Office of Highway Policy Information (OHPI) – Highway Performance Monitoring System (HPMS) – Toll Facilities in the United States
TABLE T-1, PART 4
State Name of Facility HPMS
Toll ID
Financing or Operating Authority From To Length 1/ Functional Classification 2/ Rural/Urban NHS
3/
Toll Collection Electronic Toll Collection System? 4/ Non-Toll Miles Remarks Authority Source Toll Type Maximum Pass. Fee Minimum Pass. Fee Average Passenger Vehicle Cost per Vehicle-Mile Maximum Truck Fee Minimum Truck Fee Average Truck Cost per Vehicle-Mile
Miles Kilometers One-Way
(N,S,E,W)
Both Ways No Yes/Kind
Alabama Foley Beach Express 4 Alinda Roads, LLC AL 59 (in Foley) AL 180 (in Orange Beach) 8.53 13.73 Minor Arterial Rural     X   Infrared 5.429 Private - Trucks +$1.00 per axle   Fixed: rate based on axle/weight/price based on distance traveled $3.50 $1.50 $0.18 $2.50 $2.50 $3.50
California Seventeen Mile Drive 17 Pebble Beach Company Pacific Grove Carmel 10.80 17.38 local Urban X     X     Private: Length is 17.3 Mi if complete circuit is made via Sloat Rd-Lopez Rd-Sunridge Rd-Constanilla Way-Los Altos Dr & Scenic Dr   Fixed: rate based on axle/weight/price based on distance traveled $9.50 $9.50        
California Route 91 Express Lanes 18 Orange County Transportation Authority Orange/Riverside County Line Highway 55 10.00 16.09 Principal Arterial - Other Freeways and Expressways Urban X   X   FASTRAK/Title 21/Tiris   Project developed under Assembly Bill 680 (1989) private partnership law. Utilizes DBOM. Facility opened in 1995.   Fixed variable: rate based on time of day $10.25 $1.30 $0.28 $0.00 $0.00 $0.00
California Eastern Trans. Corridor (Routes 261, 241, & 133) 19 CA Department of Trans; Orange County Trans Corridor Agencies State Route 91 I-5 & State Route 133 24.00 38.62 Principal Arterial - Other Freeways and Expressways Urban X   X   FASTRAK/Title 21/Tiris   Construction completed Feb. 1999.   Fixed variable: rate based on time of day            
California Foothill Trans. Corridor (Route 241) 20 CA Department of Trans; Trans Corridor Agencies I-5 San Clemente State Route 241; Eastern Corridor 28.00 45.06 Principal Arterial - Other Freeways and Expressways Urban X   X   FASTRAK/Title 21/Tiris   Construction completed Jan. 1999. Toll type also based on axels. Details for revenue & traffic by truck not readily available. Avg. cost per mile calculated includes trucks and passenger vehicles. Section 129 Toll Agreement Fixed variable: rate based on time of day $2.50 $0.25 $33.32 $10.00 $0.25 $33.32
California San Joaquin Hills Trans Corridor (Route 73) 21 CA Department of Trans; Trans Corridor Agencies Newport Beach San Juan Capistrano 15.00 24.14 Principal Arterial - Other Freeways and Expressways Urban X   X   FASTRAK/Title 21/Tiris   Construction completed Nov 21. 1996. Toll type also based on axels. Details for revenue & traffic are not readily avail. though vehicle traffic accounts for 99% of overall traffic. Calculated cost per mile includes truck revenue. Section 129 Toll Agreement Fixed variable: rate based on time of day $4.75 $0.50 $41.70 $19.00 $0.50 $41.70
California Route 125 23 California Transportation Ventures, Inc. State Route 905 State Route 54 10.00 16.09 Principal Arterial - Other Freeways and Expressways Urban     X   FASTRAK/Title 21/Tiris   Project developed under Assembly Bill 680 (1989) private partnership law. Utilizes DBOM. Facility opened in 2007. Section 129 Toll Agreement Fixed: rate based on axle/weight/price based on distance traveled $3.85 $0.85   $7.70 $1.70  
Colorado Northwest Parkway 25 Northwest Parkway Public Highway Authority I-25, MP 228 in North Denver 96th Street (in City of Broomfield) 11.00 17.70 Principal Arterial - Other Freeways and Expressways Urban     X   EXpress Toll - AVI   Opened Nov. 24, 2003; On August 30, 2007, the Parkway Authority signed a $603 million, 99 year concession agreement with Portugal based Brisa. Passenger vehicle rate is $3 for 11 mile trip. Each additional axle is $3 Express Lanes Demo Program Fixed: rate based on axle/weight/price based on distance traveled $3.55 $1.05 $0.29 $13.60 $1.05 $1.23
Colorado E-470 26 E-470 Public Highway Authority I-25 & C-470; Douglas County I-25 & Northwest Parkway; Adams County 47.00 75.64 Principal Arterial - Other Freeways and Expressways Urban X   X   EXpress Toll and Automatic Vehicle ID(AVI)   Pass Veh toll rate is $11 for 46.10 mile trip. Each additional axle is $11   Fixed: rate based on axle/weight/price based on distance traveled $15.95 $1.30 $0.24 $63.80 $1.30 $1.35
Colorado Pikes Peak Toll Road 299 City of Colorado Springs operates under a Term Special Use Permit issued by the US Forest Service Town of Cascade, US 24 west of Colorado Springs Top of Pikes Peak Mountain -14, 110' elevation 19.00 30.58 local Rural   W   X     Road (39 miles) is owned by the Forest Service but operated by the City of Colorado Springs, which received a special use permit in the late 1940's to turn it into a toll road. Toll is fixed $10 per person, $5 for kids, $40 max fee per vehicle.     $40.00 $10.00 $0.39 $40.00 $10.00 $0.39
Delaware SR -1 29 DE Dept of Trans Old Lebanon Road (Rd. 357) Dyke Branch Road (Rd. 331) 7.74 12.46 Principal Arterial - Other Freeways and Expressways Urban X   X   E-ZPass                    
Delaware SR -1 29 DE Dept of Trans Dyke Branch Road (Rd. 331) Smyrna Toll (Rd. 150-B) 5.85 9.41 Principal Arterial - Other Rural X   X   E-ZPass                    
Delaware SR -1 29 DE Dept of Trans Smyrna Toll (Rd. 150-B) North Smyrna Urban Limit 2.72 4.38 Principal Arterial - Other Freeways and Expressways Urban X   X   E-ZPass                    
