with specifications      
  Mix is spread properly (thickness, crown, joints, uniform texture, continuous operation of paver)      
  Proper density is being obtained      
  Ride quality is in conformance with specifications      
  Sampling and testing (frequency/location) are conducted in accordance with contract requirements      
         
PCC
  Mix spread to correct thickness      
  Curing and tining applied in timely manner      
  Dowel baskets properly installed      
  Ride quality is in conformance with specifications      
  Sampling and testing (frequency/location) are conducted in accordance with contract requirements      
Work Zone
  Traffic control devices installed in accordance with Traffic Control Plan      
  Traffic control devices are clean and well maintained      
  Travel way is well delineated      
  Work zone inspections are completed in accordance with contract requirements      
Comments:



DOCUMENTATION AND RECORD KEEPING

Reference Item Yes No N/A
635.123 Project field records adequately maintained to quantities submitted for payment      
  Inspector Daily Reports and Project Diary adequately support work progress, time charges etc.      
  Contract change documentation is adequately maintained      
  Acceptance sampling and testing reports are on file      
  Materials sampling and testing conducted as required      
  Failed tests are documented with cross-references to re-tests      
  Materials Certifications are on file      
  Buy America requirements included on invoices and certifications for all iron and steel products      
  Approved mix designs are on file      
  Trial batch results are properly identified and acceptable      
Comments: