Increased Federal-share for Project-level Innovation


Innovative Project Delivery Methods (23 USC 120(c)(3))

Increased Federal-share up to 5% of the total project cost, not to exceed 100 percent
Q & A


State Route Location Innovation Approximate Additional Federal Share Amount
AR Hwy-10 Hwy-10 at I-430 Interchange (Little Rock, AR) Construction Manager/General Contractor $ 2,500,000
AZ I-40 Walnut Canyon – Twin Arrows Intelligent Compaction $ 470,514
AZ US-260 Thousand Trails (MP-211) to I-17 (MP-218) south of Cottonwood Construction Manager/General Contractor, Intelligent Compaction $ 3,000,000
AZ SR-264 Burnside to Fish Wash e-Construction $ 584,711
AZ SR-92 San Pedro River Bridge e-Construction $ 327,393
AZ I-40 West of Flagstaff, AZ: Devil Dog (MP 156.5) to Williams (MP 161.4), EB/WB Use of 3-D Machine Control PCC Paving $ 2,010,000
AZ I-40 I-40; Cataract Lake Rd to Parks TI (MP 162.39 to 179.00) East of Williams Increased in-place Asphalt density demo project $ 2,441,416
AZ I-17 I-17: Coconino County Line (MP 311) to I-40/1-17 JCT (MP 340), South of Flagstaff Increased in-place Asphalt density demo project $ 1,574,201
CT RT-8 Bridgeport, CT Design-Build, Accelerated Bridge Construction - Prefabricated Bridge Elements and Systems $ 2,047,443
GA SR-299 Over I-24 Self Propelled Modular Transport, Design-Build $ 410,000
IL TR-1028 Ring Rd over Jacksonville Branch Creek, Springfield Park District Accelerated Bridge Construction $ 84,277
IL US-54 US-54, Louisianna, Mo - Border Bridge Project Design-Build $ 1,250,000
KY KY-15 Perry Co. (MP 13.269- MP 14.512) Intelligent Compaction $ 2,068,600
KY US-68 Nicholas Co. (MP 0.0 - MP 6.0) Intelligent Compaction $ 1,025,390
KY LN 9008 Cumberland PKWY LN 9008 (MP 36.159- MP 43.02) Intelligent Compaction $ 230,670
KY I-75 Rockcastle I-75 (MP 64.5 - MP 69.00) Intelligent Compaction $ 1,705,912
KY I-75 Rockcastle I-75 Intelligent Compaction $ 761,185
KY I-75 Rockcastle Co. (MP 60.1 - MP 64.5) Intelligent Compaction $ 2,163,465
KY KY-2432 Clay Co. (MP .351 - MP 1.58) Intelligent Compaction $ 761,185
KY I-75 Rockcastle Co. (MP 55.745 - MP 60.1) Intelligent Compaction $ 1,897,948
MI I-94 Over Lapeer Rd Carbon Fiber Post Tensioning $ 1,158,988
MI US-127 Parnell Rd. to Henry Rd. 3D Modeling/Alternative Technical Concepts $ 1,029,196
MI I-75 Pinconning Rd. to Bay/Arenac CL Alternative Technical Concepts $ 731,042
MI US-131 Mecosta S. CL to 6 Mile Rd. 3D Modeling $ 460,491
MI M-50 Over I-96 Slide-in Bridge Construction/Construction Manager/General Contractor $ 254,269
MI US-131 Over 3 Mile Rd Slide-in Bridge Construction/Construction Manager/General Contractor $ 254,269
MI Keefer Highway Keefer Highway over Sebewa Creek Geosynthetic Reinforced Soil – Integrated Bridge System $ 25,227
MI I-75 University Drive over I-75 Diverging Diamond Interchange $ 1,302,050
MI US-127 From Muskegon River to North Innovative Contracting/3D Modeling $ 359,891
MI US-131 Under I-94BL & Stadium Drive (I-94BL) Prefabricated Bridge Elements and Systems $ 393,787
MI M-100 Over GTW RR, Potterville Slide-in Bridge Construction $ 484,956
MI I-96/US-23 Interchange I-96 /US-23 Interchange 3D Modeling $ 3,222,021
MI I-196 Mi-I-196 Southwest Region Use of Geosynthetically Reinforced Soil - Integrated Bridge System $ 229,761
MI MI-14 (old) MI-M-14 Metro Region SEMCOG Use of Geosynthetically Reinforced Soil - Integrated Bridge System $ 119,939
MI I-94 MI-I-94 Metro SEMCOG Use of a Network Arch Bridge $ 1,035,000
MI I-196 MI-I-196 Grand Region Use of full depth precast deck panels $ 304,158
MO US-54 Louisiana, MO Design-Build $ 1,160,625
MO I-435 I-435 from the Kansas State Line to I-49 in Jackson County Design-Build $ 3,521,250
MT N-7 Madison Str. Bridge Rehab - Missoula Urban Bridge Rehab $ 403,324
MT N-29 Harrison Avenue - South 3/8" plant mix $ 247,561
MT U-8105 Russell Street - Missoula Corrosion Resistant Reinforcement, Modified Spill Curb, Raised Bike Lanes, Bus Stop Pullouts $ 464,577
MT P-86 Rouse Ave. Oak to Story Mill Rouse Ave. Main to Oak - Bozeman Hydrodynamic Oil/Water/Sediment Separator $ 286,593
MT N-8 Toston-Structures Pile Testing during Design $ 1,856,240
MT S-314 Reservation Line - South Flowable fill in Transverse Cracks $ 125,060
MT N-1 Lohman - E&W Geogrid/CAC $ 1,488,350