Delaware SR -1 29 DE Dept of Trans North Smyrna Urban Limit C&D Canal Bridge 18.51 29.79 Principal Arterial - Other Rural X   X   E-ZPass                    
Delaware SR -1 29 DE Dept of Trans C&D Canal Bridge Tybouts Corner 4.38 7.05 Principal Arterial - Other Freeways and Expressways Urban X     X   4.38 Non-toll Section                
Delaware SR -1 29 DE Dept of Trans Tybouts Corner US 13 North of Tybouts Corner 0.81 1.30 Principal Arterial - Other Rural X     X   0.81 Non-toll Section                
Delaware SR -1 29 DE Dept of Trans US 13 North of Tybouts Corner I-95 4.81 7.74 Principal Arterial - Other Rural X     X   4.81 Non-toll Section                
Florida Beachline East (Central Florida Expressway) 47 FL Dept of Transportation SR 520 US 1 at Cocoa 15.00 24.14 Principal Arterial - Other Freeways and Expressways Rural/Urban X   X   SunPass, EPass, LeeWay   The AADT for these facilities was calculated using a weighted average for the entire corridor Section 129 agreement Fixed: rate based on axle/weight/price based on distance traveled $1.25 $0.25 $0.03 $1.50 $0.25 $0.01
Florida Beachline East (Central Florida Expressway) 47 FL Dept of Transportation SR 528 SR 405 6.80 10.94 Principal Arterial - Other Freeways and Expressways Rural/Urban       X   6.80 Non-toll Section Section 129 agreement   N/A N/A N/A N/A N/A N/A
Florida Beachline Expressway 48 Orlando-Orange Cnty Expway Auth (& FL Dept of Trans) Boggy Creek Road SR 520 22.46 36.15 Principal Arterial - Other Freeways and Expressways Rural/Urban X   X   SunPass, EPass, OPass, LeeWay   The AADT for these facilities was calculated using a weighted average for the entire corridor   Fixed: rate based on axle/weight/price based on distance traveled $2.50 $1.00 $0.13 $6.50 $1.25 $0.19
Florida Beachline West 49 FL Turnpike Enterprise I-4 (SR 400) Boggy Creek Road (SR 528A) 8.42 13.55 Principal Arterial - Other Freeways and Expressways Urban X   X   SunPass, EPass, OPass, LeeWay     Section 129 agreement Fixed: rate based on axle/weight/price based on distance traveled $1.00 $0.75 $0.07 $5.00 $1.50 $0.22
Florida Homestead Extension of Florida Turnpike (HEFT) 50 FL Turnpike Enterprise FL Trnpke MP 47 in Mirahar US 1 in FL City 47.90 77.09 Principal Arterial - Other Freeways and Expressways Urban X   X   SunPass, EPass, OPass, LeeWay     Section 129 agreement Fixed: rate based on axle/weight/price based on distance traveled $4.75 $3.75 $0.20 $23.75 $7.50 $0.20
Florida Holland East-West Expressway 53 Orlando-Orange Cnty Expway Auth (& FL Dept of Trans) FL Trnpke (SR 50 West) SR 50 East Colonial Drive 22.36 35.98 Principal Arterial - Other Freeways and Expressways Urban X   X   SunPass, EPass, OPass, LeeWay   The AADT for these facilities was calculated using a weighted average for the entire corridor   Fixed: rate based on axle/weight/price based on distance traveled $3.50 $0.25 $0.19 $9.00 $0.25 $0.37
Florida Sawgrass Expressway (SR 869) 54 FL Turnpike Enterprise FL Trnpke MP 71 I-75 / 595 21.66 34.86 Principal Arterial - Other Freeways and Expressways Urban X   X   SunPass, EPass, OPass, LeeWay     Section 129 agreement Fixed: rate based on axle/weight/price based on distance traveled $2.50 $2.00 $0.09 $12.50 $4.00 $0.27
Florida Central Florida Greenway (SR-417) 58 Orlando-Orange Cnty Expway Auth Seminole/Orange Cnty Line International Drive 33.40 53.75 Principal Arterial - Other Freeways and Expressways Urban X   X   SunPass, EPass, OPass, LeeWay   The AADT for these facilities was calculated using a weighted average for the entire corridor   Fixed: rate based on axle/weight/price based on distance traveled $4.00 $0.50 $0.14 $10.00 $0.50 $0.27
Florida Daniel Webster - Western Beltway Part C 59 Orlando-Orange Cnty Expway Auth US 441 (Orange Blossom Tr) Seidel Rd 22.02 35.44 Principal Arterial - Other Freeways and Expressways Urban X   X   SunPass, EPass, OPass, LeeWay   The AADT for these facilities was calculated using a weighted average for the entire corridor   Fixed: rate based on axle/weight/price based on distance traveled $2.50 $0.25 $0.17 $5.50 $0.25 $0.13
Florida Osceola Parkway 60 Osceola Cnty, FL Florida Turnpike I-4 Interchange 12.40 19.96 Principal Arterial - Other Freeways and Expressways Urban X   X   SunPass, EPass, OPass, LeeWay 2.8 As of 6/1/2013, the collection methods to produce the vehicle cost-per-mile were not available. Therefore, in order t calculate the information, the AADT just west of the toll plaza was multiplied by the 2-axle toll-rate of $1.75   Fixed: rate based on axle/weight/price based on distance traveled $1.75 $0.75 $0.06 $8.75 $0.75 $0.84
Florida Polk Parkway (SR 570) 64 FL Turnpike Enterprise I-4 near Clark Rd extending E to SR 540 N to I-4 near Mt. Olive Rd 24.38 39.24 Principal Arterial - Other Freeways and Expressways Rural/Urban X   X   SunPass, EPass, OPass, LeeWay     Section 129 agreement Fixed: rate based on axle/weight/price based on distance traveled $3.75 $3.00 $0.13 $18.75 $6.00 $0.42
Florida John Land - Apopka Expressway (SR 414) 303 Orlando-Orange Cnty Expway Auth SR 429 (Western Beltway) US 441 South 5.00 8.05 Principal Arterial - Other Freeways and Expressways Urban X   X   SunPass, EPass, OPass, LeeWay   The AADT for these facilities was calculated using a weighted average for the entire corridor   Fixed: rate based on axle/weight/price based on distance traveled $1.00 $0.25 $0.23 $2.50 $0.25 $0.44
