Skip to content U.S. Department of Transportation/Federal Highway AdministrationU.S. Department of Transportation/Federal Highway Administration
Office of Planning, Environment, & Realty (HEP)

Coordinated Border Infrastructure Program


The Fiscal Year 2001 National Corridor Planning and Development Program and Coordinated Border Infrastructure Program grant recipients are the following: 

*-- indicates congressional earmarks

Alabama *US 43, Alabama   $3,516,000
Alabama *Anniston Evacuation corridor, Calhoun County, Alabama   $2,637,000
Alaska *Hatcher Pass (phase 1), Alaska   $1,758,000
Arizona Infrastructure improvements to property purchased for Commercial Vehicle Inspections at the Nogales POE.   $750,000
Arizona   ITS-CVO processing for international crossing system in Nogales POE.  $800,000
Arkansas ( w/ IN, KY, LA, MS, TN, TX)      Environmental and Location studies for future I-69 from Sarnia and  Windsor, Ontario Canada to Laredo and the Lower Rio Grande Valley (US/Mexico Border)


California Project development, ROW acquisition  and construction of grade separation projects in the Alameda Corridor East from E. Los Angeles to Pomona  along UP/SP RR line $2,400,000
California Preliminary Engineering and design for realignment of I-5 and I-805 from San Ysidro POE to Virginia Ave in San Diego metropolitan area  $2,000,000
California Environmental study, design, and ROW acquisition along SR 905 Freeway to the Otay Mesa Port of Entry  $4,100,000
California *Avalon Boulevard/405 Freeway Interchange, Carson, California   $769,125
Colorado *I-25 Corridor from Alameda to Logan, Colorado   $3,516,000
Connecticut Final design phase for replacement of the I-95 Pearl Harbor Memorial Bridge in New Haven  $1,500,000
Florida *Traffic calming, Boca Raton, Florida   $439,500
Florida *US 19, Florida   $8,790,000
GSA At Sault St. Marie, MI POE, construction of a corridor for the separation of commercial and non-commercial traffic at the approach  $1,990,000
GSA At Columbia, Laredo TX POE construction of a 3rd lane for truck processing.  Lane will separate full and empty trucks prior to inspection $308,000
GSA At bridge of the Americas, EL Paso, TX POE, construct new headhouse and 4 additional primary inspection lanes and booths.   $1,500,000
GSA At Pharr, TX POE construction of 25 inspection bays with canopy.   $1,500,000
Idaho *US 95 (Milepost 522 to Canadian border), Idaho   $1,670,100
Illinois *New Boston Road improvements, Mercer County, Illinois   $2,637,000
Illinois *I-74 bridge, Moline, Illinois   $4,922,400
Illinois *US 51 widening, Decatur, Illinois   $1,186,650
Illinois *Stevenson expressway, Illinois   $3,340,200
Illinois PE for Central Ave. to Narragansett Ave. connector, a new 4-lane highway near Midway Airport and the CSX Bedford Park intermodal yards in Cook county $3,000,000
Indiana *South Shore industrial safety overpass, Indiana   $4,175,250
Indiana *I-65 Upgrade, Clark County, Indiana   $1,186,650
Kentucky *Madison County, KY 21 and I-75, Kentucky   $879,000
Kentucky *I-66, Somerset to London, Kentucky   $4,395,000
Kentucky *US 25 improvements, Kentucky   $1,758,000
Louisiana *I-69, Louisiana   $2,021,700
Massachusetts *Downtown Fitchburg Route 12 extension, Massachusetts   $1,758,000
Michigan Detroit - Windsor International Bridge Study: Feasibility Study & Environmental Clearance $3,000,000
Missouri *US 61 (Avenue of the Saints), Missouri   $3,516,000
New Hampshire (w/ ME & VT) *US Route 2, New Hampshire   $1,318,500
New York   Design and ROW acquisition for new freeway (future I-99) from PA border north for 12 miles.  $3,000,000
New York   Installation of canopy, inspection booths, signal and WIM at Ogdensburg-Prescott Intl Crossing  $300,000
North Carolina * US 321 and US 74, Gasden and Mecklenburg County, North Carolina   $439,500
Ohio *City of North Ridgeville, Lorain County, Ohio, grade crossing $527,400
Oregon *I-5 South Medford interchange and Delta Park, Oregon   $879,000
South Dakota   *I-29 Port of Entry, Union County, South Dakota   $1,758,000
South Dakota   Construction of Phase I of the Southeast Connector route in Rapid City, SD including a new interchange at Elk Vale Rd and SD-44 and four-lane reconstruction of Elk Vale Rd from South of SD-44 north to near I-90 $3,000,000
Texas Acquire ROW for Border safety inspection facilities and related work (Laredo, Eagle Pass, El Paso, Brownsville, Pharr-Reynosa, Los Indios-Lucia Blanco) $1,400,000
Texas *Radio Road overpass, City of Sulpher Springs, Texas $1,186,650
Texas *I-69 corridor, Texas   $2,637,000
Texas Reconstruction of Mile 2 W in Hidalgo County   $1,200,000
Texas Improvement Plan and related work for six POEs in El Paso area (including part of New Mexico) 


Texas  * I-35 corridor expansion, Waco, Texas   $1,164,675
Utah Corridor planning for I-15 in Utah County   $400,000
Virginia *Coalfields expressway, VA   $3,516,000
Virginia *Route 104, Virginia   $879,000
Washington State  * US 395 North Spokane corridor, Washington   $879,000
West Virginia * Coalfields expressway, West Virginia   $8,790,000
Wisconsin *WI 29 (Chippewa Falls bypass, Wisconsin)   $2,637,000
Wisconsin ROW acquisition, construction of roadway and structures, widening and realignment of US 10 between Fremont and US 45 including US 10/45 improvements $4,000,000



Updated: 10/20/2015
HEP Home Planning Environment Real Estate
Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000