1 |
State Code |
Y |
Y |
2 |
Highway Agency District |
Y |
Y |
3 |
County (Parish) Code |
Y |
Y |
4 |
Place Code |
Y |
Y |
7 |
Facility Carried By Structure |
Y |
Y |
8 |
Structure Number |
Y |
Y |
9 |
Location |
Y |
Y |
10 |
Inventory Rte, Min Vert Clearance |
Y |
Y |
11 |
Kilometerpoint |
Y |
N |
12 |
Base Highway Network |
N |
N |
16 |
Latitude |
N |
N |
17 |
Longitude |
N |
N |
19 |
Bypass/Detour Length |
Y |
N |
20 |
Toll |
Y |
N |
21 |
Maintenance Responsibility |
Y |
N |
22 |
Owner |
Y |
Y |
26 |
Functional Class Of Inventory Rte. |
Y |
N |
27 |
Year Built |
Y |
N |
29 |
Average Daily Traffic |
Y |
N |
30 |
Year Of Average Daily Traffic |
Y |
N |
31 |
Design Load |
Y |
N |
32 |
Approach Roadway Width |
Y |
N |
33 |
Bridge Median |
Y |
N |
34 |
Skew |
Y |
N |
35 |
Structure Flared |
Y |
N |
37 |
Historical significance |
Y |
N |
38 |
Navigation Control |
Y |
N |
39 |
Navigation Vertical Clearance |
Y |
N |
40 |
Navigation Horizontal Clearance |
Y |
N |
41 |
Structure Open/Posted/Closed |
Y |
N |
45 |
Number Of Spans In Main Unit |
Y |
Y |
46 |
Number Of Approach Spans |
Y |
Y |
47 |
Inventory Rte Total Horz Clearance |
Y |
Y |
48 |
Length Of Maximum Span |
Y |
Y |
49 |
Structure Length |
Y |
Y |
51 |
Bridge Roadway Width Curb-To-Curb |
Y |
N |
52 |
Deck Width, Out-To-Out |
Y |
Y |
53 |
Min Vert Clear Over Bridge Roadway |
Y |
Y |
56 |
Min Lateral Underclear on Left |
Y |
Y |
58 |
Deck |
Y |
N |
59 |
Superstructure |
Y |
N |
60 |
Substructure |
Y |
N |
61 |
Channel/Channel Protection |
Y |
N |
62 |
Culverts |
Y |
N |
63 |
Method Used To Determine Operating Rating |
Y |
N |
64 |
Operating Rating |
Y |
N |
65 |
Method Used To Determine Inventory Rating |
Y |
N |
66 |
Inventory Rating |
Y |
N |
67 |
Structural Evaluation |
N |
N |
68 |
Deck Geometry |
N |
N |
69 |
Underclear, Vertical & Horizontal |
N |
N |
70 |
Bridge Posting |
Y |
N |
71 |
Waterway Adequacy |
Y |
N |
72 |
Approach Roadway Alignment |
Y |
N |
76 |
Length Of Structure Improvement |
N |
N |
90 |
Inspection Date |
Y |
N |
91 |
Designated Inspection Frequency |
Y |
N |
94 |
Bridge Improvement Cost |
N |
N |
95 |
Roadway Improvement Cost |
N |
N |
96 |
Total Project Cost |
N |
N |
97 |
Year Of Improvement Cost Estimate |
N |
N |
99 |
Border Bridge Structure Number |
N |
N |
100 |
STRAHNET Highway Designation |
Y |
N |
101 |
Parallel Structure Designation |
Y |
N |
102 |
Direction Of Traffic |
Y |
N |
103 |
Temporary Structure Designation |
N |
N |
104 |
Highway System Of Inventory Route |
Y |
N |
105 |
Federal Lands Highways |
Y |
N |
106 |
Year Reconstructed |
N |
N |
107 |
Deck Structure Type |
Y |
N |
109 |
Average Daily Truck Traffic |
N |
N |
110 |
Designated National Network |
Y |
N |
111 |
Pier/Abutment Protection |
N |
N |
112 |
NBIS Bridge Length |
Y |
N |
113 |
Scour Critical Bridges |
Y |
N |
114 |
Future Average Daily Traffuc |
Y |
N |
115 |
Year Of Future Avg Daily Traffic |
Y |
N |
116 |
Min Navig Vertical Clear Vertical Lift Br |
N |
N |
108A |
Type of Wearing Surface |
Y |
N |
108B |
Type of Membrane |
Y |
N |
108C |
Deck Protection |
Y |
N |
13A |
LRS Inventory Route (edit disabled) |
N |
N |
13B |
Subroute Number (edit disabled) |
N |
N |
28A |
Lanes On Structure |
Y |
Y |
28B |
Lanes Under Structure |
Y |
Y |
36A |
Bridge Railings |
Y |
N |
36B |
Transitions |
Y |
N |
36C |
Approach Guardrail |
Y |
N |
36D |
Approach Guardrail Ends |
Y |
N |
42A |
Type of Service On Bridge |
Y |
Y |
42B |
Type of Service Under Bridge |
Y |
Y |
43A |
Kind of Material/Design Main |
Y |
Y |
43B |
Type of Design/Construction Main |
Y |
Y |
44A |
Kind of Material/Design Approach |
Y |
Y |
44B |
Type of Design/Construction Approach |
Y |
Y |
50A |
Left Curb/Sidewalk Width |
Y |
N |
50B |
Right Curb/Sidewalk Width |
Y |
N |
54A |
Reference Feature |
Y |
Y |
54B |
Minimum Vertical Underclearance |
Y |
Y |
55A |
Reference Feature |
Y |
Y |
55B |
Minimum Lateral Underclearance |
Y |
Y |
5A |
Record Type |
Y |
Y |
5B |
Route Signing Prefix |
Y |
N |
5C |
Designated Level of Service |
Y |
N |
5D |
Route Number |
Y |
N |
5E |
Directional Suffix |
Y |
N |
6A |
Features Intersected |
Y |
Y |
6B |
Critical Facility Indicator |
N |
N |
75A |
Type of Work Proposed |
Y |
N |
75B |
Work Done By |
Y |
N |
92A |
Fracture Critical Details |
Y |
N |
92B |
Underwater Inspection |
Y |
N |
92C |
Other Special Inspection |
Y |
N |
93A |
Fracture Critical Details Date |
N |
N |
93B |
Underwater Inspection Date |
N |
N |
93C |
Other Special Inspection Date |
N |
N |
98A |
Neighboring State Code |
N |
N |
98B |
Percent Responsibility |
N |
N |