Florida East-West (Dolphin) Expressway 45 Miami-Dade Expway Auth (MDX) I - 95 & I - 395 HEFT 13.98 22.50 Principal Arterial - Other Freeways and Expressways Urban X W     SunPass, EPass, OPass, LeeWay     Section 129 agreement Fixed: rate based on axle/weight/price based on distance traveled $1.00 $0.25 $0.05 $5.00 $0.50 $0.15
Florida Florida Turnpike - Mainline 46 FL Turnpike Enterprise Miami Wildwood 266.00 428.09 Principal Arterial - Other Rural X   X   SunPass, EPass, OPass, LeeWay     Section 129 agreement Fixed: rate based on axle/weight/price based on distance traveled $26.90 $21.10 $0.06 $103.70 $46.10 $0.19
Florida South Dade (Don Shula) Expressway 51 Miami-Dade Expway Auth (MDX) HEFT Palmetto Expway 7.16 11.52 Principal Arterial - Other Freeways and Expressways Urban X   X   SunPass, EPass, OPass, LeeWay     Section 129 agreement Fixed: rate based on axle/weight/price based on distance traveled $0.65 $0.25 $0.04 $2.60 $0.50 $0.10
Florida Lee Roy Selmon Crosstown Expressway 52 Tampa-Hillsborough Cnty Expwy Auth (FL Dept of Trans) Gandy Boulevard To I-75 14.17 22.80 Principal Arterial - Other Freeways and Expressways Urban X   X   SunPass, EPass, OPass, LeeWay 0.6   Section 129 agreement Fixed: rate based on axle/weight/price based on distance traveled $1.75 $0.50 $0.09 $24.50 $1.00 $0.24
Florida Miami Airport Expressway 55 Miami-Dade Expway Auth (MDX) I-95 Lejeune Rd (SR 953) 4.07 6.55 Principal Arterial - Other Freeways and Expressways Urban X W     SunPass, EPass, OPass, LeeWay     Section 129 agreement Fixed: rate based on axle/weight/price based on distance traveled $1.25 $1.00 $0.26 $5.00 $2.00 $1.08
Florida Veterans Expressway (SR 589) 56 FL Turnpike Enterprise Courtney Campbell Causeway (SR 60) North Dale Mabry 12.22 19.67 Principal Arterial - Other Freeways and Expressways Rural/Urban X   X   SunPass, EPass, OPass, LeeWay     Section 129 agreement Fixed: rate based on axle/weight/price based on distance traveled $2.25 $1.75 $0.12 $11.25 $3.50 $0.35
Florida Seminole Expressway 57 FL Turnpike Enterprise Northern Terminus of Eastern Beltway (SR 426-Aloma Ave) I-4 West of US 192 17.45 28.08 Principal Arterial - Other Freeways and Expressways Urban X   X   SunPass, EPass, OPass, LeeWay     Section 129 agreement Fixed: rate based on axle/weight/price based on distance traveled $2.25 $2.00 $0.12 $11.25 $4.00 $0.36
Florida Southern Connector Extension 61 FL Turnpike Enterprise Central FL Greeneway I-4 West of US 192 5.10 8.21 Principal Arterial - Other Freeways and Expressways Urban X   X   SunPass, EPass, OPass, LeeWay     Section 129 agreement Fixed: rate based on axle/weight/price based on distance traveled $1.00 $0.75 $0.10 $5.00 $1.50 $0.32
Florida Gratigny Parkway 62 Miami-Dade Expway Auth (MDX) Palmetto Expway Northwest 119 Street at 27th Ave 5.37 8.64 Principal Arterial - Other Freeways and Expressways Urban X   X   SunPass, EPass, OPass, LeeWay     Section 129 agreement Fixed: rate based on axle/weight/price based on distance traveled $0.65 $0.50 $0.08 $2.60 $1.00 $0.24
Florida Snapper Creek Expressway 315 Miami-Dade Expway Auth (MDX) US1 SR 874 3.01 4.84 Principal Arterial - Other Freeways and Expressways Urban X X   SunPass, EPass, OPass, LeeWay     Section 129 agreement Fixed: rate based on axle/weight/price based on distance traveled $0.40 $0.25 $0.08 $1.60 $0.50 $0.11
Florida Suncoast Parkway (SR 589) 63 FL Turnpike Enterprise Veterans near Van Dyke Rd (Hillsborogh Cnty) US 96 (Hernando Cnty) 41.43 66.68 Principal Arterial - Other Rural X   X   SunPass, EPass, OPass, LeeWay     Section 129 agreement Fixed: rate based on axle/weight/price based on distance traveled $3.75 $3.00 $0.08 $18.75 $6.00 $0.22
Florida Goldenrod Road Extension 301 Orlando-Orange Cnty Expway Auth (& FL Dept of Trans) Orlando International Airport SR 551 2.70 4.35 Minor Arterial Urban     X   SunPass, EPass, OPass, LeeWay 1.4 Road will become non-tolled and given to the city of Orlando when the tolls pay the bonds used for construction.   Fixed: rate based on axle/weight/price based on distance traveled $0.50 $0.50 $0.19 $0.50 $0.50 $0.19
Georgia Georgia 400 Extension 67 GA Dept of Trans; GA Tollway Auth I-285 I-85 6.20 9.98 Principal Arterial - Other Freeways and Expressways Urban X   X   High Speed Automatic Vehicle ID (AVI)                    
Illinois East-West Tollway (SR-56 Connector) 77 IL State Hwy Toll Auth I-88 SR 56 0.40 0.64 Principal Arterial - Other Urban X   X X                      
Louisiana Avery Island 89 Avery Island, Inc. SR 329 Junction Avery Island 1.50 2.41 Minor Arterial Rural       X     Private                
Maine Maine Turnpike (I-295) 90 ME Trnpke Auth South Portland South Portland 0.40 0.64 Principal Arterial - Other Urban X   X   E-ZPass                    
Maryland Intercounty Connector (ICC) (MD 200) 99 MD Transportation Authority (MDTA) I-370 I-95/US 1 18.00 28.97 Principal Arterial - Other Freeways and Expressways Urban     X   E-ZPass   Under construction, only open from I-307 to MD 97. Section 129 Toll Agreement Fixed variable: rate based on time of day $4.00 $1.60   $30.00 $4.80  
Nevada Valley of Fire Road 115 NV State Park Div W. Park Entrance (Valley of Fire St Park) East Park Entrance 6.37 10.25 Major Collector Rural     X X     Within Valley of Fire State Park                
New Hampshire F.E. Everett Turnpike 118 NH Dept of Trans Massachusetts Line Jct I-293 and St 101 in Bedford 13.70 22.05 Principal Arterial - Other Freeways and Expressways Urban     X X     F.E. Everett Trnpke Total Mi = 44.7                
New Hampshire F.E. Everett Turnpike 118 NH Dept of Trans Massachusetts Line Jct I-293 and St 101 in Bedford 6.40 10.30 Principal Arterial - Other Rural     X X     F.E. Everett Trnpke Total Mi = 44.7                
