Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback
Highways for LIFE

Arrow Highways for LIFE Project Summary Reports for Grants Awarded in FY2006 – FY2013


Project Innovation Report
Arizona Demonstration Project: Reconstruction of SR 179 in Sedona Needs-Based Involvement Process Arizona_Reconstruction_of_SR 179_Final_06_28_2013.pdf
California Demonstration Project: Pavement Replacement Using a Precast Concrete Pavement System on I-15 in Ontario Precast Concrete Pavement System (PCPS) CA_Pavement Replacement Using a PCPS on I-15_Final_Report_June_2013.pdf
California Demonstration Project: Safety Improvements on Mountain Ranch Road in Calaveras County Safety Edge, Road Safety Audit CA_CalaverasCnty_MountainRanch.pdf
Colorado Demonstration Project: Pecos Street over I-70 Bridge Replacement Using SPMT Technology Self Propelled Modular Transport (SPMT), Construction Management General Contractor (CMGC), Roundabouts, HAWK signal Colorado I-70 Pecos Street Draft Report_12_4_2014_Final.pdf
District of Columbia Demonstration Project: Reconstruction of Eastern Avenue Bridge Over Kenilworth Avenue in Washington, DC Prefabricated Bridge Elements and Systems (PBES), No-Excuse bonus DC Final Report_August_2011.pdf
Florida Demonstration Project: Precast Concrete Pavement System on US 92 Precast Concrete Pavement System (PCPS) FL_US92 PCPS_Final_Report_Apr_10_2014.pdf
Georgia Demonstration Project: I-85 Interchange Design-Build Project Using Prefabricated Bridge Elements in West Point, GA Design-build contracting, roller-compacted concrete, prefabricated bridge components/connections GA_I-85 Interchange Design-Build_Final_June_2013.pdf
Georgia Demonstration Project: Pavement Replacement Using a Precast Concrete Pavement System along a Section of SR 11/Broad Street in Winder, Georgia Precast Concrete Pavement System (PCPS) GA PCPS - Final Report to FHWA 121114.pdf
Iowa Demonstration Project: Improvements to the 24th Street – I–29/80 Interchange in Council Bluffs Accelerated Bridge Construction (ABC)/Prefabricated Bridge Elements and Systems (PBES), Self-Consolidating Concrete IA_Final_November 2009.pdf
Iowa Demonstration Project: Massena IA-92 Bridge Replacement Project Accelerated Bridge Construction (ABC)/Lateral Bridge Slide, Precast concrete wingwalls Iowa Massena Route 92 ABC_Draft Report_10092014.pdf
Iowa Demonstration Project: Accelerated Bridge Construction on US 6 over Keg Creek Accelerated Bridge Construction (ABC)/Prefabricated Bridge Elements and Systems (PBES), ultra-high-performance concrete, self-consolidating concrete IA_KegCreekBridge_Final_Report_June_2013.pdf
Kansas Demonstration Project: Use of Smart Work Zone Technology During Construction of the I-35/Homestead Lane Interchange in Johnson County Kansas Smart work zone, Intelligent Transportation Systems Kansas HfL Final Report_12-18-14.pdf

Louisiana Demonstration Project: A Project to Improve Safety and Speed Construction on LA 511 (70th Street) in Shreveport

