FHWA Home / OIPD / Accelerating Innovation / Accelerated Innovation Deployment (AID) Demonstration / Bridge Monitoring Project

Ultra-High Performance Concrete Connections

Location Blackbird Station Road near Townsend, Delaware

Delaware Department of Transportation Accelerated Bridge Program logo

Award Recipient Delaware Department of Transportation
Innovation All precast elements (piles, abutments, beams); Ultra-High Performance Concrete (UHPC) in beam joints and as an overlay
Award Fiscal Year 2017
Project Aspect UHPC overlay
Description The Delaware Department of Transportation (DelDOT) will replace a structurally deficient bridge using Accelerated Bridge Construction techniques. The entire structure, which includes both the substructure and the superstructure, will be precast concrete components. Ultra-High Performance Concrete (UHPC) will be used for beam connections. Additionally, DelDOT will use UHPC as a riding surface overlay on top of the precast beams. The goal is to demonstrate that UHPC can be used as a viable overlay material to construct maintenance free and long lasting bridge decks.
Grant Award $ 257,950
Project Contact

Nicholas Dean
Project Engineer, Bridge Design
Delaware Department of Transportation
Dover Administration Building
(302) 760-2318
nicholas.dean@state.de.us


Contact

Fawn Thompson
Program Coordinator
(404) 562-3917
Fawn.Thompson@dot.gov