New Hampshire F.E. Everett Turnpike 118 NH Dept of Trans Massachusetts Line Jct I-293 and St 101 in Bedford 0.70 1.13 Principal Arterial - Other Freeways and Expressways Urban     X X     F.E. Everett Trnpke Total Mi = 44.7                
New Hampshire Henry Bourque Highway (Route 3) 119 NH Dept of Trans NH Rt 101A Daniel Webster Hwy 1.40 2.25 Principal Arterial - Other Urban       X   1.40 Non-toll Section                
New Hampshire Spaulding Turnpike 120 NH Dept of Trans Portsmouth Jct SR 125 in Milton 5.10 8.21 Principal Arterial - Other Freeways and Expressways Urban       X   5.10 Non-toll Section                
New Hampshire Spaulding Turnpike 120 NH Dept of Trans Portsmouth Jct SR 125 in Milton 7.80 12.55 Principal Arterial - Other Rural       X   7.80 Non-toll Section                
New Hampshire Spaulding Turnpike 120 NH Dept of Trans Portsmouth Jct SR 125 in Milton 13.40 21.57 Principal Arterial - Other Freeways and Expressways Urban     X X   3.1                  
New Hampshire Spaulding Turnpike 120 NH Dept of Trans Portsmouth Jct SR 125 in Milton 3.60 5.79 Principal Arterial - Other Urban       X   3.60 Non-toll Section                
New Hampshire Spaulding Turnpike 120 NH Dept of Trans Portsmouth Jct SR 125 in Milton 3.30 5.31 Principal Arterial - Other Urban       X   3.30 Non-toll Section                
New Hampshire Mt. Washington Summit Road 121 Mt. Washington Summit Rd Co SR 16 Mt. Washington 7.00 11.27 local Rural       X     Private                
New Jersey New Jersey Turnpike (Mainline) 152 NJ Trnpke Auth PA Trnpke Ext Deepwater 14.26 22.95 Principal Arterial - Other Rural X   X   E-ZPass   Toll data based on entire mainline   Fixed variable: rate based on time of day $5.45 $4.15 $0.10 $37.15 $18.80 $0.52
New Jersey New Jersey Turnpike (Mainline) 152 NJ Trnpke Auth PA Trnpke Ext Deepwater 37.69 60.66 Principal Arterial - Other Freeways and Expressways Urban X   X   E-ZPass   Toll data based on entire mainline   Fixed variable: rate based on time of day $5.45 $4.15 $0.10 $25.15 $18.80 $0.52
New Jersey New Jersey 495 153 Port Auth of NY & NJ I-95 SR 3 0.80 1.29 Principal Arterial - Other Freeways and Expressways Urban X E     E-ZPass                    
New Jersey Garden State Parkway 154 NJ Trnpke Auth Montvale Cape May 19.89 32.01 Principal Arterial - Other Rural X     X   19.89 Non-toll Section                
New Jersey Garden State Parkway 154 NJ Trnpke Auth Montvale Cape May 4.10 6.60 Principal Arterial - Other Rural X   X   E-ZPass       Fixed variable: rate based on time of day $8.25 $8.25 $0.05 $49.50 $61.35 $0.30
New Jersey Garden State Parkway 154 NJ Trnpke Auth Montvale Cape May 148.41 238.84 Principal Arterial - Other Freeways and Expressways Urban X   X   E-ZPass       Fixed variable: rate based on time of day $8.25 $8.25 $0.05 $49.50 $47.90 $0.30
New Jersey Atlantic City Expressway 155 South Jersey Trans Auth Atlantic City SR 42, Turnersville 12.72 20.47 Principal Arterial - Other Rural X   X   E-ZPass   Toll data based on entire mainline   Fixed: rate based on axle/weight/price based on distance traveled $3.75 $2.43 $0.03 $18.00 $16.20 $0.08
New Jersey Atlantic City Expressway 155 South Jersey Trans Auth Atlantic City SR 42, Turnersville 31.48 50.66 Principal Arterial - Other Freeways and Expressways Urban X   X   E-ZPass   Toll data based on entire mainline   Fixed: rate based on axle/weight/price based on distance traveled $3.75 $2.43 $0.03 $18.00 $16.20 $0.08
New York Gov. Thomas E. Dewey Thruway Berkshire Section 187 NY State Thruway Auth I-87 I-90 5.60 9.01 Principal Arterial - Other Freeways and Expressways Urban X   X   E-ZPass   Based on travel from Buffalo or NYC.     $27.95 $0.40 $0.05 $113.85 $0.67 $0.24
New York Gov. Thomas E. Dewey Thruway Gardenstate Parkway Connection 188 NY State Thruway Auth New Jersey Line Spring Valley 2.40 3.86 Principal Arterial - Other Freeways and Expressways Urban X     X   2.4 Non-toll Section                
New York Whiteface Mountain Vet. Memorial Highway 189 Olympic Regional Dev Auth Wilmington Whiteface Mtn 5.00 8.05 Minor Collector Rural       X     Whiteface Veterans Memorial Highway is a scenic tollroad. $10.00 per vehicle plus driver, $6.00 each additional passenger. Buses of 20 or more are $6.00 per person. In 2012: 27,200 vehicles, 73,100 visitors, $478,799. Revenue open for 144 days.   Fixed: rate based on axle/weight/price based on distance traveled $10.00 $10.00 $3.52      
New York Prospect Mountain Vet. Memorial Highway 190 Dept of Env Conservation US 9 (gate) Top of Prospect Mtn 5.90 9.50 local Rural       X     This is a road to the scenic view at the top of a mountain. No trucks. There's a lower rate for motorcycles and a higher rate for busses - even there it averages out to $10 per vehicle for the year.   Fixed: rate based on axle/weight/price based on distance traveled $10.00 $10.00 $0.67      
North Carolina Triangle Expressway 193 North Carolina Turnpike Authority I-40/NC 147 interchange, Durham County I-540, Wake County 12.60 20.28 Principal Arterial - Other Freeways and Expressways Urban X   X   ETC 3.4 The NCDOT will be requesting NHS designations for a section of this project currently not designated as a future NHS route. Section 129 Toll Agreement Fixed: rate based on axle/weight/price based on distance traveled            
Oklahoma 5/ Indian Nation Turnpike 200 OK Trnpke Auth I-40 near Henryetta US 70 near Hugo 105.20 169.30 Principal Arterial - Other Rural X   X   Pike Pass       Fixed: rate based on axle/weight/price based on distance traveled $5.50 $0.75 $0.05 $22.50 $1.75 $0.21