A+B bidding, Open graded friction course

LA_sr511_shreveport_report_508.pdf
Maine Demonstration Project: Reconstruction of Lamson and Boom Birch Bridges Accelerated Bridge Construction (ABC)/Prefabricated Bridge Elements and Systems (PBES) ME_Final_Jan 23 09.pdf
Maryland Demonstration Project: Bridge Replacements on MD 28 and MD 450, Frederick County and Anne Arundel County, Maryland MD 28 and MD 450 Bridge Replacement (2007) Accelerated Bridge Construction (ABC)/Prefabricated Bridge Elements and Systems (PBES), Alternative Contracting MD_Replacements on MD 28 and MD 450_Final_Report_June_2013.pdf
Maryland Demonstration Project: Baltimore-Washington Parkway/West Nursery Road Bridge Superstructure Replacement Using SPMTs Accelerated Bridge Construction (ABC)/Self Propelled Modular Transport (SPMT) MD_SPMT_West_Nursery_Rd_ Final Report_06_27_2013.pdf
Massachusetts Demonstration Project: Reconstruction of Fourteen Bridges (FAST-14) on I-93 in Medford Using Accelerated Bridge Construction Techniques Incentive/Disincentive clauses, Design-Build project management, Accelerated Bridge Construction (ABC)/Prefabricated Modular Steel Bridge Elements (PMSE) MA I-93 Fast-14 Final Report_10_09_2014.pdf
Michigan Demonstration Project: Performance Contracting for Construction on M-115 in Clare County, MI Performance Contracting MI_Final_Performance Contracting for Construction on M-115__June_2013.pdf
Minnesota Demonstration Project: Rapid Replacement of the Maryland Ave. Bridge over I-35E in St. Paul Accelerated Bridge Construction (ABC)/Self Propelled Modular Transport (SPMT), Full Lane Closure MN I35E_MarylandAve_SPMT Draft Report_Final.pdf
Minnesota Demonstration Project: Reconstruction of Trunk Highway 36 in North St. Paul Alternative Contracting MN_Reconstruction of Trunk Highway 36 in North St. Paul_Final_June 2013.pdf
Minnesota Demonstration Project: Accelerated Bridge Construction over Paleface River on TH53 using Prefabricated Elements Accelerated Bridge Construction (ABC)/Prefabricated Bridge Elements and Systems (PBES) MN_US53_Paleface_Bridge_Final_06_24_2013.pdf
Missouri Demonstration Project: Replacement of Three Bridges Using Hybrid-Composite Beam Technology Hybrid Composite Beams Missouri_HCB_ Revised_Final.pdf
Missouri Demonstration Project: The Use of High-Friction Surface Treatments on Missouri Highways High Friction Surface Treatment Missouri High Friction Report draft Final.pdf
Missouri Demonstration Project: Design-Build Procurement Process for Construction on I-29/35 (kcICON) in Kansas City, MO Design-Build, Base-Grouted Slurry-Displaced Drill Shafts, Precast, Prestressed Concrete Piles for Bridge Foundations MI_Final_Performance Contracting for Construction on M-115__June_2013.pdf
Montana Demonstration Project: Innovative Culvert Rehabilitation Using Trenchless Technologies Culvert Trenchless Technologies MT_Final_July 2009.pdf

New Hampshire Demonstration Project: Auburn-Candia Resurfacing Project

Warm Mix Asphalt, Safety Edge, High RAP Content, Asphalt-Rubber (AR) Wearing Surface Mixture, High-Polymer Modified Asphalt (HiMA) Wearing Surface, Smart Work Zone