MT P-59, N-37, N-4, I-15 Mission Interchange - North, East of Ashland - East, Rockvale - Laurel, Emerson Jct - Manchester Collection of photogrammetric survey data and earthwork volume via Unmanned Aerial System (UAS) and UltraCam Eagle $ 400,120
MT I-94 East of Glendive - East Compaction Grouting, Cured-in-Place Pipe, Jack and Bore $ 668,592
MT N-37 East of Ashland-East Collection of photogrammetric survey data and earthwork volume via Unmanned Aerial System (UAS) and UltraCam Eagle $ 837,858
MT N-4 Rockvale-Laurel (2 Lanes) Collection of photogrammetric survey data and earthwork volume via Unmanned Aerial System (UAS) and UltraCam Eagle $ 972,589
MT N-20 Sidney to Fairview Collection of photogrammetric survey data and earthwork volume via Unmanned Aerial System (UAS) and UltraCam Eagle $ 144,859
MT I-90 Exit 5 - East High Float Emulsions $ 85,737
MT U-7112 Casino Creek Drive (Lewistown) Texas Underseal $ 17,595
MT U-7105 1st St - 7th Ave (Lewistown) Texas Underseal $ 43,369
MT I-90 West Laurel Interchange - West Unmanned Arial System, Advanced Photogrammetry Camera $ 818,739
MT I-90 Pipestone - Whitehall Unmanned Arial System, Advanced Photogrammetry Camera $ 132,806
MT N-55 Whitehall - South Unmanned Arial System, Advanced Photogrammetry Camera $ 433,563
MT U-1029 6th Ave N -27th to 32nd Billings Fiber reinforced Plant Mix Surfacing $ 31,727
MT U-1017  Division Street - Billings Fiber reinforced Plant Mix Surfacing $ 38,722
MT S-284 Canyon Ferry Dam - SE Texas Underseal with Scrub Seal Technology $ 62,814
MT Various Locations D1 Slope Stability (Phase 2) Design-Build contracting method for a Slope Stabilization project $ 713,235
MT I-15 Helena N & S Fog Seal over Chip Seal $ 85,737
MT NH-1 S FK Flathead - Hungry Horse Thermal Integrity Testing $ 460,030
MT N-8 MacDonald Pass - East Fog Seal over Chip Seal $ 39,185
MT I-15 Helena North Hill - Sieben Int Fog Seal over Chip Seal $ 39,516
MT S-209 Swan River - 5 M E Big Fork Three-dimensional (3D) Modeling. Data, Exported from 3 D models. $ 196,668
MT N-85 Belgrade - South Three-dimensional (3D) Modeling. Data, Exported from 3 D models. $ 508,876
MT U-5220 Fox Farm Rd - Great Falls Three-dimensional (3D) Modeling. Data, Exported from 3 D models. $ 200,100
MT P-17 Milk River - North Three-dimensional (3D) Modeling. Data, Exported from 3 D models. $ 565,150
MT I-90 Bridges-Bonner Design-Build for Bridge Replacement $ 1,133,098
MT U-8105 Russell Street - Broadway to Idaho Corrosion Resistant Reinforcement, Modified Spill Curb, Raised Bike Lanes, Bus Stop Pullouts $ 843,528
RI RI-12 Cranston, RI Construction Manager/General Contractor $ 1,000,000
RI RI-102 Coventry, RI Warm Mix Asphalt & Intelligent Compaction $ 1,000,000
RI Airport Road Warwick, RI Adaptive Signal Control $ 996,000
RI Barbs Hill Rd & Railroad Ave Coventry, RI & Burrillville, RI Innovative Arch $ 480,000
TN I-40 Davidson County
Jefferson St. Bridge
Accelerated Bridge Construction & Construction Manager/General Contractor $ 3,285,249
TN I-240 Memphis Construction Manager/General Contractor $ 3,142,500
TX SH-71 SH-71 from Presidential Blvd. to East of SH-130 Design-Build $ 2,706,750
TX FM-973 FM-973 from Colorado River to 0.5 mi. south of SH-71 Design-Build $ 343,250
TX SH-183 SH-183 FROM FM-157 TO I-35 E; LP-12 FROM SH-183 TO I-35 E; AND SH-114 FROM SH-97 TO SH-183 Design-Build $ 35,634,952
TX US-181 from N. of the Corpus Christi ship channel to S. of the Corpus Christi ship channel. Design-Build $ 40,688,929
VT I-91 Hartford, VT Slide-in Bridge Construction $ 401,869
VT VT-100 Waitsfield, VT Accelerated Bridge Replacement using Ultra-High Performance Concrete $ 238,345
VT I-89 Georgia, VT New tunneling technology $ 475,399
VT VT-302 Berlin, VT Road Diet $ 140,581
VT Merchant's Row, Main Street Middlebury, VT Direction drilling, Construction Manager/General Contractor, Tunnel, soldier piles, railroad $ 90,000
VT VT-103 Ludlow, VT Ultra-High Performance Concrete with PBUs $ 247,149
VT VT-17  Webridge, VT/ New Haven, VT Cast-in-place concrete performance specification $ 200,886
VT US-2 North Hero, VT/ Grand Isle, VT Use of bridge management system for design and construction $ 3,250,000
WI I-43 Manitowoc County Traffic Queue Warning System N/A
Page last modified on February 8, 2018