Oklahoma 5/ Muskogee Turnpike 201 OK Trnpke Auth Tulsa/Broken Arrow I-40 near Weber Falls 53.10 85.46 Principal Arterial - Other Rural X   X   Pike Pass       Fixed: rate based on axle/weight/price based on distance traveled $3.00 $0.50 $0.06 $10.50 $1.75 $0.20
Oklahoma 5/ Cimarron Turnpike 202 OK Trnpke Auth I-35 East of Enid Sand Springs 67.70 108.95 Principal Arterial - Other Rural X   X   Pike Pass       Fixed: rate based on axle/weight/price based on distance traveled $3.00 $0.50 $0.04 $13.50 $2.00 $0.20
Oklahoma 5/ John Kilpatrick Turnpike 203 OK Trnpke Auth I-40 between Mustang Road and Sara Road OKC interchange of Turner Turnpike and I-35 25.30 40.72 Principal Arterial - Other Freeways and Expressways Urban X   X   Pike Pass       Fixed: rate based on axle/weight/price based on distance traveled $2.30 $0.50 $0.09 $9.50 $1.85 $0.38
Oklahoma 5/ Creek Turnpike 204 OK Trnpke Auth I-44/SH 66 Sapulpa US 412 - Admiral 34.40 55.36 Principal Arterial - Other Freeways and Expressways Urban X   X   Pike Pass   Creek Turnpike extends from the Turner Turnpike to Will Rogers Turnpike   Fixed: rate based on axle/weight/price based on distance traveled $2.80 $0.35 $0.08 $11.50 $1.85 $0.33
Oklahoma 5/ Chickasaw Turnpike 205 OK Trnpke Auth SH 1 near Ada SH 7 - West of Sulphur 17.30 27.84 Minor Arterial Rural X   X   Pike Pass 9.8     Fixed: rate based on axle/weight/price based on distance traveled $0.65 $0.65 $0.04 $2.50 $2.50 $0.14
Oklahoma 5/ Cherokee Turnpike 206 OK Trnpke Auth US 412 at Locust Grove US 412 - Arkansas Stateline 32.80 52.79 Principal Arterial - Other Rural X   X   Pike Pass       Fixed: rate based on axle/weight/price based on distance traveled $2.50 $0.25 $0.08 $10.50 $1.75 $0.32
Pennsylvania Mosey Wood Toll Road 213 Vacation Charters Limited Lake Harmony PA 940 2.50 4.02 local Rural     X X     Private                
Pennsylvania Greensburg Bypass 214 PA Trnpke Com US 22 (MP G0.3) New Stanton (MP G13.4) 13.10 21.08 Principal Arterial - Other Rural X   X X                      
Pennsylvania Beaver Valley Expressway 215 PA Trnpke Com SR 51 (MP B31) New Castle Bypass (MP B13.7) 17.30 27.84 Principal Arterial - Other Rural X   X X                      
Pennsylvania Monvalley Expressway 216 PA Trnpke Com US 40 (MP M30) I-70 (MP M35.6) 5.60 9.01 Principal Arterial - Other Freeways and Expressways Urban X   X X                      
Pennsylvania Monvalley Expressway 216 PA Trnpke Com I-68 (MP M0) PA Rt 43 (MP M7.8) 7.80 12.55 Principal Arterial - Other Freeways and Expressways Urban X   X X                      
Pennsylvania Monvalley Expressway 216 PA Trnpke Com I-70 (MP M35.6) PA Rt 51 (MP M53.5) 17.90 28.81 Principal Arterial - Other Freeways and Expressways Urban X   X X                      
Pennsylvania Toll Road 576 (Southern Beltway) Findlay Connector 311 PA Turnpike Commission Pittsburgh International Airport - I376 and PA60 (MP S1) US Route 22 (MP S6) 6.50 10.46 Principal Arterial - Other Freeways and Expressways                                
Pennsylvania Mon-Fayette Expressway: Uniontown to Brownsville 217 PA Turnpike Commission US 119 (MP M13.5) US 40 (MP M30) 16.50 26.55 Principal Arterial - Other Freeways and Expressways                                
Puerto Rico Rafael Martínez Nadal Expressway (PR-20) 294 Puerto Rico Highway and Transportation Authority PR-1 (Guaynabo) PR-199 Access (Guaynabo) 1.60 2.57 Principal Arterial - Other Freeways and Expressways Urban X N   X     Guaynabo Toll Plaza. Auto Expresso Laneas: 14, 15     $0.75 $0.75 $0.47 $2.75 $0.75 $0.34
Puerto Rico Expreso Rio Hondo (PR-5) 295 Metropistas PR-199 PR-174 2.02 3.25 Principal Arterial - Other Freeways and Expressways Urban X N     Radio Frequency ID (Auto Expreso) 2 lanes   Bayamón Toll Plaza. Lanes 14-15     $0.50 $0.50 $0.25 $3.50 $0.50 $0.99
South Carolina Cross Island Parkway (US 278) 221 South Carolina Deptartment of Transportation US 278 Business Palmetto Bay Road 7.50 12.07 Principal Arterial - Other Rural X   X   Palmetto Pass (transponder)   Truck toll fee is dependent on the number of axles. It is either $1.00 for first two axles or $0.50 if they utilize the Palmetto Pass and $0.75 for each additional axle.   Fixed: rate based on axle/weight/price based on distance traveled $2.25 $0.75 $0.20 $5.25 $4.75 $0.67
Texas Dallas North Tollway 247 North TX Tollway Authority (NTTA) IH-35E US 380 30.09 48.43 Principal Arterial - Other Urban X   X   Automatic Vehicle ID (AVI) & video enforcement       Fixed: rate based on axle/weight/price based on distance traveled $6.95 $0.23 $0.15 $34.75 $0.46 $0.45
Texas Sam Houston Tollway - East 248 Harris County Toll Road Authority SH 3 SH 225 7.30 11.75 Principal Arterial - Other Urban X   X   Automatic Vehicle ID (AVI)       Fixed: rate based on axle/weight/price based on distance traveled $1.75 $0.75 $0.17 $8.75 $1.50 $0.72
Texas Sam Houston Tollway - West 249 Harris County Toll Road Authority US 59 S IH 45 N 25.66 41.30 Principal Arterial - Other Urban X   X   Automatic Vehicle ID (AVI)       Fixed: rate based on axle/weight/price based on distance traveled $5.25 $0.75 $0.15 $26.25 $1.50 $0.63
Texas Sam Houston Tollway - SW Belt 250 Harris County Toll Road Authority US 59 S SH 288 10.88 17.51 Principal Arterial - Other Urban X   X   Automatic Vehicle ID (AVI)       Fixed: rate based on axle/weight/price based on distance traveled $1.75 $0.75 $0.10 $8.75 $1.50 $0.46
Texas Sam Houston Tollway - SE Belt 251 Harris County Toll Road Authority SH 288 IH 45 S 9.74 15.68 Principal Arterial - Other Urban X   X   Automatic Vehicle ID (AVI)       Fixed: rate based on axle/weight/price based on distance traveled $1.75 $0.75 $0.13 $8.75 $1.50 $0.54