NH_auburn-candia_resurfacing_project_tech_brief_508.pdf
New York Demonstration Project: Replacement of I-190 Bridges over Buffalo Avenue, Niagara Falls, NY ABC/PBES, Northeast Extreme Tee (NEXT) beam, iCONE, A+B NY I190 Bridges over Buffalo Avenue Project Final Report_3_27_2015.pdf
New York Demonstration Project: Improvements to the Winton Road/I-590 Interchange in Rochester Diverging Diamond Interchange NY 590 Winton Report - Final_06_18_2013.pdf
New York Demonstration Project: I-84 Bridge Over Dingle Ridge Road Replacement Using Superstructure Slide-In Technology Accelerated Bridge Construction (ABC)/Lateral Bridge Slide NY I-84 Final Report_10092014.pdf
North Dakota Demonstration Project: Whitetopping on U.S. 2 West of Rugby Whitetopping, full lane closure ND_Final_September 2010.pdf
Oklahoma Demonstration Project: Replacement of Bridge in Oklahoma Utilizing Accelerated Bridge Construction and Bridge Sliding Methodology Accelerated Bridge Construction (ABC)/Self Propelled Modular Transport (SPMT) Oklahoma SH51 Cottonwood Creek Report Draft Final.pdf
Oregon Demonstration Project: Alternate Project Delivery and Accelerated Bridge Construction on OR 38, Drain to Elkton Accelerated Bridge Construction (ABC)/Prefabricated Bridge Elements and Systems (PBES), Hydraulic sliding system OR_Rt38 ABC_Final_June_2013.pdf
Oregon Demonstration Project: Accelerated Bridge Construction over Burnt River on Old US30 using Prefabricated Elements and Ultra High Performance Concrete Accelerated Bridge Construction (ABC), Ultra High Performance Concrete (UHPC) OR_OldUS30_Burnt_River_Bridge_10082014.pdf
Rhode Island Demonstration Project: Replacement of Frenchtown Brook Bridge No. 435 Accelerated Bridge Construction (ABC)/Prefabricated Bridge Elements and Systems (PBES) RI_Frenchtown_Brook_Bridge_Final.pdf
South Carolina Demonstration Project: Black River Bridge Replacements on SC 377 in Williamsburg County A+B+C contract bidding with built-in no-excuse incentives, PBES with self-consolidating concrete SC_377_Final_Oct_2011.pdf
South Carolina Demonstration Project: Rapid Removal and Replacement of the SC 703 Ben Sawyer Bridge Over the Intracoastal Waterway in Charleston County Modular construction techniques, design-build, Accelerated Bridge Construction (ABC), Hydraulic sliding system SC_703_Final_Sept 2011.pdf
Tennessee Demonstration Project: AC Resurfacing of Four Locations in Tennessee Utilizing Intelligent Compaction Technology Intelligent Compaction Tennessee Intelligent Compaction HFL Draft Final.pdf
Utah Demonstration Project: Rapid Removal and Replacement of the 4500 South Bridge Over I-215 in Salt Lake City Accelerated Bridge Construction (ABC)/Self Propelled Modular Transport (SPMT), Construction Management General Contractor (CMGC) UT_4500 SOUTH BRIDGE OVER I-215_Final_June_2013.pdf
Utah Demonstration Project: Precast Concrete Pavement System on I-215 Precast Concrete Pavement System (PCPS) UT_I-215_PCPS_Final _June_2013.pdf
Utah Demonstration Project: Geosynthetic Reinforced Soil Integrated Bridge System on I-84 near Salt Lake City Geosynthetic Reinforced Soil Integrated Bridge System (GRS-IBS), Accelerated Bridge Construction (ABC)/Bridge Slide UT_I-84_GRS-IBS_ Revised_Final.pdf
Vermont Demonstration Project: Route 2 – East Montpelier Bridge Reconstruction Integral abutment bridges, high performance concrete VT_Rt2_Final_July 2011.pdf
Vermont Demonstration Project: Rehabilitation of Culverts in South Burlington and Colchester Culvert Trenchless Technologies VT_Rehabilitation_of_Culverts_Final_06_18_2013.pdf
Vermont Demonstration Project: Warm-Mix Asphalt Overlay and Rehabilitation of U.S. 4A and VT 30 Warm Mix Asphalt Vermont_Hfl_US4-VT30_June_2013.pdf
Virginia Demonstration Project: I-66 Concrete Pavement Replacement Using Precast Concrete Pavement Systems Precast Concrete Pavement System (PCPS) VA_I66_FINAL_wo appendices_June_2013.pdf
Virginia Demonstration Project: Rapid Removal and Replacement of U.S. 15/29 Bridge Over Broad Run Near Gainesville, VA Accelerated Bridge Construction (ABC)/Prefabricated Bridge Elements and Systems (PBES), Construction Management General Contractor (CMGC), self-consolidating concrete VA_US15-29_Final_August 2009.pdf
Virginia Demonstration Project: Pavement Rehabilitation Using Roller Compacted Concrete Pavement along a Section of Staffordboro Boulevard, Stafford, Virginia Roller Compacted Concrete (RCC) VA RCCP Project Draft Final.pdf
Wisconsin Demonstration Project: Multiple Bridge Reconstruction on WIS 25 Across the Mississippi River Open pile bents, High Performance Concrete, Precast Bridge Elements, and specially designed approach aprons WI_Reconstruction on WIS 25_Final_June_2013.pdf
Wyoming Demonstration Project: Wyoming Hwy 196 – Buffalo South/WMA Overlay Project Warm Mix Asphalt (WMA), Safety Edge Wyoming HfL Hwy 196 WMA and Safety Edge_10092014.pdf
Wyoming Demonstration Project: Diverging Diamond Interchange Project at College Drive Warm Mix Asphalt (WMA), Safety Edge WY College Drive DDI  Report_Final.pdf

Contact

Ewa Flom
Highways for LIFE
202-366-2169
Ewa.Flom@dot.gov

Updated: 08/03/2015
 

FHWA
United States Department of Transportation - Federal Highway Administration