Texas Hardy Toll Road 252 Harris County Toll Road Authority IH 45 N IH 610 N 21.08 33.92 Principal Arterial - Other Urban X   X   Automatic Vehicle ID (AVI)       Fixed: rate based on axle/weight/price based on distance traveled $3.50 $0.75 $0.12 $17.50 $1.50 $0.50
Texas Westpark Tollway 253 Harris County Toll Road Authority IH 610 W Fort Bend County Line 13.20 21.24 Principal Arterial - Other Freeways and Expressways Urban     X   EZ Tag   EZ Tag only facility. Does not include Fort Bend County's portion.   Fixed: rate based on axle/weight/price based on distance traveled $2.80 $0.40 $0.08 $17.50 $1.00 $0.37
Texas President George Bush Turnpike 254 North TX Tollway Authority (NTTA) Belt Line Road SH 78 29.73 47.85 Principal Arterial - Other Freeways and Expressways Urban X   X   Automatic Vehicle ID (AVI) & video enforcement       Fixed: rate based on axle/weight/price based on distance traveled $6.88 $0.23 $0.15 $34.40 $0.46 $0.45
Texas President George Bush Turnpike - Western Extension 254 North TX Tollway Authority (NTTA) SH 183 IH 20 11.84 19.05 Principal Arterial - Other Freeways and Expressways Urban     X   Automatic Vehicle ID (AVI) & video enforcement       Fixed: rate based on axle/weight/price based on distance traveled $2.75 $0.23 $0.15 $13.75 $0.46 $0.45
Texas President George Bush Turnpike-Eastern Extension 254 north TX Tollway Authority(NTTA) SH 78 IH 30 9.92 15.97 Principal Arterial - Other Freeways and Expressways Urban     X   Automatic Vehicle ID (AVI) & video enforcement       Fixed: rate based on axle/weight/price based on distance traveled $2.28 $0.23 $0.15 $11.40 $0.46 $0.45
Texas Camino Colombia 255 Texas Department of Transportation IH 35 Colombia Solidarity Bridge 22.50 36.21 Principal Arterial - Other Freeways and Expressways Rural X   X   Automatic Vehicle ID (AVI)   Implemented all-electronic toll collection on Dec.1, 2008 Section 129 Toll Agreement Fixed: rate based on axle/weight/price based on distance traveled $3.99 $3.00 $0.09 $19.95 $9.00 $0.36
Texas US 183-A 256 Central Texas Regional Mobility Authority SH45 South of US 183 in Leander 11.60 18.67 Principal Arterial - Other Freeways and Expressways Urban     X   All Electronic Tolling (with Video Tolling)   Implemented all-electronic toll collection on Dec.1, 2008 Section 129 Toll Agreement Fixed: rate based on axle/weight/price based on distance traveled $3.81 $0.37 $0.25 $19.05 $0.74 $0.74
Texas Fort Bend Parkway Extension 257 Harris County Toll Road Authority Sam Houston Tollway Southwest US 90A 2.08 3.35 Principal Arterial - Other Freeways and Expressways Urban     X   Automatic Vehicle ID (AVI)   Does not include Fort Bend County's portion.   Fixed: rate based on axle/weight/price based on distance traveled $1.75 $1.40 $0.63 $8.75 $3.50 $2.69
Texas 5/ SH 45 258 Texas Department of Transportation Ridgeline Blvd SH 130 13.20 21.24 Principal Arterial - Other Freeways and Expressways Urban X   X   All Electronic AVI with pay by mail video tolling   Implemented all-electronic toll collection on Dec.1, 2008 Section 129 Toll Agreement Fixed: rate based on axle/weight/price based on distance traveled $2.72 $0.68 $0.16 $8.16 $1.36 $0.48
Texas 5/ SH 45 SE 259 Texas Department of Transportation US 183 IH 35 10.00 16.09 Principal Arterial - Other Freeways and Expressways Urban X   X   All Electronic AVI with pay by mail video tolling   Implemented all-electronic toll collection on Jan 1, 2013 Section 129 Toll Agreement Fixed: rate based on axle/weight/price based on distance traveled $1.33 $0.68 $0.14 $6.65 $2.63 $0.53
Texas SH 130 260 Texas Department of Transportation IH35 N or Georgetown US 183 S of ABIA 49.00 78.86 Principal Arterial - Other Freeways and Expressways Rural X   X   All Electronic AVI with pay by mail video tolling   Implemented all-electronic toll collection on Jan 1, 2013 Section 129 Toll Agreement Fixed: rate based on axle/weight/price based on distance traveled $9.00 $0.45 $0.14 $27.00 $1.35 $0.42
Texas Loop 49 261 Northeast Texas Regional Mobility Authority SH 155 US 69 5.10 8.21 Principal Arterial - Other Freeways and Expressways Rural X   X   All Electronic AVI with pay by mail video tolling   Road tranistioned from Texas Department of Transportation operation to Northeast Texas Regional Mobility Authority on March 28, 2013. Section 129 Toll Agreement Fixed: rate based on axle/weight/price based on distance traveled $1.00 $0.25 $0.15 $4.25 $1.25 $0.45
Texas Sam Rayburn Tollway 262 North TX Tollway Authority (NTTA) Denton Tap US 75 25.46 40.97 Principal Arterial - Other Freeways and Expressways Urban X   X   Automatic Vehicle ID (AVI) & video enforcement 1.93     Fixed: rate based on axle/weight/price based on distance traveled $5.40 $0.23 $0.15 $27.00 $0.46 $0.45
Texas 5/ Loop 1 263 Texas Department of Transportation Parmer Lane SH 45 3.50 5.63 Principal Arterial - Other Freeways and Expressways Urban X   X   All Electronic AVI with pay by mail video tolling   All electronic collection began 01 Jan 2013. Section 129 Toll Agreement Fixed: rate based on axle/weight/price based on distance traveled $1.36 $0.68 $0.26 $4.08 $1.36 $0.78
Texas Hardy Airport Connector 252 Harris County Toll Road Authority Hardy Tollroad JFK Blvd 1.72 2.77 Principal Arterial - Other Freeways and Expressways Urban     X   Automatic Vehicle ID (AVI) 1.27     Fixed: rate based on axle/weight/price based on distance traveled $1.00 $1.00 $0.53 $5.00 $2.75 $2.60
Texas Westpark Tollway - Fort Bend County 253 Fort Bend County Toll Road Authority FM 1464 GP 99 6.00 9.66 Principal Arterial - Other Freeways and Expressways Urban     X   Automatic Vehicle ID (AVI)       Fixed: rate based on axle/weight/price based on distance traveled $1.20 $1.20 $0.20 $3.25 $1.00  
Texas Fort Bend Parkway Extension - Fort Bend County 257 Fort Bend County Toll Road Authority BW 8 SH 6 6.20 9.98 Principal Arterial - Other Freeways and Expressways Urban     X   Automatic Vehicle ID (AVI)       Fixed: rate based on axle/weight/price based on distance traveled $1.25 $0.35 $0.20 $6.25 $4.00  
Texas Chisholm Trail Parkway 321 North TX Tollway Authority (NTTA) IH 30 US 67 28.60 46.03 Principal Arterial - Other Freeways and Expressways       X   Automatic Vehicle ID (AVI) & video enforcement   Under Construction. Facility not open for traffic   Fixed: rate based on axle/weight/price based on distance traveled $7.37 $0.28 $0.21/$0.16 $36.85 $0.56 $0.63/$0.48
Texas Sam Houston Tollway- NE 322 Harris County Toll Road Authority Wallisville Road Old Humble Road 12.97 20.87 Principal Arterial - Other Rural/Urban X   X   EZ Tag   EZ Tag only facility.   Fixed: rate based on axle/weight/price based on distance traveled $1.40 $0.50 $0.08 $8.75 $1.25 $0.38
Texas DFW Connector 323 Texas Department of Transportation SH 121/SH 114 DFW International Airport 4.00 6.44 Principal Arterial - Other Freeways and Expressways Urban X   X   All Electronic AVI with pay by mail video tolling   Under construction   Fixed variable: rate based on time of day            
Texas SH99 (Grand Parkway) - Segment I-2 324 Texas Department of Transportation IH 10 FM 1405 (Fisher Road) 6.60 10.62 Principal Arterial - Other Freeways and Expressways Urban X   X   Automatic Vehicle ID (AVI) & video enforcement       Fixed: rate based on axle/weight/price based on distance traveled $1.00 $1.00 $0.18 $5.00 $2.00 $0.53
Texas SH99 (Grand Parkway) - Segment E 325 Texas Department of Transportation IH 10 US 290 15.67 25.22 Principal Arterial - Other Freeways and Expressways Urban X   X   Automatic Vehicle ID (AVI) & video enforcement   Under Construction   Fixed: rate based on axle/weight/price based on distance traveled            
Texas SH99 (Grand Parkway) - Segments F-1, F-2, and G 326 Texas Department of Transportation US 290 US 59 37.80 60.83 Principal Arterial - Other Freeways and Expressways Urban X   X   Automatic Vehicle ID (AVI) & video enforcement   Under Construction   Fixed: rate based on axle/weight/price based on distance traveled            
Texas SH 130 Seg 5/6 327 Texas Department of Transportation US 183 S of ABIA IH 10     Principal Arterial - Other Freeways and Expressways Rural X   X   All Electronic AVI with pay by mail video tolling       Fixed: rate based on axle/weight/price based on distance traveled $8.21 $0.41 $0.15 $34.33 $0.80 $0.45
Texas Loop 375 (Cesar Chavez Managed Lanes) 328 Camino Real Regional Mobility Authority US 54 Zaragosa Road 8.90 14.32 Principal Arterial - Other Freeways and Expressways Urban X   X   All Electronic AVI with pay by mail video tolling   Under Construction   Fixed variable: rate based on time of day            
Texas SH 550 330 Cameron County Regional Mobility Authority 0.5 mi. east of FM 1847 0.5 mi. West of FM1847 1.00 1.61 Principal Arterial - Other Urban X   X   All Electronic AVI with pay by mail video tolling   All electronic collection.   Fixed: rate based on axle/weight/price based on distance traveled $0.67 $0.46 $0.17 $5.00 $3.00 $0.50
Texas Manor Expressway - Phase 1 331 Central Texas Regional Mobility Authority US 183 Springdale Road 1.20 1.93 Principal Arterial - Other Freeways and Expressways Urban     X   All Electronic Tolling (with Video Tolling)     Section 129 Toll Agreement Fixed: rate based on axle/weight/price based on distance traveled $0.67 $0.50 $0.39 $3.35 $1.00 $1.18
Texas Manor Expressway - Phase 2 332 Central Texas Regional Mobility Authority Springdale Road Parmer Lane 5.00 8.05 Principal Arterial - Other Freeways and Expressways Urban     X   All Electronic Tolling (with Video Tolling)   Under Construction. Anticipated to open to traffic in Feb. 2014 Section 129 Toll Agreement Fixed: rate based on axle/weight/price based on distance traveled $2.11 $1.59 $0.26 $10.57 $3.18 $0.77
Utah Adams Avenue Parkway 268 Adams Avenue Parkway I-84 (Exit 85) 5900 South 1.00 1.61 Minor Arterial Urban     X X     Private $1.00 for the typical 2-axle vehicle. $.50 for each additional axle   Fixed: rate based on axle/weight/price based on distance traveled   $1.00     $1.50  
Vermont Equinox Sky Line Drive 269 Dr. Joe G. Davidson; Manchester SR 7A - Sunderland Mt. Equinox 5.40 8.69 local Rural   N   X     Private                
Vermont Mt. Mansfield Toll Road 270 Mt. Mansfield Co, Inc. SR 108 Mt. Mansfield 4.50 7.24 local Rural   N   X     Private                
Vermont Burke Mountain Toll Road 271 Burke Mtn Recreation, Inc. TH 7 Burke Mtn 2.00 3.22 local Rural   S   X     Private                
Virginia Powhite Parkway Extension (SR 76) 276 Virginia Department of Transportation Chippenham Parkway Route 288 9.44 15.19 Principal Arterial - Other Freeways and Expressways Urban X   X   Automatic Vehicle ID (AVI) - E-ZPass 0.79 The minimum passenger vehicle toll is based on exiting the facility prior to the main line plaza. The minimum truck toll fee is based on a three-axle vehicle while the maximum is based on a six-axle vehicle.   Fixed: rate based on axle/weight/price based on distance traveled $0.75 $0.25   $1.50 $1.00  
Virginia Powhite Parkway (SR 76) 276 Richmond Metropolitan Authority Chippenham Parkway (Route 150) Interstate 195 3.26 5.25 Principal Arterial - Other Freeways and Expressways Urban X   X   Automatic Vehicle ID (AVI) - E-ZPass   The maximum truck toll is based on a five-axle vehicle; a four-axle vehicle would be $ .90 and a three-axle vehicle would be $ .80.   Fixed: rate based on axle/weight/price based on distance traveled $0.70 $0.70   $1.00 $0.80  
Virginia Downtown Expressway (SR 195) 277 Richmond Metropolitan Authority Interstate 95 Interstate 195 3.39 5.46 Principal Arterial - Other Freeways and Expressways Urban X   X   Automatic Vehicle ID (AVI) - E-ZPass   The maximum truck toll is based on a five-axle vehicle; a four-axle vehicle would be $ .90 and a three-axle vehicle would be $ .80.   Fixed: rate based on axle/weight/price based on distance traveled $0.70 $0.70   $1.00 $0.80  
Virginia Washington-Dulles Access and Toll Road/Route 267 (Hirst-Brault Expressway) 279 Virginia Department of Transportation Interstate 66 Route 28 (Dulles International Airport) 13.43 21.61 Principal Arterial - Other Freeways and Expressways Urban X   X   Automatic Vehicle ID (AVI) - E-ZPass   The minimum passenger vehicle toll is based on exiting the facility prior to the main line plaza. The minimum truck toll fee is based on a three-axle vehicle on the main line; each additional axle is $0.25 up to $2.25.   Fixed: rate based on axle/weight/price based on distance traveled $1.25 $0.75   $2.25 $1.50  
Virginia Dulles Greenway (Hirst-Brault Expressway) 280 Toll Road Investors Partnership II (TRIP II) Route 7 & Route 15 Bypass at Leesburg ECL Leesburg 0.69 1.11 Principal Arterial - Other Freeways and Expressways Urban     X     0.69 Non-toll Section                
Virginia Dulles Greenway (Hirst-Brault Expressway) 280 Toll Road Investors Partnership II (TRIP II) ECL Leesburg Route 659 - Belmont Ridge Road 4.79 7.71 Principal Arterial - Other Rural     X   Automatic Vehicle ID (AVI) - E-ZPass   The toll is less at certain exits for those with E-ZPass. The toll is more during rush hour (congestion management toll). Maximum passenger toll based on last exit on this section during rush hour without E-ZPass; minimum based on first exit during non-rush hour with E-ZPass. Maximum truck toll based on a six-axle vehicle at last exit during rush hour without E-ZPass; the minimum truck toll based on a three-axle vehicle at the first exit during non-rush hour with E-ZPass.   Fixed variable: rate based on time of day $3.80 $2.15   $13.30 $4.30  
Virginia Dulles Greenway (Hirst-Brault Expressway) 280 Toll Road Investors Partnership II (TRIP II) Route 659 - Belmont Ridge Road Route 28 (at Dulles Airport) 7.05 11.35 Principal Arterial - Other Freeways and Expressways Urban     X   Automatic Vehicle ID (AVI) - E-ZPass   The toll is less at certain exits for those with E-ZPass. The toll is more during rush hour (congestion management toll). Maximum passenger toll based on last exit on this section during rush hour without E-ZPass; minimum based on first exit during non-rush hour with E-ZPass. Maximum truck toll based on a six-axle vehicle at last exit during rush hour without E-ZPass; the minimum truck toll based on a three-axle vehicle at the first exit during non-rush hour with E-ZPass.   Fixed variable: rate based on time of day $5.25 $2.55   $17.50 $5.10  
Virginia Chesapeake Expressway (SR 168) 281 City of Chesapeake Hillcrest Parkway Gallbush Road 6.40 10.30 Principal Arterial - Other Freeways and Expressways Urban X   X   Automatic Vehicle ID (AVI) - E-ZPass   The maximum passenger toll is based on weekends during peak season (Memorial Day-Labor Day); minimum is based on off-peak. The maximum truck toll is based on weekends during peak season regadless of axles; minimum is based on off-peak. There is a discount for locals ($2.00 off the peak rate and $0.75 off the non-peak rate).   Fixed: rate based on axle/weight/price based on distance traveled $6.00 $3.00   $7.00 $4.00  
Virginia Pocahontas Parkway/Airport Connector (Route 895) 282 Transurban Group Route 150 (Chippenham Parkway) Interstate 295 10.12 16.29 Principal Arterial - Other Freeways and Expressways Urban X   X   Automatic Vehicle ID (AVI) - E-ZPass   The maximum passenger toll ais based on rush hour on the main line while the minimum passenger toll is based on non-rush hour on the main-line. Early exits are $1.25. The maximum truck toll fee is $3.00 + $1.00/axle over two axles regardless of time of day; the rate indicated is based on a six-axle vehicle; the minimum is based on 3 axles. Section 129 Toll Agreement Fixed: rate based on axle/weight/price based on distance traveled $3.00 $2.75   $7.00 $4.00  
Washington SR 167 - HOT Lanes 309 Washington State Department of Transportation Auburn, WA Renton, WA 14.48 23.30 Principal Arterial - Other Freeways and Expressways Urban X   X   Automatic Vehicle ID (AVI) - Good To Go       Dynamic variable: rate based on current traffic conditions $0.50 $9.00        

1/ The length of structures includes approaches and connecting links which were financed as an integral part of the toll project. The length of toll bridges includes approach sections which may be used toll free by local residents. The length of such sections is identified in the "non-toll" column.

2/ Functional Class Codes: 1 - Interstate, 2 - Other Freeways & Expressways, 3 - Principal Arterial, 4 - Minor Arterial, 5 - Major Collector, 6 - Minor Collector, 7 - Local;

3/ If facility is not entirely on the National Highway System (NHS), the length breakdown is in the Remarks column.

4/ Excludes toll transactions that require stopping (i.e., cash, ticket, or token payment).

5/ The FHWA Office of Program Administration has no record of the Section 129 Toll Agreement.